HomeMy WebLinkAbout1995-05-31 On Site Sewage Treatment Inspection ReportCITY OF ORONO Municipal Offices Post Office Box 66 Crystal Bay, MN 55323-0066 ON -SITE SEWAGE TREATiENT INSPECTION REPORT Owner:=1F Address: Permit #'s: Dates: Contractors: _L! yl r, City ordinance number 100 requires that The on -site sewage treatment system at checked below. each on -site sewage the above address treatment system in Orono has been inspected and be inspected on a regular basis. appears to fall into the category (This is (1� an existing system I ) new construction) SYSTEM CONFORMITY (1.3): t 1 "CODE SYSTEM" -A system which meets all the location, design, and construction standards of the current City Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input without discharging any pollutants into ground or surface waters. 2 "CONFORMING SYSTEM" -A system which does not meet all the location, design, and construction standards of thr current City Codes, but was installed according to the code n effrct at the time of installation, and whit is operating satisfactorily by treating and disposing ^J tl,e entire current sewage input without discharging any pollutants into ground or surface waters. 3 "NON -CONFORMING SYSTEM" -A prohibited system; a system located within a designated 100-year floodplain; any system which may or may not meet all the location, design, and construction standards of the current City Codes and which is failing for any reason; ind anY;ysiem wit_�__h lest -theta ifggLof y[t��[yt� �y between the distribution device and he limiting soi`7characteristics. -� (The limiting soil characteristic ha, r I I has not been identified A this ti If the limiting soil characteristic has not been identified, this classification may be subject to revision.) TANK CONDITION (5-10): Tank inspection indicates: 5 Puapout not needed at this time. 6 Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems. 7 Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible. 8 System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge. 9 inspection risers missing -tanks could not be inspected. Inspection risers (4" dia. pipe) must be installed in each tank at next pumpout. If tanks have not been pumped out within the last three years, they should be pumped out now. (1) inspection pipe is located directly over tank baffle (does not give accurate measurement of solids accumulation). If tanks have not been pumped out within the last three years, they should be pumped out now. DRAINFIELD CONDITION (11.14): Dq- field inspection indicates: T/ Drainfield i, �; no surfacing evident. 7 2 Some evidence of surfacing, not critical yet. 13 Drainfield is saturated and visibly discharging untreated immediately. Repairs must be completed within 90 days. 14 Drainfield extent and condition unknown. effluent to the surface. Contact the City Inspector LIMITING SITE FACTORS (slope,setbacks,etc.): POTENTIAL FOR SYSTEM FAILURE (depends on somis,water table,etc.):f,-��� Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that this report does not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the ads-r-acy of the system under current conditions based on the available information. This report must be kept on the prc.nmses with the system locetmor and pumping records. WHITE COPY Inspectors File YELLOW COPY Homeowner