ON —SITE SEWAGE TREATMENT
INSPECTION REPORT
�II lf ��,/ ,-
Owner: _�(�I?^r:`. -t (,' /!{r'l� Address:
n --
Permit *'s: +�-*� 5f� i Dates: 1.L— Contractors: �-
City ordinance number 100 requires that each on•sile sewage treatment system in Orono be inspected on a regular basis.
The on -site sewage treatment system at the at^.� address s been inspected and appears to fall into the category
checked below.
(This is 0� an existing system l I new construction)
1 "CODE SYSTEMii-A system which meets all 'he i -ation, design, and construction standards of the current City
Codes, and which is operating sati,tactoriiy by treating and disposing of the entire current sewage input
without discharging ary pollutants into ground or surface waters.
2 "CONFORMING SYSTEM" -A system which does not meet all the location, design, and construction standards of the
current City Codes, but was installed according to the code in effect at the time of installation, and which
is operating satisfactorit', by treating and disposing of the entire current sewage input without discharging
any pollutants into ground or surface waters.
r3� "NON -CONFORMING SYSTEM11-A prohibited system; a system located within a designated 100-year floodplain; any
system which may or may not meet all the location, design, and construction standards of the current City
Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand
between the distribution device and the limiting soil characteristics.
(The limiting soil characteristic ( I has or [t has not been identified at this time. If the limiting soil
characteristic has not been identified, this assification may be subject to revision.)
Tank inspection indicates:
5 Purnpout not needed at this time.
6 Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems.
7 Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible.
8 System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge.
9 inspection risers missing -tanks could not be inspected. Inspection risers (4" dia. pipe) must be installed in eact.
tank at next pumpout. If tanks have not been pumped out within the last three years, they should be pumped
out now.
i10 Inspection pipe is located directly over tank baffle (does not give accurate measurement of solids accumulation).
If tanks rhave, not peenipumped out Within the test three y'ear� toy
'Should be put" out now.
DRAINFIELD CONDITION (11.14):
Drainfield inspection indicated::--
11 Drainfield is dry, no surfacing evident.
(1y'Some evidence of surfacing, not critical yet.
Drainf�ejd_Ls-.saturflted and xisibLy discharslir.Q untceated.ell luent..to the surface. Contact the Citv inspector
immedJAtrA4. Repairs must be roirpleted within 90 days. _
14 DrainTleta extent and condition unknown.
LIMITING SITE FACTORS (stope,setbacks,etc.):
POTENTIAL FOR SYSTEM FAILURE (depends on soils water table etc.):
COMMENTS:
ate of Inspection
System Inspector
Note: In the event that this inspection ieport is used to satisfy the requirements for a mortgage or other transfer of
property, be advised that this report does not guarantee or certify that an existing system will continue to function
property, but is merely an opinion of the adequacy of the system under current conditions based on ttie available
information.
This report must be kept on the premises with the system location and pumpi•,g records.
WHITE COPY Inspectors File YELLOW COPY Homeowner