Loading...
HomeMy WebLinkAbout1980-08-20 Resident Letter, Timetable for Septic SystemIr 3M FARVIEW LANE LONG LAKE, PHONE (SI t760<41 waaisrtwaD `� •VII DER .*t 1Zi f ref j ,•: l:::.:� August 20, 1980 C17_Y OF CRONO Mr. Michael Gaffron City of Orono PO Box 66 Crystal Bay, Minnesota 55323 Michael: Please pardon the discharge problem from the septic tank which you witnessed last Friday. The tanks have been pumped out several times the past couple months and they were supposes to be pumped last Thursday but for some reason the job didn't get done. The tanks, however, have been completely pumped since then by Elmer Peterson. I thought that you had been made aware of the situation by Doug Keller. But in case there is any misunderstand- ing, let me set the record straight: Westonka Sewer !� is goinq to complete the drainfield in early September 'i`' after several small trees are removed from the drain - field area and transplanted along the driveway. This u10r;1a11N�uwE„ uX , work was scheduled to be completed last spring, however schedul'nq problems, equipment failure, and the weather prevented a timely and early removal of the trees. The tree mover then said it was getting too late to move them and that I should wait until September first. Then there would be less stress on the trees. As soon as r, that is done then the drainfield will be put in. In the meantime, PeterF-)n has been pumping out the septic tanks. Please accept my apologies for not adequately explaining or having this matter explained to you. The overflow lem will not occur again! W DAN:vlc