Laserfiche WebLink
CITY OF ORONO <br />Municipal Offices <br />Post Office Box 66 <br />Crystal Bay, MN 55323-0066 <br />a � <br />\t9kESIAO <br />ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />Owner: 6L4S jKtk1l`— Address: S0 IPAr4/P U /V <br />Permit #'s: ':� Dates: cif/-77 Contractors: A <br />City ordinance number 100 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. <br />The on -site sewage treatment system at the above address has been inspected and appears to fall into the category <br />checked below. <br />(This is 14 an existing system C I new construction) <br />-3): <br />"CODE SYSTEM" -A system which meets all the location, design, and construction standards of the current City <br />Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input <br />without discharging any pollutants into ground or surface waters. <br />"CONFORMING SYSTEM11-A system which does not meet all the location, design, and construction standards of the <br />current City Codes, but was installed according to the code in effect at the time of installation, and which <br />is operating satisfactorily by treating and disposing of the entire current sewage input without discharging <br />any pollutants into ground or surface waters. <br />"WON -CONFORMING SYSTEM" -A prohibited system; a system located within a designated 100-year floodplsin; any <br />system which may or may not meet all the location, design, and construction standards of the current City <br />Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or send <br />between the distribution device and the limiting soil characteristics. <br />(The limiting soil characteristic C 1 has or �b4 has not been identified at this time. If the limiting soil <br />characteristic has not been identified, this classification may be subject to revision.) <br />Tank inspection indicates: <br />5 Pumpout not needed at this time. <br />6 Solids accumulation in tanks indicates they should ie ptmprd out this year to help prevent future problems. <br />7 Solids accumulation in tanks is at a critical level. Yanks should be pumped out as soon as possible. <br />System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge. <br />Inspection risers missing -tanks could not be inspected. Inspection risers (4" dia. pipe) must be installed in each <br />tank at next purpout. if tanks have not been pulped out within the last three years, they should be pulped <br />out now. <br />10 Inspection pipe is located directly over tank baffle (does not give accurate measurement of solids accumulation). <br />If tanks have not been pumped out within the last three years, they should be pumped out now. <br />DRAINFIELD CONDITION (11-14): ZE <br />Dynfield inspection indicates: <br />1 Drainfield is dry, no surfacing evident. <br />42 Some evidence of surfacing, not critical yet. <br />13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />14 Drainfield extent dnd condition unknown. <br />POTENTIAL FOR SYSTEM FAILURE (depends on soi(s.water table etc.):+» <br />r <br />e <br />Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of <br />property, be advised that this report does not guarantee or certify that an existing system will continue to function <br />properly, but is merely an opinion of the adequacy of the system under current conditions based on the available <br />information. <br />This report must be kept on the premises with the system location and pumping records. <br />WHITE COPY Inspectors File YELLOW COPY Horneowrwr <br />