Laserfiche WebLink
SYSTEM DESIGN FOR LEO HAUSER <br />OF LOT 3, BLOCK 1, HAUSER LAUER WCC :;DJITION <br />ORONO, MINNESOTA <br />11-30-89 <br />Information follows for the installation of a pressure mound <br />system for the proposed house on the above property. Also, <br />two septic tanks of at least 1000 gallons will be needed <br />along with a pumping tank of at least 750 gallons. <br />All construction and materials must adhere to the provisions <br />of the City of Orono. All construction and grading must be <br />kept off both the primary and the alternate septic site <br />areas. Runoff water should be diverted from the mound area. <br />If any other information is needed, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />Marx Gronberg, <br />PCA certified <br />