HomeMy WebLinkAbout1987-04-02 Memo, Site Development ChronologyTo: Street File - 2811 Farview Lane (Nitz-owner) From: Michael P. Gaffror, Asst Planning & Zoning Administrator Date: April 2, 1987 Subject: Chronology 12/18/86 Received 2 copies of house staking survey from Stugar-Roscoe-- Fausch. Staff notes: - House is not within drainage easement; - Proposed driveway entering from County hoad 84 not allowed; - House appears to meet required side/front/z�ar setbacks; - No septic report on file - no building permit application or plans submitted. . . . Survey placed in street file 2811 Farview Lane awaiting further information. 1/12/87 Received from Bruce Knutson Architects, 1 set of house plans (sheets A-1 thru A-4) 1/13/87 Received from Hakanson-Anderson Assoc4ates - site evaluation and sewage treatment system design. 1/15/87 Received from Bruce i'nutson Architects, 2 additioral sets of plans. Received building permit application ',,igned by Nit - dated 1/10/87) and energy calculations. Application accepted as initially complete on 1/15/87. 1/2"/87 Letter to Nitz dated 1/23,187 requesting additional grading and drainage information. Note that during period 1/15/87 to 1/23/87, stafr contacted Hakanson-Anderson, Stugar-Roscoe-Fausch, and Bruce Knutson Architects, all of whom iniicated they had no authority to act in Nitz's absence to discuss site plan. Nitz in Colorado and not available to meet on the sitC. Prior to 2/9/87 MPG phone discussion with Nitz noted: a) septic location concerns; b) site planning concerns; c) driveway location to County road is a problem, as is proposed location of driveway to Farview (undated survey received between 1/15/87 and 2/9/87); d) drainage concerns relating to intent of original subdivision. 2811 Farview Lane April 2, 1987 Page 2 of 4 2/9/87 Met with surveyor on the site per Nitz's direction, I asked for elevations and location of proposed Farview access driveway, elevations and location of septic test holes, culvr:rt and berm, house corners as related to bottom of drainageway. 2/11/87 Received additional survey from Stugar-Roscoe-Fausch with most of requested information (missinq traverse E-W from house to road across basin - not critial item). 2/11/87 Call from Wyman Haherer, 2879 Farview, requesting status of "lot next to him". 2/23/87 Received copy of letter to Nitz from Wyman Haherer dated 2/18/87, requesting compliance with covenants and threating injunction. 2/24/87 Met with City Engineer, Glenn Cook, to review site - he verbally noted that driveway lccation on Farview may be a problem because of fill needed, location of culvert, and setback from County Road 84 and he suggested possibility• of access to County Road 84; also discussed drainage concerns and suggested we require that a storage basin be re4uired north of the culvert at south end of lot to ensure that original intent of the subdivision grading is continued. Prior to 3/5/8 , Phone discussion wi t:h Nitz regarding change in attitude toward access given new information regarding 6riveway location proposed; discussed problens with septic location as related to elevation of drainageway. Nitz to set up meeting wi"i principals (Hennepin County Department of Transr)ortation, site evaluator, etc.). 3/5/87 Meeting on si�.e with Nit-z/Gaffron/Gerhardson/Zetterstrom/Other - Rathbun absen•.:; Hennepi:-, County DOT agreed to access at southeast corner of lot on County Road 84 - paper work to follow. See MPG notes 3/5/87 prior to site meeting. Plans turned over to Jacobs/Oman for plan review, since site planning/zoning review appears to oe reachin.• agreeable :;onclusion. 3/6/87 Met with F.athbun on site - no a) slope on NY. side of lot too steep for mound; b) MPG agree) that proposed si*es per Rathbun prior reports are suitable only if: 1. house moves 15' south; 2. drainageway is redefined/regraded to protect drainfi.eld site, i.e. provide a more channelized flow ay.ound the bases. !'12/87 Letter frLm Tom Jacobs tn Nitz requiring additional information regarding deck joists and decking. 2811 Farview Lane April 4', 1987 Page 3 of 4 3/13/87 Received Hennepin County access permit for County Road 84 access. 3/17/87 Received sketch from Nitz showint, 1'x50'xl6C' pondir,q area above culvert, noting house would be moved 15' south. 3/24/87 Received additional deck design information a-. requested. 3/?.7/87 Call from Farview neighbor (unKnown - - "digging on corner lot" - staff went to the site approximate.: y 12:15 p.m., found excavator from Bollig and Sons, Inc. excavating for basement. MPG told cat operator that he must stop work because he was excavating in violation of Code since the building permit had not been issued. He said he "thought Nitz had the permit already". He called his boss on his truck radio. His boss told him to stop wo k as ordered by the City. Then I proceeded to show the cat operator what the City intended to approve. He was not aware that the house was going to be 15' south of the staked location. He was not aware of the septic location and had piled dirt on about 1/4 of the primary drainfield site already. His excavation for the basement was perhaps 1/3 complete. MP_. posted a stop work order and ordered that the steep banks of the e>.cavation be flattened out for safety purposes, then MPG left the site at 12:30 p.m. l (Oman also present during the above). I then met directly with �< JAM who stated that we should require the excavation to be returned �o original grade, since no permit had been issued. I \e returned to the site at 12:45 p.m. and informed cat operator of the change, that he would have to restore the site to original 4grade because a) no permit had been issued; b) if for some � J reason permit was not issued we would ha-'� no leverage to get it restored; ^) because of the potential ioi an =njunction by the ne' , it might be a long time before the mattter is settled ��d we ccn't allow an open excavation on the site for a long period.o) He then called his boss and stated that "the City is telling him to restore the site because they might never ge} a permit" which was an inL.rrect statement on his part. He was given the go-ahead to restore, at which time he said he would restore as requested, and I left the site. We did not issue a tag to Bollig, but noted to the cat operator that we might issue a tag +.o Nitz. When I got back to the office about 1 �.m., t`-e footing contractor was waiting to get a permit; however, the plan review was not complete, and he also said "well I do- 't have the check with me anyhow". The secretaries informed me chat the footing contractor supposedly had a check for ^V1,200 based on an estimate he had received from the secretaries used on what he said the value was. The actual fee was not yet established as of this time. I toll him (footing man) to get back to uo on Tuesday or so, by whic_. .:ime we expected plan review to be complete, and to expect a penalty fee. 2811 Farview Lane April 2, 19e7 Page 4 of 4 4/1/87 Jacoas completed plan review and delivered plans back to MPG for final zoning letter of condition as noted by MPG.