Loading...
HomeMy WebLinkAbout1555 Orchard Beach Place - Point Of Sale Inspection - Compliantk �• /Ob / 0 3 Date Called in DateScheduled ol—lro—.15 City Of Orono Point of Sale Sant Sewer Service I&I Compliance Inspection Form Property Address: ALM PA L PID: Owner Information Name W rjA S d G Mailing Address: (if dinerent from Pm Oly Plione JqSZ Q S '(d Email: ✓MA X4 Orr, Ins ector luformation Name: C= � aOrti tni n ��a� w , � In G1��n I �► License number: Phone: Z Email: I S stem Standard Pass Fail Roof Drains Roof drains and leaders Rbof drains should not be connected to the sanitary sewer but should discharge to the ground outside of a building. If the roof 1 drains are connected to the sanitary sewer, disconnect them, plug any open /}(` connections to'the sanitary sewer using a non -shrink permanent material, and redirect the roof drains onto the ground outside the building. Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected A 1A to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump / system includes drain tile, a sump pit, a sump pump, a float or switch. and a �V drain line. Sump pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (I/1) Compliance Inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and specifications. (Details on backof this sheet) Notes: ThSp.ta+td Qy Cty /Z-I•Zo2S ViAto ►rev;cw pasSzA mspeCh�tvi —:n"v ty rtetFwi, V+ikiaiit5 5veevviSoV Com liant . C) Corrective Action Re, uired Certificate of Compliance Expires: I orrec iv Action Due by: Date: I g I Si nature:' a�o257� 1 Name: olb i L w" e Service Line Inspection Details IS. cowl Weather Conditions: f .� Approxii iiate Depth of Service Type and Size of Service , Overall Condition of Service Pipe Please note :ill conileitipns, tittings, points of concern on service line including infiltration, tree root, cracks, misaligned,joints, etc. This report must include a digital copy of the 'televising. Feet Comment Example% 0 Start for 4" cleanout in NE corner of Basement 140 Misaligned joint Anfiltration 0 +Vic� c/o in A r&) Q'*3 ° 36AS �,� s" p� � Ib3� G[eftv�' Col o, _ ..;, . ,, • // .... �oNo� . �� Private Property Inflow• And Infiltration Inspection Procedures �'%t,,,�., � r For Contractors.• The following instructions and standards are intended for property owners and their contractors when choosing to use a private contractor to complete the Point of Sale Sanitary Sewer Service Inflow and Infiltration (I/I) Inspection. Private inspection contractors will need to complete the inspection using the City of Orono's Inflow/Infiltration Inspection Form, available on the City website. Inspectors will require access to the basement or lowest level in the home or building and access to all sewer cleanouts, sump pump(s), and sump pump plumbing. The televised portion of the I/I inspection is to note defects in the sanitary sewer lateral, which result in infiltration and ex -filtration. The purpose of the private property inflow and infiltration (I/I) inspection is to reduce the flow of clear water into the sanitary sewer system via cross connections (inflow) from sump pumps, foundation drains, roof leaders, cisterns, and other clean water sources .connected to the sanitary sewer system. Jn addition, the program aims to reduce indirect flow of clean water into the sanitary sewer system (infiltration) throe h i e and i e 'oint'defects. _ . :�iideo../ Pictiire�Standards.� - : , ' � � � � • ' • The video report will be in a MPEG format • Still photos will be in a JPEG format r. Video reports can be submitted on thumb drives or a USB Bard drive. Reference the start and end of each video segment as it begins. Footages along the sewer service line must be shown on the video report. �•�' The video camera shall be guided forward at a moderate to slow pace along the bottom of the pipe. • The camera shall stop at any connection. �' .The camera,shall stop at any unusual instances that are viewed while in progress and provide a more etailed and Ion er�view of the s ecific instance (i.e. —bad 'oint, dirt in lines, settlement in line, etc.). Sewer Service Ins : ection Criteria And.Piocess'� .��• � - � _ -. � �� � . - • • .• ?•; Inflow/Infiltratiori'Compliance Inspection form - •All floor drains will need to be opened and 'must be completely flled�out for the inspection to inspected (include photos of the drain, the be complete. '. surrounding area, and the nearest foundation �� The inspector is required to note all defects and � v✓all)!-;:. � ' " footage location in the sanitary sewer lateral on •Any foundation drains found will need to be the compliance inspection form and an audio opened and the discharge point verified (include description recorded on USB Thumb drive or hard photos). drive. •All external drains will need to be opened and • The sewer service inspection must the service � • 'the discharge point verified pipe from before it exits the building to�the sewer � � � Defects/items that require documentation main. .. � include, but are not limited to: • •All connections must be verified by flowing - ➢roots . •water into drains; referencing the. source; and � ➢offset pipe joints •reporting them on the video , .. ➢mineral deposits 'Any conne� tioii that�cannot be verified is ➢unknown deposits -considered to bean unknown connecfion�and�: •; ; ';:' y sag/ptpe deflection• / must be exposed to verify source. � � - ➢cracked pipes • All�clean u s a e reguired'to.be opened�and. � ➢chipped pipes inspected (in Jude phofo's Hof the opened, cleanout . D Pipe size transitions riser); cleanout inspection requires documented •' ➢ length of service footage location on the form and�audio- ➢location. of all cleanouts . ,'description recorded -on USB�'I'humli drive or hard ➢broken /damaged or missing pipe `drive.: - • � '. -� � � � . ' � � ' •: foundation drain connections (including . ' �. • � � photos). .. - � � � � • � .� � •Pagel of t Private Property In{]ow And Infiltration Inspection Procedures For Contractors Sewer 5e►•vice Further Investigation Issues Properties found in need of further investigation have one or more of the fol lowing: • unable to access sewer lateral due to t►n-located cleanouts (behind walls, under flooring, etc) • unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc • unknown connections (unable to verify connection flowing water into sewer lateral) Sump Punip/Roof Leader Inspection Criteria And Process • Inflow/Infiltration Compliance Inspection form •Correctly plumbed sump pump discharges must have the "Sump Ptiinps" and "Foundation outside of the building using rigid pipe. Pipe Drains" sections completely filled out for the discharge should be a minimum of 10-feet from inspection to be complete. building. • Every sump pump on the property is required to •Sump pumps that do not discharge outside be inspected (including photos of the opened are incorrectly plumbed and are considered baskefi, the surrounding area, and the .discharge non -compliant. pipe, both interior and exterior). Total number of •Roof leaders ate required to discharge outside sump pumps must be noted. � of the building; any roof leaders and or cisterns • Sump pump discharge piping is required to be discharging into foundation drains are non- rigidpipe. Flexible pipe, shut off valves, compliant: lumbin tees, and es are not allowed. Completed Inspection � � , � �... � . • Property owner is to sign the completed •The City will issue either a Certificate of Inflow/Infiltration Compliance Inspection form and Compliance or a Correction Notice once the retain a copy .for their records. � � review is complete. If a correction notice is • A copy ofthe completed Inflovrlinfiltration issued, the required repairs must be made and a Compliance Inspection form and video link is � post repair televised inspection must be required to be delivered to the City of'Orono for performed in•order to receive Certificate of review. � Compliance. • The City's Utilities Supervisor or his/her •The completed forms will be mailed to the designee will review the video and compare it with � address on the lnflow/Infiltration Compliance the completed Inflow/Infiltration Compliance Inspection form, unless a different address is Ins ection form noted. "Contractor's Signature" - � � � . Contractor completing the Inflow and Infiltration Compliance Inspection has read and understands the conditions ofthe Private Properly lnflow and, Infiltration Inspection Procedures for Contractors. Company name Inspector name . .-. ` wE2 � r+a01,N C,LfGAlU1 �a S�4 i�a� Copy of plumbers license � . On .file Ll � ZG �2�{ f �ir) Attached License number � - Bond Date . ,. • SEGV � � . �tail''Use burl + , ; �; � ;' � .. .. .. . . .r.,,.hr.., Ay. • • .Date Received; Staff dame and Signature . - Page 2 of 2 �-