HomeMy WebLinkAbout1996-08-23 On Site Sewage Treatment Inspection ReportOwner:
CITY of ORONO
Munkipal Offices
Street Address: Mailing Address:
2750 Kelley ParMway P.O. Box 66
Orono. MN 55356 Crystal Bay, MN 55323-0066
Address:2800 Farview Ln.
Permit #'s:7915 Dar_es:5/13/85 Contractors:Westonka Plbg.
(This is N an existing system ( ] new construction)
STEM COMPLIANCE (1-3): 1
1 Code System; Meets or exceeds current City standards in all respects relating to
design, construction, and location. Appears to be operating properly.
2 Compliant System: Does not meet all current City standards for new construction,
but in most respects appears to be designed, located, and constructed in accordance
with previous codes and is functioning properly.
3 Non -Compliant System: System may or may not meet current City standards for design,
construction, or location, but is failing to properly treat and dispose of the
current input; and any system with less than three feet of vertical separation
between the bottom of the drainfield and the saturated soil level.
(The saturated soil level JX] has or [ ) has not been identified at this time. I! 4?Lt,
saturated soil level has not been identified, this classification is subject to r�.rs,ra:s
KCONDITION : 5
Pumpout not needed at this time
6 Solids accumulation in tanks indicates they should be pumped out this year.
7 System is discharging to the surface. Tanks must be pumped out within 48 hcurs.
8 Inspection risers missing -tanks could not be inspected. If tanks have not been
pumped out within three years, they should be pumped out and risers installed now.
9 Inspection pipe is located over tank baffle -can not measure solids accumulation. If
tanks have not been pumped out within three years, they should be pumped out now.
(During the last septic tank Maintenance Pumpout the tanks [ ) were or 8anlks
were not
confirmed to be watertight by the licensed pumping contractor. If the were not
confirmed to be watertight, this classification is subject to revision.)
INFIELD CONDITION 11-14): 11
1 Drainfield is dry, no surfacing evident.
12 Some evidence of surfacing, not critical yet. Repair is not required at this time.
13 Drainfield is saturated and visibly discharging untreated effluent to the surface.
Contact the City Inspector immediately. Repair must be completed within 90 days.
14 Drainfield extent and condition unknown.
POTENTIAL FOR SYSTEM FAILURE: (system age and condition, soils, etc.): low
COMMENTS:
Date of InspecLion Sept'c System InspLuctor
Note: In the event that this inspection report is used to satisfy the requirements for a
transfer of property, this report does not guarantee that an existing system will continue
to function properly, but indicates the operation of the system under current conditions.
Tdepboee (612) 473-7357 • FAX 4734d10