Loading...
HomeMy WebLinkAbout1994-05-24 On Site Sewage Treatment Inspection ReportCITY OF ORONO Municipal Offices Post Office Box 66 Crystal Bay, MN 55323-0066 ON -SITE SEWAGE TRZATMM INSPECTION REPORT Owner: kit�nTI LVh1t3r,, Address: F _72AS y-jy jlc- Permit #is: Dates: Contractors: _ IFj,r g nsnY-, City ordinance number 100 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sewage treatment system at the above address has been inspected and appears to fall into the category checked below. (This is A an existing system I ) new construction) "CODE SYSTEM11-A system which meets all the location, design, and construction standards of the current City Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input without discharging any pollutants into grand or surface waters. "CONFORMING SYSTEM" -A system which does not meet all the location, design, and construction standards of the current City Codes, but was installed according to the code in effect at the time of installation, and which is operating satisfactorily by treating and disposing of the entire current sewage input without discharging any pollutants into ground or surface waters. "NOM-CONFORMING SYSTEM'I-A prohibited system; a system located within a designated 100-year floodplain; any system which any or may not meet all the location, design, and construction standards of the current City Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand between the distribution device and the limiting soil characteristics. (The limiting soil characteristic has or I 1 has not been identified at t is time. If the limiting soil characteristic has not been identifled, this classification may be subjec: to revision.) Toinspection indicates: �L Pnwpout not needed at this time. 6 Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems. 7 Solids accumulation in tanks is at a critical level. Yanks should be ptwped out as soon as possible. d System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge 9 Inspection risers missing -tanks could not be inspected. inspection risers (<" dia. pipe) must be installed in. each tank at next puepout. If tanks have not been pumped out within the last three years, they should be pumped out now. 10 Inspection pipe is located directly over tank baffle (does not give accurate messuraannt of solids accumulation). If tanks have not been pumped out within the last three years, they should be pumped out now. 01field inspection indicates: 11 Orsinfield is dry, no surfacing evident. Some evidence of surfacing, not critical yet. 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector immediately. Repairs must be completed within 90 days. 14 Drainfield extent and condition unknown. LIMITING SITE FACTORS (slope.setbacks etc.): POTENTIAL FOR SYSTEM FAILURE (depends on soils water table etc ): COMMENTS: Date of Inspection Sept c System Inspector Note: in the event that this inspection report is used to satisfy the requiremen!s for a martg property, be advised that this report does not guarantee or certify that an existing system wiage or other transfer of it continue to function properly] but is merely an opinion of the adequacy of the system under current conditions based on the available information. This report must be kept on the premises with the system location and pumping records. WHITE COPY Inspectors FIN YELLOW COPY hlomaowner