Loading...
HomeMy WebLinkAbout1977-05-19 Septic System Design ReportAn Expansion of Soil Engineering Services, Inc. I7INNEAPOLIS/=T. PAUL 6800 S. County Rd.18, P.D. Boll 35108, Mpls., Mn. 55435 / 612-941.5600 NORTHERN MINNESOTA 3219 E.19th Avenue, Hibbing, Mn. 55746 / 218.263.9869 May 19, 1977 Nitz, Inc. 1989 Fagerness Point Road Wayzata, Minnesota 55391 Gentlemen: 0mon" ENGINEERING TE311NG 1. S. aRAUN P, E.. PrwWnr P. H. ANGERSON, Vier Pars. Opwsriwr C.G. KRUSE V E. V" Prat Enpr ,,V Re: 77-159 SOIL BORING $ PERCOLATION TESTS Lot 3, Block 1 Farview Addition Trono, Minnesota As requested, we have recently conducted a soils investi- gation consisting of one power auger boring and 8 perco< lation tests taken to determine the general soil and water conditions, as well as to provide information relative to the soil absorptivity rates. The boring and percolation tests were taken at the locations shown on the attached sketch. Field locations were determined by our crew as referenced to the house location. Surface elevations were referenced to a spike in the south end of an 8-inch ash, located on the northeast side of the proposed house. The elevation at this pc_nt was assumed equal to 100.0 feet. Initially, six percolation tests were conducted on the lot on May 4, 1977. As some of the tests indicated failing results, two additional percolation tests were conducted on May 17, as you requested. INVESTIGATION METHODS: The power auger boring was completed using a truck -mounted power auger unit. The soil classifiations and depths shown on the attached log were inferred from the soils brought to the surface by the continuous flight feature of the auger. The depths of strata changes are, thus, considered approximate, CONSULTING ENGINEERS/SOILS AND MATERIALS Test Borings • Foundation Engineering and Recommendations • Inspecuan of Construction • Material Testing of Soils. Concrete and Building Components 77-159 Nitz, Inc. -2- May 19, 1977 Mineral soils encountered in the boring were classified in accordance with the Unified Classification System (ASTM D2487). A copy of that chart is attached. Representative samples were then returned to our laboratory for verifica- tion of the field classifications by a Soils Engineer. Representative samples will remain in this office for a period of 60 days to be available for your examination. The boring was probed immediately after its completion to check for the presence of groundwater. The boring was also rechecked prior to leaving the site. The absence of ground- water was noted in both probings of the borings to its 20 foot termination depth. The percolation tests were run in 6-inch diameter holes drilled to an approximate depth of 36 inches, in accordance with the procedures recommended by the Minnesota Department of Health (MHD) and with the procedures recommended by the City of Orono. In accordance with these procedures, the bottom and sides of the holes were scratched with a knife blade to remove any smeared soil surfaces and to provide a natural soil interface into which the water may percolate, Two inches of coarse sand was then placed in the bottom of the holes to prevent scouring. The holes were then carefully filled with clear water to a minimum depth o: 12 inches over the top of the sand layer and allowed to soak overnight with the percolation tests being conducted the following day. RESULTS: The log of soils encountered in the boring and the water level observations are shown on the attachec Log of Boring sheet. The soil boring and percolation tests generally encountered sandy clay glacial till from the surface to the 10-foot depth with the top 1 foot being considered the topsoil layer. Immediately underlying the glacial till, a fine to medium -grained glacial outwash sand was encountered to the 20-foot termination depth of the boring. Results of the six initial percolation tests indicating the soil absorptivities in minutes per inch (mpi) are as follows: HRAun" ENGINEERING TESTING 77-159 Nitz, Inc. -3- May 19, 1977 Surface Soil At Rate Test # Elevation Test Depth m i P-1 95.0 Sandy Clay (CL) 120 P-2 92.8 Sandy Clay (CL) 48 P-3 93.5 Sandy Clay (CL) 120 P-4 90.0 Sandy Clay (CL) 120 P-5 87.3 Sandy Cldy (CL) 35 P-6 86.0 Sandy Clay (CL) 34 The average of these 6 initial percolation tests are then 80 mpi. As indicated to you in a telephone conversation, percolation tests P-2, P-5 and P-6 met the percolation requirements while tests P-1, P-3 and P-4 indicated values outside the limits for a typical individual sanitary sewer system. At that time, in our opinion, it appeared likely that a suitable drainfield site can be located in the lower area somewhat to the south of the present proposed location as indicated by tests P-5 and P-6 and on the boring where suitable granular soils were encountered at or near elevation 83±. At your request, on May 17 two additional percolation tests (P-7 and P-8) were performed, approximately 30 feet further south than the location of P-5 and P-6 and both were conducted at or near elevation 81± per the assumed datum. Readings were taken on these two additional percolation tests on May 18 with the following results: Soil At Soil At Rate Test !# Test Depth Test Depth m i P-7 81± Slightly Silty Sand (SP-SM) 10 P-8 81± Slightly Silty Sand (SP-SM) 10 REMARKS: In our opinion, a suitable drainfield can be situated imme- diately to the south of the proposed location with the start of the drainfield at or near the location of percolation tests P-5 and P-6 and running parallel to the downslope contours to the southeast of the proposed house location. Of necessity, the area of the power auger boring and perco- lation tests in relation to the area of the proposed drain - field and the depth of the boring are limited. Suggestions and/or recommendations of this report are opinions based on the data obtained from the boring and the tests. BRAun' ENGINEERING TESTING 77-159 Nitz, Inc. -4- May 19, 1977 If we can be of further assistance in evaluating these data, or in developing a sanitary system layout for the lot, kindly contact us at your convenience. Very truly yours, gUN:LENGINEERI TESTING, INC. Dennis Rietschel e-%%,. Engir rWg Assistant !Braun, P.E. sident DMR/JSB:skf ' The content of this report an , --rpporting document., are for the exclusive use of the addressee in the absence of our prior written approval we make no rep resents Uon ..*.-' assume no responsibm'y to any other parties regarding such content BRAUH" ENGINEERING TESTING .ml v a ` 0 o dd� oro , 0 ti y di i e Xsl� li� 2INQ LOG OF BORINGS 1*6 II II II II 11 PROJECT: 77-159 Soil Boring b Percolation Test DATE: 5/4/77 Lot 3, Blocc 1 SCALE: 1"-4' Fairview Addition Orono Minnesota BORING: B-1 LOCATION: BORING: LOCATION: See Attached Sketch. R .E EV• SURF. EL EV: 93. 3 Depth Description o Ma erials 2487 WL De t Des cr phon o term!; ! 7 WL SANDY CLAY, dbrown, 1 moist To soi CL SANDY CLAY, with fine to medium Gravel, brown, CL moist. (Glacial Till) 10 SAND, fine to medium - grained, with fine to medium Gravel, brown, SP moist. I (Glacial Outwash) , 20 Water level not encountered when probing boring immediately after with- drawal of auger. An Expansion of Soil Engineering Services, Inc ANNEAPOIIS/ST. PAUL 6600 S. County Rd.16, P.O. Boa 35100, Mpis., Mn. 5$435 / 612.941.5600 ORTHERN MINNESOTA 3210 E. 19th Avenue, Hibbing. Mn. 55746 / 216-263.6669 june 9, 1977 Nitz, Inc. 1989 Faegerness °oint Road Wayzata, Minne d 55391 G._ntlemen: Hmult ENGINEERING TESTING s aeapwr t. Arar.a►nr r w .wotltsow. V,n c G U. I. E Vi Ara E,rrrr ,m Re: 77-159 $ 77- .99 Proposed Drainfield System Lot 3, Block 1 $ Lot 4, Block Farview Addition Orono, Minnesota As requested, please ad copies of the proposed drainfield systems for the above mentioned lots. The systems were set up based on the results of the recent percolation tests and in accordance with the "Code of Minimum Standards" as set forth for individual sewage disposal systems for the Village of Orono. The Village of Orono recommends •t each single family residence shall be equipped wit.. o septic tanks, the first of which shall not be less than 750 gallon capacity and the second tank not less than 500 gal�on capacity. If garbage disposal units are used, the first tank shall be of 1000 gallon capacity. The location of the disposal drainfield shall be in an unobstructed and preferably unshaded area and shall be placed no less than 10 feet from.occupied buildings. property lines, or buried p-pe, distributing water under pressure and 75 feet from any water supply well or buried water suction pipe. Disposal trenches shall have a depth of 24 inches and not j exceed 36 inches. Trench width shall be 30 inches and with 7 feet center to center minimum spading of lines. Lot 3, Block 1: The disposal system designed for Lot 3, Block ylerTs residence) was set up based on the results of percolation tests P-5 through 1'-8, which indicated an average of 22 minutes per inch (mpi). For this system, a total of 220 li:.-al feet of absorptive trench per bedroom is then necessary. Based on a 3-bedroom home, a total of 660 lineal feet of absorptive trench was then utilized in the 7 design of the system. In order to n.eet the minimum require- ments, the design system consists of 5 trenches, S5 feet in CONSULTING ENGINEERS/SOILS AND MAIERIALS Test Elonngs • Foundation Engmeennq and Recommer—axons a Inspection o; Construction • Material Testing of Smis. Concrete and Building I ompenents 77-159 & 77-199 Nitz, Inc. -2- June 9, 1977 length and located on the southeast side of the proposed house with the trenches running, parallel to the downslope contours, as shown on the att.,.bed sketch. The optional location per the sketch was ,.nc -ded doe to its possible easier accessibility. Lot 4, Block 2: The system designed for Lot 4, Block 2 (McCrath residence) was based on the results of percolation tests P-5 through P-8, which indicated an average of 42 mpi. For this system, a total of 290 lineal `-et of absorptive trench per bed -Dom would be required, efore, the drainfield system consisting of '70 lineal feet of .)sorptive trench was &.Agned 'based o- a 3-bedroom home for this lot. In order to meet this requirement, six absorptive trenches S8 feet in length starting approximately 60 feet southwesterly of the proposed southwest house corner and as shown on the attached s?.r h, appear suitable for this lot. It has beer,:ar pleasure to be of service to you on these projects and if we can be of further assistance in evalu- ating the enclosed data, kindly contact us at your convenience. Very ;rely yours, RALA ENGINEER. G TESTING, INC. �Denn, M. Rietschel ErtginLeriI4 As 'stant • /_ C. G. Krus Vice President - Engineering r'MR/CGK: skf rh, cc itrot of this report And supporting documents air for the enclustve use of the anrne»re In IM absence,-t our poor wr.nen approval we make nu reprrsentahon And assume no it Yphad, to any othm parbrs regarding such conlrnt 9RAU11" ENGINEERING TESTING �P,tOPEQ�r ua' LOT Z, 61-OCA' / F�o�► bMf� � - - '� 5 � --- - - s. All -- o►srr i w�lien b• oea.ns� W _ 8 -p� y 7-45-9 OincV&,rO ,BYl--Rs Lori 6[ocK_� - d -77 �IWS4- ,A"' v1WW Aooi r. mkvv.. "'"": =R