ON —SITE SEWAGE TREATMENT
INSPECTION REPORT
Owner: �/r�S ! �PTr7r�i Address: �Il )'j?,V�/ 1C1�• &I
�w
Permit #'s `
�_� Dates: / �`6 Contracto> y:
City ordinance number 100 requires that each on -site sewage treatment system in Orono be inspected on a regular basis.
The on -site sewage treatment system at the above address has been inspected and appears to fall into the category
checked below.
(This is (i1 an existing system L I new construction)
SYSTEM CONFORMITY (1-3):_
1 "CODE SYSTEM" -A system which meets all the location, design, and construction standards of the current City
Codes, and which is operating satisfactorily b, treating and disposing of the entire current sewage input
without discharging any pollutants into ground L' surface waters.
2 "CONFORMING SYSTEM" -A system which does not meet a I the location, design, and construction standards of the
current City Codes, but was installed according tc the code in effect at the time of installation, and which
is operating satisfactorily by treating and disposing of the entire current sewage input without discharging
^ any pollutants into ground or surface waters.
�3l "NON -CONFORMING SYSTEM" -A prohibited system; a system located within a designated 100-year floodplain; any
system which may or may not meet all the location, design, and construction st -dards of the current City
Codes and which is failing for any reason; and any system with less than 3 feet f unsaturated soil or sand
between the distribution device and the limiting[ soil characteristics.
(The limiting soil characteristic l ) has or tom] has not been identified at this time. If the limiting soil
characteristic has not been identified, this c assification may be subject to revision.)
TANK CONDITION (5-10):
T�qk inspection indicates:
(� Pumpout not needed at this time.
6 Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems.
7 Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible.
8 System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge.
9 Inspection risers missing -tanks could not be inspected. Inspection risers (4" dia. pipe) must be installed in each
tank at next punpout. If tanks have not been pumped out within the last three years, they should be pumped
out now.
10 Inspection pipe is located directly over tank baffle (does not give accurate -measurement of solids accumulation).
If tanks have not been pumped out within the last three years, they should be pumped out now.
DRAINFIELD CONDITION (11-14): 4S
Drainfield inspection indicates:
11 Drainfield is dry, no surfacing evident.
jj.]]�� Some evidence of surfacing, not critical yet.
(1j► Drainfietd is saturo •ttr ated •ffluent to the surface. Co_ntac v—pied r
irrnmediate Tt st be c leted within'.^—allys�,�
14 DrainftY+Y_ ax ent and condition un n w . —
LIMITING SITE FACTORS (slope.setbacks.etc.):
POTENTIAL FOR SYSTEM FAILURE (depends on soils.water t3ble.etc.): }
COMMENTS:
Date of Insper.tion ;8bptic-System Inspector
Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of
property, be advised that this report does not guarantee or certify that an existing system will continue to function
properly, but is merely an opinion of the adequacy of the system under current conditions based on the available
information.
This report must be kept on the prc.nises with the system location mod pumping records.
WHITE COPY Inspectors File YELLOW COPY Homeowner