HomeMy WebLinkAbout3685 North Shore Drive - Point Of Sale Repair Quote - Sewer Repair Quote 01 / 02 / 2026
Marvel Sewer and Drain
7703 Central Ave Ne Unit C
Spring Lake Park, MN 55432
Help@marvelseweranddrain.com | (763)445-9005
Proposal is for:
Siri Olsen
3685 North Shore Drive
Orono, MN 55391
siri@drewhueler.com 651-263-4417
Thank you for giving us the opportunity to provide a Cure in
Place Pipe (CIPP) sewer repair, also known as a Sewer Liner,
Liner or Sleeve. This repair comes with a 10 year Contractor
warranty covering any natural backups or intrusions of the line,
as well as a 50 year Manufacturers warranty . These
warranties do not apply to areas of pipe holding standing
water. You will get many years of worry-free use of your sewer
as this repair both structurally reinforces the line and prevents
any root intrusion within the repair. Watch the video to better
understand how our CIPP process works.
Scope of Work
We will descale approx 45' feet of the cast iron pipe from the
stack access point. This process will restore the pipe to its
original shape and diameter as much as possible, enhancing
water flow and minimizing the risk of future blockages in the
sewer line.
We will perform Hydro-Jetting from the stack access to
thoroughly clear the line of water and debris prior to the C.I.P.P.
installation. This step is critical to ensure proper adhesion of
the repair to the existing line and is necessary for a successful
and reliable installation.
We will install two Cured-In-Place Pipe (C.I.P.P.) repairs from
the home foundation to the outside clean out at approx 46' and
from the outside clean out to within one foot of the final joint
before the city main. This C.I.P.P. repair will structurally
reinforce the line and prevent future root intrusion.
*Upon signing, this proposal is based on the information
provided to us; therefore, it is contingent on our own site visit
to verify the details of the project.
Service Price
Orono permit
Cost to repair sewers in Orono
$53.03
Hydro-Jetting
Attempt to Hydro-Jet from proper cleanouts using 8GPM @ 4,000PSI jetter to clear
line.
Pricing of $950 includes 2 hours of labor. Additional time/labor, if needed, to be
charged at $300/hour
$950.00
Sewer Lateral Descaling 40-49'
Mechanical descaling of 4"-6" sewer line to remove hard deposits and buildup inside
the pipe, improving function and longevity. Includes a final flush to ensure all
removed scale and sediment are cleared from the line.
$2,175.00
CIPP Repair 90'-99'
Install between 90'-99' of Cured In Place Pipe, landing within one foot of the last
joint to the city connection unless otherwise specified.
$9,814.00
Total $12,992.03
What we need from you
Here are some details you need to know for the day of install.
• No indoor water may be used and prior arrangements should be made for toilet use.
• Being aware of parking and walking paths. Keeping driveways and walkways clear of
snow and ice.
• An authorized Point-Of-Contact either on site, or by phone and available throughout day
of installation.
• No minors under the age of 18 are permitted to be left unattended at the property.
• Have water from a hose bib, electricity made available for our use.
• We need full access of the home as we may need to enter different parts of the home to
get to other drains, water lines and breaker boxes.
• Pets: We go in and out of your home frequently during this process and may need to
leave doors and/or windows open. You know your pet, keep them safe and out of the
work zone.
• We need sufficient cleared space to work. The path to our work area, and a 10ftx10ft
area around the Installation Point, is to be cleared of storage and household items.
• The epoxy we work with is time sensitive and we have to install it quickly, other
contractors and individuals will have to yield to us.
Scope of Work Amendments
We provide the most accurate estimates we can, but at times an unknown may arise. The
following is an outline of some possible, although unlikely, amendments that may occur.
Changes in the scope of work are to be communicated and approved by Siri Olsen.
POSSIBLE AMENDMENTS
• Sewer Health - Health of the line has deteriorated, of greatly differs, from inspection
video. Cost $TBD
• CANCELLATION - If client is to Cancel or Change Dates within 24 hours of installation
date a $2,000 amendment is added for a lost day. Changes beyond 24 hours result in no
fee.
• Groundwater - Heavy rainfall may cause water infiltration of your sewer line previously
unbeknownst. In mild cases, this will result in the addition of a "pre-liner" charged at
$6/foot if viable access is available. In severe cases, this will result in a rescheduling of
the repair to a future date.
• Delay in Work - Labor charged at $500/hour for delays up to 2 hours.
• Mobilization Fee of $2,000/day for full day loss.
• Installation point access not available per scope of work
• Conditions of "What we need from you" not met (see above)
I, Siri Olsen, acknowledge and understand the "What we need from you" portion as well as the
possible "Scope of Work Amendments" above.
Approval:___________
What to expect from us
• Scheduling- We are at the mercy of mother nature. Extreme cold (sub 10°) and
inclement weather may delay our scheduling. We will do our best in being proactive
in these instances and there is no fee for these reschedules.
• We will use floor covers to protect your floors.
• If there is carpet in the work area it may get wet. This is clean water we use for the install.
We will do our best to dry it.
• If there is carpet around the cleanout it may get stained from epoxy.
• We will have doors and windows left open for hoses and fresh air.
• Painted floors are tricky for us. Typically they do not hold up to heavy use from our
equipment and constant back and forth. We do our best to be kind to them. Marvel Sewer
and Drain will not be held liable for painted floors.
• A standard install takes between 5-10 hours. We land the liner within 1-2' of destination
(depending on sewer length).
• Cure in Place Pipe (CIPP) repair is not a resolution to bellied portions of sewer line. Any
currently bellied sections will still exist within the line.
Payment
Payment is due upon completion of the project unless specifically noted below. We
accept Cash, Check or Credit Card. Financing options through our partner GreenSky are
available upon request.
If using a City Program for payment assistance enrollment will be verified by Marvel prior to
booking.
Method of Payment:
***FINANCING AVAILABLE**
Please follow this link for an overview of our plan offerings through Greensky Financial
https://marvelseweranddrain.com/financing/
Proposal Acceptance
**IMPORTANT** By signing below, Client agrees to the terms and conditions that apply to the
services selected. Further, Client signifies that they have the authority to order the work to be
performed at the property listed, and authorizes that Contractor may begin the work.
___________________________
Siri Olsen
___________________
Date
Attachments Comprising the Contract:
Terms and Conditions of Contract
Proposal#Proposal Number 5791
Other Documents(Specify):
Proposal is good for 30 days, don't miss out!
Sewer CIPP Installation Terms & Conditions
1. Marvel Sewer and Drain, LLC (hereafter “Contractor”) shall furnish all of the materials and perform all of the work as agreed to in the
attached Proposal as it pertains to work to be performed on the property listed above. If the Proposal provided is not accepted by the client
within 30 days of receipt it can be withdrawn by Contractor.
2. Pricing & Changes: Costs associated with this project will be as provided in the attached Proposal. Changes to the scope of work may
result in additional charges. Alteration or deviation from the Proposal involving costs greater than one thousand dollars ($1,000.00) of the
total Proposal amount requires written approval from the Client. Any unwritten changes made to the scope of work will be billed at rates
consistent with the accepted Proposal.
3. Client Responsibilities: Client is responsible for complying with and notifying Contractor of all covenants and/or restrictions applicable to
the property along with obtaining any necessary prior approval from private entities including but not limited to: homeowner’s associations,
management companies, etc. Contractor is not responsible for surveying the property or determining boundary lines, easements, or
encroachments located on the property. All aforementioned items in this clause are the responsibility of the Client. Contractor is not
responsible for any damages resulting from Client’s failure to uphold its responsibilities under this paragraph.
4. Client Pre-Work Responsibilities: Client must make water, electricity, and driveway available for Contractors use during the entire project.
Contractor may need access to any room in the home, depending on the locations of water lines, drains, and electrical panels. Client grants
Contractor full access to the property during the work. Client agrees to restrain pets, or otherwise keep them out of Contractor’s way. No
water may be used inside the property during the work and Client will make arrangements to use bathroom facilities elsewhere. Due to the
time sensitive nature of the epoxy used, Contractor’s work must take priority over all other work, projects, and people at the property.
5. Warnings: Carpet around the Contractor’s work area may get wet. Carpet near the cleanout area may be stained from epoxy. Painted
floors may be damaged and while Contractor will take care to prevent damage, Contractor does not warrant or repair any damage done to
painted floors.
6. Property Owner: Contractor understands and relies upon Client’s representations that Client is the lawful owner of the property upon
which work is being completed or has legal authority to authorize the work on the property. Contractor is not liable for damages, actions, or
losses brought or incurred by the Client as a result of work performed by Contractor on property not owned by the Client, or for which the
Client did not have legal authority to authorize such work. Nothing in this paragraph will absolve the Client of his/her obligation to
Contractor to pay for all work performed by Contractor at the request of the Client.
7. Insurance: Contractor will carry workers compensation for all employees performing work under this Agreement. Contractor will carry
Commercial General Liability Insurance and Commercial vehicle insurance at all times this Agreement is in effect. Insurance Certificates
available upon request.
8. Unforeseen Conditions: Unforeseen sewer line and underground conditions may cause additional work which may result in additional
costs and charges in order to complete the project. If such conditions are discovered, Contractor will immediately discuss these conditions
with the Client. Delays due to inclement weather or Acts of God, shall not be a basis for termination of this Agreement or a reduction in the
amount owed by the Client.
9. Timing: The project start date will be agreed upon by the parties following the acceptance of the Proposal. Installation will be done as
swiftly as possible; though weather conditions, sewer line conditions and other factors may lengthen the installation process or postpone the
estimated project start or completion date. Due to such factors, no starting or completion dates are expressly or impliedly guaranteed.
10. Terms of Payments: Full payment including additional costs due to changes is due upon substantial completion of the project. Invoices
provided to the Client are due upon receipt and payment will be considered late if payment is not received within 30 days of the date of the
invoice. Late payments will result in interest being charged to the account at a rate of 1.5% per month, or the maximum allowable by law,
whichever is greater. Client agrees to pay any collections costs incurred by Contractor in pursuing any outstanding balance, including but
not limited to reasonable attorney’s fees, costs, and court costs. If Client will be utilizing private financing, or municipally backed grant or
payment programs, Client must notify Contractor in writing at least 48 hours in advance of project start. Client acknowledges that they are
responsible for full payment for the work, regardless of qualification or actual payment received from private financing or municipal
programs.
11. Subcontractors: Contractor reserves the right to hire qualified subcontractors to perform some or all of the services to be performed
under this Agreement. Contractor will attempt to notify Client in advance of Subcontractors performing any work on the Client’s property
however subcontractors work independently of Contractor and advance notice may not always be possible.
12. Warranties are as shown in any attached warranty information sheet Absent any attached information, no warranty or guaranties are
provided or implied. Please contact Contractor for additional information or with questions.
13. PRE-LIEN NOTICE: THIS NOTICE IS TO ADVISE YOU OF YOUR RIGHTS UNDER MINNESOTA LAW (MINN. STAT. §514.011) IN
CONNECTION WITH THE IMPROVEMENT TO YOUR PROPERTY.
(A) ANY PERSON OR COMPANY SUPPLYING LABOR OR MATERIALS FOR THIS IMPROVEMENT TO YOUR PROPERTY MAY FILE
A LIEN AGAINST YOUR PROPERTY IF THAT PERSON OR COMPANY IS NOT PAID FOR THE CONTRIBUTIONS.
(B) UNDER MINNESOTA LAW, YOU HAVE THE RIGHT TO PAY PERSONS WHO SUPPLIED LABOR OR MATERIALS FOR THIS
IMPROVEMENT DIRECTLY AND DEDUCT THIS AMOUNT FROM OUR CONTRACT PRICE, OR WITHHOLD THE AMOUNTS DUE
THEM FROM US UNTIL 120 DAYS AFTER COMPLETION OF THE IMPROVEMENT UNLESS WE GIVE YOU A LIEN WAIVER SIGNED
BY PERSONS WHO SUPPLIED ANY LABOR OR MATERIAL FOR THE IMPROVEMENT AND WHO GAVE YOU TIMELY NOTICE.
14. Choice of Law: This agreement will be governed by the laws of Minnesota. The parties agree to make a good faith effort to resolve any
disputes which arise from this agreement through direct contact, in an informal manner. Should informal efforts be unsuccessful, the parties
may use any legal remedies available to them under Minnesota or federal law. Any disputes shall be submitted to the exclusive jurisdiction
of the state and federal courts in Hennepin County, Minnesota.
15. Cancellation: Client must notify Contractor within three days prior to the project start date of intent to cancel this agreement. Failure
to give proper cancellation notice will result in a charge $500.00, plus any costs incurred in preparation for, execution and installation of the
project.
16. Merger: These terms and conditions and any attachments indicated above constitute the entire agreement between the parties, all prior
negotiations and commitments being merged herein.