Loading...
HomeMy WebLinkAbout185 Landmark Drive - Building Plans: Residential (196)Additional permits required: Plumbing Mechanical Electrical Sewer Retaining Wall Stamped and approved plans must be on site for the duration of the project and all inspections. Reviewed for Code Compliance Nicole Egan RPS23-000053 6-12-23 To schedule inspections call 952-249-4613 Have permit number and street address ready at time of call. Please plan accordingly. The City will not issue a Temporary Certificate of Occupancy (Temp CO) for new homes during the growing season from May 1st to November 1st. Issuance of a Certificate of Occupancy requires all permits associated with the project to be finaled and an as-built survey approved by the City. If vegetation is not fully established at the time of CO issuance, the erosion control escrow will continue to be held. Retaining walls over 4' require engineering and a separate permit. Lower level OH Door must be framed the same way as the above Garage Portal Detail with 3(14") LVL Stairs must hang off double beam - 2(2x10) Min deck footing size is 14" - 12" sonotube must be belled to 14" This is the lower level braced wall plan only. Foundation info is on later page. Lower Level Braced Wall Plan Hatch mark = braced wall panel All Braced Walls are CS-WSP Hatch mark = braced wall panel All Braced Walls are CS-WSP This is the main level braced wall plan only. Framing info is on later page. This is the upper level braced wall plan only. Framing info is on later page. Hatch mark = braced wall panel All Braced Walls are CS-WSP Footing is 20 x 8 UNO 2 #4 EW 4 #4 EW Unprotected portions of floor shall not exceed 80 Sq Ft. Mechanical Ventilation Required Anchor bolts every 32" and a clip for 680# at each anchor bolt per Table R404.1(1) Storm Room ceiling requires R30 insulation. Mech calc sheets show 300 cfm hood Per MNF&G 505.4 Hoods exhausting in excess of 400cfm must provide heated makeup air at a rate approx equal to exhaust air rate 3 (2x6) Post both sides Mechanical Ventilation Required