HomeMy WebLinkAbout1992-12-21 Septic System Approval"" 0.\ CITY OF ORONO
"' SEPTIC SYSTEM APPROVAL
_ CITY of ORONO
c►r.a 0"6 rr.ra. ss>ooK
A404
LOCATION:
OWNER: Ask_
GENERAL CONTRACTOR:
SEPTIC CONTRACTOR:
SITE EVALUATOR: J r �i�^.�i REPORT DATE: I a,l 9a
The City of Orono has Ld► Z' Aj your on -site system design as ofPWI
90�
(appro -disapproved) (date)
with the following
THIS IS NOT A PERMIT. This is a design approval fortt: which must accompany the site plan. A permit mtist
be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is
enclosed.
NOTICE TO INSTALLERS: Any changes to the approved plans said specs must have prior approval of the
Inspector (473-7337). Call for hopecxions 24 hours in advance.
ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain
in place until final site grading. Approval to pour footings will not be granted until the Inspections Department
has verified that primary and alternate sites are adequately protected.
NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20'
of tested drainfield sites either before or after system construction. Compaction of these areas could render than
unusable prohibiting the timely completion and or limiting the long term use of the property.
A site copy will be available at the City Offices for the septic contractor.
CITY OF ORONO
By
St cckrrtart, On -site Systems Manager