My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-11-01 Memo, Site Evaluation
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3051 Farview Lane - 04-117-23-33-0009
>
Septic
>
1980-11-01 Memo, Site Evaluation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:25:42 PM
Creation date
12/17/2025 2:22:16 PM
Metadata
Fields
Template:
x Address Old
House Number
3050
Street Name
Fairview
Street Type
Lane
Address
3051 Fairview Lane
PIN
0411723330009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL SITE EVALUATION <br />INPORNATION POR DAVID NITZ <br />ON LOT 7, BLOCK 1 PARVIEW <br />11-1-80 <br />On Ootober 25, 1980 two additional percolation holes were <br />drilled and tested in the area of the proposed drainfield below <br />the house since this area has been disturbed and filled after <br />the last testing on November 10, 1979. These holes were tested <br />at 2.5 feet deep and oonsisted0mostly filled black loam which <br />yielded a percolation rate of 24,0 minutes per inchfor each of <br />the holes. <br />Because this is a fill.area and some of the original area <br />has been dug up for a tennis court, it will be necessary to <br />construct a mound system and also prepare a base and leave room <br />for a mound alternate site should .-ho need ever arise. 2 e area <br />available for drainfield now measures 100 feet long by 30 feet <br />wide. For the_5 bedroom house 625 sq.ft. of rook bed is usually <br />required. However, bo use of the fast percolation rate and rcr: <br />possible lim,•ted use of the 5th bedroom, it would be acceptable <br />to use a bed 50 feet long by 10 feet wide and save the other 0 <br />set for future use rather than making the bed 62.5 feet long r. <br />at this time. <br />Two 1000 gallon tanks will be required for the house. In <br />addition, a pump and separate p=WIng tank or compartment in <br />one of the septic tanks will be needed for pressure distribu- <br />tion to the mound. Additional detailed design information for <br />the mound system follows. If any additional information is nee- <br />ded, please contact me. <br />Sincerely, <br />PERCOR, IN,C/. <br />Mark S. aronberg, P, <br />
The URL can be used to link to this page
Your browser does not support the video tag.