HomeMy WebLinkAbout2726 Caroline Avenue - Building Plans: ResidentialPlease plan accordingly. The City will not
issue a Temporary Certificate of
Occupancy (Temp CO) for new homes
during the growing season from May 1st to
November 1st. Issuance of a Certificate of
Occupancy requires all permits associated
with the project to be finaled and an
as-built survey approved by the City. If
vegetation is not fully established at the
time of CO issuance, the erosion control
escrow will continue to be held.
Reviewed for Code Compliance
Nicole Egan
RPS23-000085
9-5-23
Stamped and approved
plans must be on site for
the duration of the project
and all inspections.
Additional permits required:
Plumbing
Mechanical
Electrical
Sewer
To schedule inspections call:
952-249-4613
Please have the permit number and
street address ready at time of call.
See Engineering
Enclosed space under
stairs shall have walls
and under-stair surface
enclosed with 1/2"
gypsum board Per
MNRC R302.7
Provide fire blocking vertically at ceilings
and floors, and horizontally at intervals
not exceeding 10'.
Unprotected portions of floor shall not
exceed 80 Sq Ft.
Window opening control devices on
windows serving as a required
emergency escape and rescue opening
shall comply with ASTM F2090
See Engineering
800 CFM Hood
Provide fire blocking vertically at ceilings
and floors, and horizontally at intervals
not exceeding 10'.
Screens cannot be replaced with
windows at any time without
engineering and an additional
permit.
Drain to daylight.