My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-12-01 On Site Sewage Treatment Inspection Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3059 Farview Lane - 04-117-23-33-0008
>
Septic
>
1986-12-01 On Site Sewage Treatment Inspection Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 12:14:47 PM
Creation date
12/17/2025 12:07:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3059
Street Name
Fairview
Street Type
Lane
Address
3059 Fairview Lane
PIN
0411723330008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oil the .\ ortb Sbon. of <br />Lake Niuurrto►►ka <br />ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER ADDRESS _-3 54 CA2VIftzw L ANC__ <br />PERMITNO.-S. ��-- DATES f� �7 Iy - CONTRACTORS i`u----TQNkA Rd(, <br />City Ordinance No. 210 requires that each on -site sewage treatment system in Orono he inspected on a regular basis. The on -site sewage <br />treatment system at the above address has been inspected and appears to tall into the category checked below. <br />(This is MLan existing system ❑ new construction) <br />1 Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to he operating <br />properly. <br />❑ 2 Does not meet all current City standards for new construction 11978 Code) but in most respects appears to be designed• <br />located, and constructed generally in r,ccordpnce with previous codes. System appears to be functioning properly, no major <br />upgrading of the system is required at this time. <br />❑ 3 Does not meet current City standards in many respects relating to design• construction, or location. Apiwars to Iw operating <br />adequately at this time, but has a relatively high potential lot future problems. No major upgrading of system is requited at <br />this time. <br />O4 System may or may not meet current City standards for design• construction Of location, but is failing to properly treat and <br />dispose of the current inpu•, and is endangerinj a water supply, or is a source of pollution to surface or groundwater:. or is <br />creating a safety hazard, or is othe.wise creating a public nuisance. Please contact the City Inslwctot to discuss system repair/ <br />replacement procedures. If dramfield replacement is necessary, and testing will usually be required• and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION 1 171 Checked items may require your action) <br />Tank inspection indicates <br />FlUumpout it needed at this time. <br />❑ Solids ac.....no'-•ion in tanks indicates they should be pump - <br />ad out this yuar to help prevent future problems. <br />❑ Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />❑ System is discharging to surface Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />❑ Inspection risers missing -tanks could not be inspecte-;, <br />Inspection risers 14' dia. pipe) must be installed in each tat r <br />at next pumpout. If tanks have not been pumped out withit. <br />the last three years, they should be pumped out now. <br />SITE CHARACTERISTICS <br />Limiting Site Factors <br />Slope <br />❑ Sod <br />❑ High water table <br />❑-�,Lot size <br />tJi Lake, wetla- . or stream <br />❑ Drainage <br />COMMENTS <br />Date of Inspection <br />❑ Inspection pipe is located directly over tank battle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the last three years, they <br />should be pumped out now <br />Drainlield inspection indicates <br />ALDrainfield is dry, no surfacing evident. <br />❑ Some evidence of surfacing, not critical yet. <br />❑ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace- <br />ment or additions to dr. rfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />n Dra,.ifeld extent and condition unknown. <br />Potential for System Failure <br />Idepends on sod types, water <br />table, and system cc•ndition) <br />.4LLow <br />C' Medium <br />L.� High <br />❑ System is causing visible <br />surfacg discharge <br />ptic System Inspector <br />Site Capabilities for <br />Future Expansion <br />.� Adecil <br />❑ Fair <br />❑ Poor <br />ri Inadequate <br />Note In the -vent that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, tie advised that <br />this report U7es not or certify that an existing system will continue to function protse 'v but is merely an opinion or the adequacy <br />of the system under Curren( innd;tions based on the available intoimdtron. <br />/ i_ a iru• i •Host be kept tin the premises with system IoCation and pUmptnq teCordt <br />pytn 11 ..( )Pr Inspector's F de GOI. D COPY i Homeowner <br />
The URL can be used to link to this page
Your browser does not support the video tag.