HomeMy WebLinkAbout780 Long Bridge Lane - Point Of Sale Inspection - CompliantCERTIFIED
W W� EXPIRES: l ao�a03'5�
City Of Orono
Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form
Date
Called in
:/
zd26S
Date
Scheduled
9- zZ -ZOZS`
Property Address:
'7�p
Z�„
/Iie &W GgnL
PID:
C l(
a
DOb
Owner; Information
Name:
, a �oq
Mailing Address:
(if different from
Property)
-�*o L63 �,;c/� Lljnc
Go.,,r GtiK. ,N- 55356
Phone:
61Z - Zo✓ • 74 7
Email:
Me „dd Pm e jr e
Ins eetor Information
Name:
Geer/i n s
Company/ Organization
/lo„ �- Ste- /?A
License number:
PC 779
Phone* /L- 72y-$?:S,'
Email:ot�'r« a?M141ei..«
As/• lv�
Ins ection
System
Standard
Pass
Fail
Roof Drains
Roof drains and leaders hoof drains should not be connected to the sanitary
sewer but should discharge to the ground outside ofa building, If the root'
A\��
drains are connected to the sanitary sewer, disconnect them. plug any open
�I�V}
connections to the sanitary sewer using a nun -shrink permanent material, and
nl�a
rcdfrccl the roof drains onto the round outside the building,
1 I 1
Foundation
Foundation drains are underground pipes that collect storm water from
Drains
around the base of a building and into a sump basket, where it is then
C
(y
pumped outside of the building. foundation drains should not be connected
to the sanitary sewer.
Sump Pumps
Sump PUMPS are designed to capture surface or ground water that enters
\
basements or crawl spaces and pump it away from the house. The basic sump
�1 p�
�Q(�
1>`
system includes drain tile, a sump pit. a sump pump, a float or switch, and a
drain line. Sum pumps should not he connected to the sanitary sewer.
I I15
Sewer Service
Sanitary Sewer Inflow & Infiltration (111) Compliance Inspection Sanitary
Line
Sewcr Lines. All sanitary sewer lines serving Properly. from the house to the
main line. shall be in a safe and litnctional condition and shall he free Isom till
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
specifications. (Details on back of this sheet)
Notes:
Toilet Removed
o Yes o
For ins ection:
Ci Review
ri
Com liant
❑ Corrective Action Re uired
Certificate of Compliance Ex ires: ►v pad ;
Corrective Action Due by:
Date:
D 0 0) 2
Signature: /
Name: u l
F3
2
z
c
Service Line Inspection Details
Weather Conditions:
Approximate Depth of Service
Type and Size of Service
Overall Condition of Service Pie
'��c� Co„dr fi►�h
Please note all connections, fittings, points of concern on service line including infilt►•ation, tree root,
cracks, misaligned joints, etc.
This report must include a digital copy of the televising.
Feet Comment
Example:
0 Start for 4" cleanout in NE corner of Basement
1=10 Misaligned joint —Infiltration
j 9/?s
PVG a6r� la
s tcvt! /ors' � �• � S �/I'ac- _ /'ia� r7c1 Scc aKY
/SSriaj pr• L'oti«rnS.
i
i
}
Private Property Inflow And Infiltration Inspection Procedures
For Contractors
Sewer Service Further Investigation Issues
Properties found in need of further investigation have one or more of the following.
• unable to access sewer lateral due to un-located cleanouts (behind walls, under flooring, etc)
• unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc
• unknown connections (unable to verify connection flowing water into sewer lateral)
.And Process
• Inflow/Infiltration Compliance Inspection form •Correctly plumbed sump pump discharges
must have the "Sump Pumps" and "Foundation outside of the building using rigid pipe. Pipe
Drains" sections completely filled out for the discharge should be a minimum of 10-feet from
inspection to be complete, building.
• Every sump pump on the property is required to • Sump pumps that do not discharge outside
be inspected (including photos of the opened are incorrectly plumbed and are considered
basket, the surrounding area, and the discharge non -compliant.
pipe, both interior and exterior). Total number of Roof leaders are required to discharge outside
sump pumps must be noted. of the building; any roof leaders and or cisterns
• Sump pump discharge piping is required to be discharging into foundation drains are non-
rigid pipe. Flexible pipe, shut-off valves, compliant.
vlumbinR tees, and w es are not allowed.
Completed Inspection
• Property owner is to sign the completed • The City will issue either a Certificate of
Inflow/Infiltration Compliance Inspection form and Compliance or a Correction Notice once the
retain a copy for their records, review is complete. If a correction notice is
• A copy of the completed Inflow/Infiltration issued, the required repairs must be made and a
Compliance Inspection form and video link is post -repair televised inspection must be
required to be delivered to the City of Orono for performed in order to receive Certificate of
review. Compliance.
• The City's Utilities Supervisor or his/her • The completed forms will be mailed to the
designee will review the video and compare it with address on the Inflow/Infiltration Compliance
the completed Inflow/Infiltration Compliance Inspection form, unless a different address is
Inspection form noted.
Contractor's
Contractor completing the Inflow and Infiltration Compliance Inspection has read and
understands the conditions of the Private Property Inflow and Infiltration inspection Procedures
for Contractors.
Company /name Inspector name
�Oh fi7c4 SYkXi iL{f. .��-� U
Copy of plumbers license
On file (or) Attached
License number Bond Date
Staff Use Only
Date Received Staff Name and Signature
I%Olaoa-
5�- 11
A
Page 2 of 2
s
s
Y
s
s
Private Property Inflow And Infiltration Inspection Procedures
For Contractors
The following instructions and standards are intended for property owners and their contractors when
choosing to use a private contractor to complete the Point of Sale Sanitary Sewer Service Inflow and
Infiltration (1/1) Inspection. Private inspection contractors will need to complete the inspection using
the City of Orono's Inflow/Infiltration Inspection Form, available on the City website. Inspectors will
require access to the basement or lowest level in the home or building and access to all sewer
cleanouts, sump pump(s), and sump pump plumbing. The televised portion of the I/1 inspection is to
note defects in the sanitary sewer lateral, which result in infiltration and ex -filtration. The purpose of
the private property inflow and infiltration (I/I) inspection is to reduce the flow of clear water into the
sanitary sewer system via cross connections (inflow) from sump pumps, foundation drains, roof
leaders, cisterns, and other clean water sources connected to the sanitary sewer system. In addition,
the program aims to reduce indirect flow of clean water into the sanitary sewer system (infiltration)
through pipe and pipe joint defects.
Video Y Picture Standards
• The video report will be in a MPEG format
• Still photos will be in a JPEG format
• Video reports can be submitted on thumb drives or a USB hard drive.
• Reference the start and end of each video segment as it begins.
• Footages along the sewer service line must be shown on the video report.
• The video camera shall be guided forward at a moderate to slow pace along the bottom of the pipe.
• The camera shall stop at any connection.
• The camera shall stop at any unusual instances that are viewed while in progress and provide a more
ietailed and longer view of the specific instance (i.e. — bad joint, dirt in lines, settlement in line, etc.).
Sewer Service Inspection Criteria And Process
• in Compliance Inspection form
must be completely tilled out for the inspection to
be complete.
• The inspector is required to note all defects and
footage location in the sanitary sewer lateral on
the compliance inspection form and an audio
description recorded on USB Thumb drive or hard
drive.
• The sewer service inspection inust the service
Ape from before it exits the building to the sewer
main.
• All connections must be verified by flowing
water into drains, referencing the source, and
reporting them on the video
• Any connection that cannot be verified is
considered to be an unknown connection and
must be exposed to verify source.
• All cleanouts are required to be opened and
inspected (include photos of the opened cleanout
riser); cleanout inspection requires documented
footage location on the form and audio
description recorded on USB Thumb drive or hard
drive.
• All floor drains will need to be opened and
inspected (include photos of the drain, the
surrounding area, and the nearest foundation
wall).
• Any foundation drains found will need to be
opened and the discharge point verified (include
ph)tos).
• All external drains will need to be opened and
the discharge point verified
• Defects/items that require documentation
include, but are not limited to:
Y roots
Y offset pipe joints
Y mineral deposits
unknown deposits
or Sag/pipe deflection
i- cracked pipes
'r chipped pipes
Pipe size transitions
length of service
location of all cleanouts
broken / damaged or missing pipe
foundation drain connections (including
photos).
Page 1 of 2
i
E