Loading...
HomeMy WebLinkAbout1980-11-01 Memo, Site EvaluationADDITIONAL SITE EVALUATION INPORNATION POR DAVID NITZ ON LOT 7, BLOCK 1 PARVIEW 11-1-80 On Ootober 25, 1980 two additional percolation holes were drilled and tested in the area of the proposed drainfield below the house since this area has been disturbed and filled after the last testing on November 10, 1979. These holes were tested at 2.5 feet deep and oonsisted0mostly filled black loam which yielded a percolation rate of 24,0 minutes per inchfor each of the holes. Because this is a fill.area and some of the original area has been dug up for a tennis court, it will be necessary to construct a mound system and also prepare a base and leave room for a mound alternate site should .-ho need ever arise. 2 e area available for drainfield now measures 100 feet long by 30 feet wide. For the_5 bedroom house 625 sq.ft. of rook bed is usually required. However, bo use of the fast percolation rate and rcr: possible lim,•ted use of the 5th bedroom, it would be acceptable to use a bed 50 feet long by 10 feet wide and save the other 0 set for future use rather than making the bed 62.5 feet long r. at this time. Two 1000 gallon tanks will be required for the house. In addition, a pump and separate p=WIng tank or compartment in one of the septic tanks will be needed for pressure distribu- tion to the mound. Additional detailed design information for the mound system follows. If any additional information is nee- ded, please contact me. Sincerely, PERCOR, IN,C/. Mark S. aronberg, P, 0 r loxo M < o tn ZU uro mom Ilk N, A.fi r A Sgo E-3 • E-4 4 INCHES STRAW OR MARSH MAY AND LAYER OF RED ROSIN PAPER GRASS COVER SAND FILL--,, MAXIMUM SLOPE --► 3 TO I SANDY LOAM SOIL PERFORATED LATERAL 6INCHES TOPSOIL P IL ` •/. SLOPE L PLOWED OR CLEAN ROCK DISKED SURFACE 3j4 TO 2'/a INCHES _CROSS SECTION A - A —PIPE FROM PUMPING CHAMBER 01. �.. 6 PERFORATED LATERALS M U .._ BED AREA —*4 , Le •... - - � i 2 � Z 1 ( - 20 1 i ( 20 I NCHMgg INCHES 01 KE 10 FEET !--- —+�+•— MAX. ;• TOTAL WIDTH PLAN VIEW E-6 RECTANGWLAR SEWAGE TREATMENT MOUND DIVERSION CHANNEL FOR SURFACE RUNOFF E�- '.1 A SEWAGE TREATMENT MOUND ON CONTOUR