Loading...
HomeMy WebLinkAbout1992-12-21 Septic System Approval"" 0.\ CITY OF ORONO "' SEPTIC SYSTEM APPROVAL _ CITY of ORONO c►r.a 0"6 rr.ra. ss>ooK A404 LOCATION: OWNER: Ask_ GENERAL CONTRACTOR: SEPTIC CONTRACTOR: SITE EVALUATOR: J r �i�^.�i REPORT DATE: I a,l 9a The City of Orono has Ld► Z' Aj your on -site system design as ofPWI 90� (appro -disapproved) (date) with the following THIS IS NOT A PERMIT. This is a design approval fortt: which must accompany the site plan. A permit mtist be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is enclosed. NOTICE TO INSTALLERS: Any changes to the approved plans said specs must have prior approval of the Inspector (473-7337). Call for hopecxions 24 hours in advance. ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain in place until final site grading. Approval to pour footings will not be granted until the Inspections Department has verified that primary and alternate sites are adequately protected. NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' of tested drainfield sites either before or after system construction. Compaction of these areas could render than unusable prohibiting the timely completion and or limiting the long term use of the property. A site copy will be available at the City Offices for the septic contractor. CITY OF ORONO By St cckrrtart, On -site Systems Manager TELEt7KM - 473.730 • FAX .173-0SN