473-7357
OWNER YJ! n �i I/lQ(t�YICI Y _ ADDRESS 1J7. —
PERMIT NO.'S.�4�0? J DATES - CONTRACTORS L��
City Ordinance No. 210 requires that with on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sewage
trwtment system at the above atidrNrf has been i 'Yted and appears to fall into the category checked below.
(This is A an existing systrm U new construction)
(� 1 Meets or exceeds currew City standards in all respec s relating to design, constructinn, and location. Ap ea•s to be operating
r/ T properly.
2 Does not meet MI current City standards for new construction (1978 Code) but in most respects appears to be design- d,
located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no n'elor
upgrading of the system is required at this time.
Q3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be opei Sting
adegwtep•% at this time, but has a relatively high potential for future problems. No major upgrading of system is required at
this time.
4 System may or may not meet current City standards for design, construction or location, but is failing to properly treat and
dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwater- or is
creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system rvpeirif
rwplacement procedures. If drainfield re "meet is necessary, wit testing will usually be required, and a design and site plan
must be submitted for review. Your contractor must obtain a permit before work is started.
SYSTEM CONDITION 1 ® Chocked itei.•s may require your action)
Tank inspection indicates:
❑ Pumpout not rswuad at this time.
❑ Solids accumulation in tanks indicates they should be pump-
ed out this Vow to help prevent future problems.
❑ Solids accumulation in tanks is of a critical level. Tanks
should be pumped out a soon a possible.
❑ System is discharging to surface. Tanks must be pumped
within 48 hours to eliminate surface discharge.
❑ Inspection risers missing —tanks could not be inspected.
Inspection risers 14" die. pipe) ni,,.t be .nstalled in each tank
at neat pumpout. If tanks how not been pumped out within
the lost three veers, they should be pumped out now.
SITE CHARACTERISTICS
imitinq Site Factors
❑ Slope
I ;;oil
L High -ter table
Li Lot
❑ Lake, v , .and, or stream
COMMENT',
Inspection pipe is located directly over tank baffle. (Does not
give accurate measurement of solids accumulation.) If tanks
hew not been pumped out within the last three Vows, they
should be pumped out now.
Drainfield inspection indicates:
0-Drainfield is dry, no surfacing evident.
❑ Some a ri fence of wrfecing, not critical yet.
❑ Drainfiefd is saturated and visibly discharging untreated
effluent to the surface. This condition may requiri, ren!"-
ment or additions to drainfield. Contact the City Inspector
immediately. Repairs mist be completed within 90 days.
i-J Dra infield extent and condition i- 'mown.
Potential for System Failure
Site Capabilities for
(depends on soil types, water
Future Expansion
table, and system condition)
Adequate
Jr Low
Fair
❑ Medium
❑ Poor
❑ High
❑ Insidemate
❑ System is causing visible
Date of Inspection eptic System Inspector
Note In the event that this inspection report it used to satisfy the requirements for a mortgage or other transfer of property, be advised that
this report does not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the adequacy
of the system under current conditions based on the available information
This report must be kept on the premises with syWm iocahon and pumpmq records
WHITE COPY / Inspector's File GOLD COPY I Homeowner