My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-2020 Permanent Easement Agreement-signed
Orono
>
Property Files
>
Street Address
>
S
>
Smith Avenue
>
040 Smith Avenue - 02-117-23-21-0002
>
Survey
>
05-11-2020 Permanent Easement Agreement-signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 10:12:45 AM
Creation date
1/7/2026 8:34:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reservedfor recording <br />PERMANENT EASEMENT AGREEMENT <br />h <br />This agreement ("Agreement") is made this 1 1 day of May, 2020, by and between <br />THEODORE BONNETT and ALLISON BONNETT, spouses married to each other <br />Grantors") and CITY OF ORONO, a Minnesota municipal corporation ("City") collectively <br />the "Parties". <br />AGREEMENT <br />Grantors, in consideration of One Dollar ($1.00) and other good and valuable <br />consideration,the receipt and sufficiency of which is hereby acknowledged, do hereby grant unto <br />the City, its successors and assigns, forever, a permanent easement for right of way purposes over, <br />across, on, under, and through land situated within the County of Hennepin, State of Minnesota, <br />as legally described on the attached Exhibit "A" and depicted on the attached Exhibit"B". <br />INCLUDING the rights of the City, its contractors, agents, servants, and assigns, to enter <br />upon the easement premises at all reasonable times to construct, reconstruct, inspect, repair, and <br />maintain said right of way over, across, on, under, and through the easement premises, together <br />with the right to grade, level, fill, drain and excavate the easement premises, and the further right <br />to remove trees, bushes, undergrowth, and other obstructions interfering with the location, <br />construction, and maintenance of said right of way easement. The City shall perform and be <br />responsible for the costs of all construction, reconstruction, inspection, repairs and maintenance, <br />including resurfacing, cleaning,clearing,and snow and ice removal. The City agrees not to assess <br />the Grantors or the owners of any property adjacent to the easement premises for any costs <br />Page 1 <br />209049v2
The URL can be used to link to this page
Your browser does not support the video tag.