HomeMy WebLinkAbout1988-06-30 Septic System Site Evaluation ReportSITE EVALUATION REPORT APR 1
FOR PEGGY PITMAN Q ,,)89
OF LOT 2, BLOCK 1, JANET ACRES
ORONO, MINNESOTA ill
1 1 :;
Additional information follows for the design of a pressure
mound system needed for the above property. In addition, two septic
tanks of at least 1000 gallons are needed.and a third pumping tank
of at least 750 gallons is required to house the pump. An alarm de-
vice should _be used to warn of pump failure.
All construction and materials must adhere to the provisions
of the City of Orono. No grading or construction traffic is permit-
ed on both the primary and the alternate drainfield sites. Runoff
water must be diverted from the mound area.
If any other information is needed, please contact me.
Sincerely,
PERCOR, INC.
/A.4.z-1
bark S. Gronberg