Loading...
HomeMy WebLinkAbout2890 Goldenrod Way - Building Plans: Residential (197)MARY + DAVID O'KEEFE RESIDENCE 2890 GOLDENROD WAY, ORONO, MN 55356 SHEET INDEX T1.0 TITLE SHEET A1.1 MAIN LEVEL FLOOR PLAN A2.1 EXTERIOR ELEVATIONS A2.2 EXTERIOR ELEVATIONS A3.1 INTERIOR ELEVATIONS A4.1 BUILDING SECTIONS PROJECT NOTES E1.1 ELECTRICAL PLANS MARY + DAVIDO'KEEFE RESIDENCE2890 GOLDENROD WAY, ORONO, MN 55356REVOLUTION DESIGN + BUILD 18305 MINNETONKA BLVD #200 WAYZATA, MN 55391 952.594.5037 MIN LIC BC631863 ISSUED 03.29.24 FOR BID 06.14.24 FOR CONSTRUCTION 06.18.24 ADDITIONAL DIMENSIONS 06.21.24 UPDATES 2022 REVOLUTION DESIGN + BUILD© T1.0 S1.0 SITE PLAN Reviewed for Code Compliance Nicole Post RPS24-000067 6-28-24 Approved plans must be on site for the duration of the project. Plans must be available to inspector. Please call 952-249-6000 to schedule all inspections. Have permit number and address when calling. Separate Permits Required Plumbing Mechanical Electrical Sewer Please plan accordingly. The City will not issue a Temporary Certificate of Occupancy (Temp CO) for new homes during the growing season from May 1st to November 1st. Issuance of a Certificate of Occupancy requires all permits associated with the project to be finaled and an as-built survey approved by the City. If vegetation is not fully established at the time of CO issuance, the erosion control escrow will continue to be held. 2 7 '-0 "20' -0"30'-0"16'-0"5'-0"6'-4"12'-0"11'-8" 5'-0"24'-6"2'-0"14'-0"1 4 '-0 "11' -8"35'-9 1/2"4'-0"1'-0"5'-0"8 '-6 1 /8 " 6 " 1 0 '-5 7 /8 "8'-0"1 4 '-0 "10' -2"1 6 '-7 "19' -6 1/2"6'-0"12'-0 1/8"13' -2 5/16"16' -0"14' -0"3' -0"2 '-3 " 9 '-9 " 9 '-9 " 9 '-9 " 9 '-4 5 /8 " 12'-6" 19'-6"2' -6"3 '-0 " 11'-0 1/2"1'-8 3/4"15'-8"6' -6"4' -10"5 '-5 " 5 '-5 " 1 6 '-2 " 5 '-9 " 3 '-6 1 /2 " 5 '-7 1 /2 " 5 '-2 3 /1 6 " 5'-8"105°105°105°75° N MARY + DAVIDO'KEEFE RESIDENCE2890 GOLDENROD WAY, ORONO, MN 55356REVOLUTION DESIGN + BUILD 18305 MINNETONKA BLVD #200 WAYZATA, MN 55391 952.594.5037 MIN LIC BC631863 ISSUED 03.29.24 FOR BID 06.14.24 FOR CONSTRUCTION 06.18.24 ADDITIONAL DIMENSIONS 06.21.24 UPDATES 2022 REVOLUTION DESIGN + BUILD© A1.0 SCALE: 1/4"=1'-0" FOUNDATION PLAN SCALE: 1/8"=1'-0" TYPICAL SECTION 6" STEM WALL TO MATCH 5-1/2" SILL PLATE #4 X 24" DOWELS AT 72" ON CENTER MAX (5" MIN. EMBED) 20" X 8" CONCRETE STRIP FOOTING #4 CONTINUOUS REBAR AT TOP OF WALL 1/2" Ø X 10" LONG ANCHOR BOLTS (7" MIN. EMBED) AT 72" ON CENTER MAX. OR EQUIVALENT METAL STRAP ANCHORS 12" Ø SONOTUBE DECK FOOTINGS BELLED TO 18" WIDTH AT BOTTOM 8" [TYP. 6 SUCH] 10" POURED WALLS AT WALL EXTENSIONS (TYP.) 10" POURED WALL 10" POURED WALL M A S O N R Y O P E N IN G 4 1 -1 /2 " M A S O N R Y O P E N IN G 1 6 ' 2 " 6 7 " M A S O N R Y O P E N IN G 1 0 0 -5 /8 " M A S O N R Y O P E N IN G 1 0 0 -5 /8 " M A S O N R Y O P E N IN G POUR SLAB DIRECTLY ON TOP OF THESE TWO WALLS 111-3/8" MASONRY OPENINGALIGNALIGNALIGNALIGN WH HB ELCA1763ELCA1763ELCA1763 5 4 7 0 E L C A 1 7 6 32868ELCA1763ELCA1763ELCAP3763ELCA3763ELCA1763ELCAP3763ELCA1763ELCAP3763ELCAP3763ELCAP3763ELCA1763ELCA1763 U S P D 8 0 7 0 U S P D 8 0 7 0 16X60 SCREENED PANEL16X60 SCREENED PANELELCA2963 ELCA2963 ESCAP1660 ELCAP1771 ELIFD9070 OXO ELCAP3719 ELCAP3719 ELCAP3719 2668266826682668 28682668266828682668 ELCA1763 4068286826681 6 0 7 0 3 0 6 8 ELAWN3723ELCAP1723ELCA1743ELCA374326682868E3E3 E6E6 E4E4 E5E5 E7E7 E8E8 E9E9 E10E10 E11E11 E1E1 E12E12 E13E13 E14E14 E15E15 E16E16 E18E18 E19E19 E20E20 E21E21 E22E22 E23E23 E24E24 E25E25 E26E26 E27E27E28E28 E29E29 S1 A4.1 S1 A4.1 S3 A4.1 S3 A4.1 S5 A4.1 S5 A4.1 S4 A4.1 S4 A4.1 E17E17 S2 A4.1 S2 A4.1 E2E2 E1 A2.1 E1 A2.1 E2 A2.1 E2 A2.1 E4 A2.1 E4 A2.1 E5 A2.1 E5 A2.1 30'-0"16'-0"12'-0" 6'-4" 10"1'-0"38'-5 3/8"1 5 '-6 1 /4 "11' -8"1 1 '-4 " 1 4 '-0 "14'-0"2'-0"24'-6"17'-11 9/16"4'-0"24" 5'-0"8'-0"1 4 '-0 "20' -0"2 7 '-0 " 8 '-6 " 1 0 '-6 " 6 "5'-0"2'-8"7'-8"9'-10"9'-10" 2'-7 1/2"6'-9"2'-7 1/2" 1'-8"3'-0"1'-8"11'-8"5'-7 1/2"3'-3"2'-9 3/8"8'-10"5 '-1 3 /4 " 4 '-6 " 4 '-8 1 /2 " 4 '-9 1 /2 " 5 '-1 3 /4 " 1 '-0 1 /2 " 5 '-2 "5'-10"4'-8 1/2"5'-3 1/2"4'-8 1/2"4'-0"2'-8" 6 '-0 " 2 '-6 " 5 '-9 "2' -6"1' -6"5 '-5 " 5 '-1 1 /2 " 5 '-5 "4' -1 1/2"4' -1 1/2"1' -10"4 '-2 1 /2 " 5'-5"5'-5" 10'-10"4'-4 1/4"4'-4 1/2"7'-2"5'-5 1/2"12'-9 1/4" 11'-10 3/4" 5'-0"1'-6"6'-7 3/4"9'-2 1/4"6'-4 1/2"11'-5"7 '-6 " 1 9 '-6 "1 '-1 0 "10'-4"14'-2"5 '-6 " 5 '-6 " 1 6 '-0 " 75° 105°105°105°105°BB BB CC CC 33 EE EE 33 2222 DD 44 44 3B3B 3B3B DD 1111 11 AA AA 26763 : 121/4 : 123 : 124 : 1 2 1/4 : 12 4 : 1 2 3 : 123 : 123 : 123 : 124 : 12N N 109 LVT 107 LVT 111 LVT 102 LVT 103 LVT 105 LVT 114 CARPET 001 CONCRETE 101 LVT 108 CONCRETE 106 UNFINISHED 110 LVT 104 CARPET 113 CARPET 112 TILE A1.1MARY + DAVIDO'KEEFE RESIDENCE2890 GOLDENROD WAY, ORONO, MN 55356REVOLUTION DESIGN + BUILD 18305 MINNETONKA BLVD #200 WAYZATA, MN 55391 952.594.5037 MIN LIC BC631863 ISSUED 03.29.24 FOR BID 06.14.24 FOR CONSTRUCTION 06.18.24 ADDITIONAL DIMENSIONS 06.21.24 UPDATES 2022 REVOLUTION DESIGN + BUILD© SCALE: 1/4"=1'-0" MAIN LEVEL FLOOR PLAN SCALE: 1/8"=1'-0" ROOF PLAN GUEST/OFFICEGUEST/OFFICE KITCHENKITCHEN LIVING ROOMLIVING ROOM WICWIC HALLHALL MUDROOMMUDROOM LAUNDRYLAUNDRY GARAGEGARAGE FOYERFOYER SCREENED PORCHSCREENED PORCH DENDEN UTILITYUTILITY 3/4 BATH3/4 BATH PRIMARY BEDROOMPRIMARY BEDROOM PRIMARY BATHPRIMARY BATH MECHANICAL CHASEWAY IN ATTIC ABOVE FURR DOWN SHOWER + TOILET ROOM TO 8FT 4 : 1 2 (2 ) 9 -1 /2 " L V L H E A D E R A B O V E R O 9 7 -5 /8 "X 8 6 -1 /2 "(2 ) 9 -1 /2 " L V L H E A D E R A B O V E R O 9 7 -5 /8 "X 8 6 -1 /2 "(2 ) 1 1 -7 /8 " L V L H E A D E R A B O V E R O 1 6 '-2 "X 7 '-1 " (2) 9-1/4" LVL FLUSH HEADER F L U S H H E A D E R A B O V E (2 ) 9 -1 /4 " L V L (2 ) 9 -1 /2 " L V L H E A D E R A B O V E (3) 2X10" HEADER ABOVERO 69"X63-5/8"2X10 WALL (2) 2X10" HEADER ABOVERO 53"X43-3/4"(2) 2X10" CONT EACH RO 29"X63-5/8" 7-1/2" FRAMING (2) 2X10" HEADER ABOVE RO 18"X72" 2X10 WALL 2X10 WALL 2X10 WALL TRANSOMS 109"X19 5/8" HEADER HT: 128-1/8"DOOR RO 108-3/8"X86-1/2" (2) 9-1/2" LVL HEADER (2) 2X10" HEADER ABOVE RO 17"X63-5/8" F L U S H H E A D E R A B O V E (2 ) 9 -1 /4 " L V L A C T IV E(2 ) 2 X 1 0 H E A D E R A B O V E R O 1 7 "X 6 3 -5 /8 " 2 X 8 W A L L (2) 2X10 HEADER ABOVE RO 34-1/2"X82-1/4"(2 ) 2 X 1 0 H E A D E R A B O V E R O 3 8 -1 /2 "X 8 2 -1 /4 " (2) 2X10 HEADER ABOVE RO 17"X63-5/8"(3) 2X10 HEADER ABOVERO 69"X63-5/8"4-1/2" FRAMING FRAMING 4-1/2"(2) 2X10" HEADER ABOVERO 37"X63-5/8"DROPPED HEADER "BM3" (2) 7-1/4" LVL(3 ) 2 X 1 0 " H E A D E R A B O V E R O 6 9 "X 6 3 -5 /8 "(2 ) 2 X 1 0 " H E A D E R A B O V E R O 3 7 "X 6 3 -5 /8 " F R A M IN G 4 -1 /2 " 6 X 6 C E D A R 4 X 6 C E D A R 6 X 6 C E D A R 4 X 6 C E D A R DROPPED HEADER "BM2" (2) 7-1/4 LVL FLUSH HEADER "BM1" (2) 9-1/4" LVL SEMI FRAMLESS 28" DOOR WIND BRACING PLAN/BRACED WALL LINE LEGEND A B C D E 1 2 3 3B 4 END CONDITION 4 - 54” BW - 54” BW - BW (39” OK BY <65% OPENING) 54” BW - 44” BW (<65% OPENINGS) - 54” BW - 54” BW CONTINUOUS BW (NO OPENINGS) CONTINUOUS BW (NO OPENINGS) CONTINUOUS BW (NO OPENINGS) 36” BW (<65% OPENING) - 44” BW (<85%) - 36” BW (<85%) - 36” BW (<85%) 24” BW (WITH 62" LIB WP) - 62” LIB - 54” BW - 54” BW WITH 800# HOLD-DOWN - END CONDITION 5 EC 4 - 62" LIB - 54” BW - 54” BW - EC 4 50” BW (<85% OPENING) - 54” BW - 54” BW - 48” BW (<85%) 54” BW - 54” BW (NO HOLD-DOWN DEVICES REQUIRED) DESIGNATES BRACED WALL SECTIONS (2) 2X10" HEADER ABOVE RO 17"X71-5/8"(2) 2X10" HEADER ABOVERO 53"X23-5/8"(2) 2X10" HEADER ABOVERO 17"X63-5/8"(2) 2X10" HEADER ABOVERO 17X63-5/8"(2) 2X10 HEADER ABOVERO 37"X63-5/8"(2 ) 2 X 1 0 H E A D E R A B O V E R O 6 4 "X 8 6 -1 /2 " (2) 2X10" HEADER ABOVE RO 17"X63-5/8" (2) 2X10" HEADER ABOVE RO 17"X63-5/8" DROPPED HEADER "BM2" (2) 7-1/4 LVL DECKDECK DROPPED (3) 2X12 TREATED BEAMS WITH 2X12 TREATED JOISTS 16” O.C. BROWN-TREATED 5/4 X 6" DECKING, FACE-SCREWED FLUSH (3) 2X10 TREATED RIM WITH 2X10 TREATED JOISTS 16” O.C. AND HANGERS BROWN-TREATED 5/4 X 6" DECKING, FACE-SCREWED TOP OF SOFFIT + TRELLIS AT 102-1/2" 62" LONG L.I.B. 62" LONG L.I.B. 62" LONG L.I.B. SIMPSON STHD 800# H.D.D. BRACED WALL PANELS SHALL BE: EXTERIOR: CS-WSP (WP) PER SECTION R602.10.4 3/8" MINIMUM SHEATHING FASTENED WITH 8d NAILS 6" EDGES, 12" FIELD INTERIOR: LIB PER R602.10.4 1X4 WOOD AT 45° TO 60° ANGLE ON STUDS 16" ON CENTER WITH (2) 8d NAILS EACH STUD AND TOP AND BOTTOM PLATES END CONDITION 4: PER R602.10.7 ALLOWS FOR 24" BWP AT BOTH CORNERS END CONDITION 5: PER R602.10.7 REQUIRES 800# HOLD-DOWN DEVICE (SIMPSON WALL STRAP STHD (OR SIM.) RATED FOR MINIMUM 800#) Drain to Daylight Openings between garage and residence shall have solid door 1 3/8" thickness, steel door or 20-minute fire rated doors Mechanical Ventilation Required Per MNF&G 505.4 Hoods exhausting in excess of 400cfm must provide heated makeup air at a rate approx equal to exhaust air rate Beam calcs show 300 cfm ELCA1763ELCA1763ELCA1763 5470 ELCA1763 16070 ELCA1763ELCA1763ELCA1763 5470 ELCA1763 16070 5470 16X60 SCREENED PANEL16X60 SCREENED PANEL 16070 ELAWN3723ELCAP1723 ELCA1743ELCA3743 5470 16X60 SCREENED PANEL16X60 SCREENED PANEL 16070 ELAWN3723ELCAP1723 ELCA1743ELCA3743 ELCAP3763ELCAP3763ELCA1763ELCA1763 USPD8070 ELCA2963ELCA2963ESCAP1660ELCAP1771ELIFD9070 OXO ELCAP3719ELCAP3719ELCAP3719 3068 ELCAP3763ELCAP3763ELCA1763ELCA1763 USPD8070 ELCA2963ELCA2963ESCAP1660ELCAP1771ELIFD9070 OXO ELCAP3719ELCAP3719ELCAP3719 3068 ELCA1763ELCA1763ELCAP3763ELCA3763ELCA1763ELCAP3763ELCA1763ELCAP3763ELCAP3763ELCAP3763 30682676 ELCA1763ELCA1763ELCAP3763ELCA3763ELCA1763ELCAP3763ELCA1763ELCAP3763ELCAP3763ELCAP3763 30682676 MARY + DAVIDO'KEEFE RESIDENCE2890 GOLDENROD WAY, ORONO, MN 55356REVOLUTION DESIGN + BUILD 18305 MINNETONKA BLVD #200 WAYZATA, MN 55391 952.594.5037 MIN LIC BC631863 ISSUED 03.29.24 FOR BID 06.14.24 FOR CONSTRUCTION 06.18.24 ADDITIONAL DIMENSIONS 06.21.24 UPDATES 2022 REVOLUTION DESIGN + BUILD© A2.1 SCALE: 1/4"=1'-0" EAST SIDE ELEVATION2 2.1 2 2.1 SCALE: 1/4"=1'-0" SOUTH SIDE ELEVATION1 2.1 1 2.1 SCALE: 1/4"=1'-0" NORTH SIDE ELEVATION3 2.1 3 2.1 SCALE: 1/4"=1'-0" WEST SIDE ELEVATION4 2.1 4 2.1 USPD8070USPD8070 54705470 ELCAP1723ELAWN3723 ELCA1743 ELCA3743 ELCAP1723ELAWN3723 ELCA1743 ELCA3743 26682668 ELCAP3719 ELCAP3719ELCAP3719ELCAP3719ELCAP3719ELCAP3719ELCAP3719ELCAP3719ELCAP3719ELCAP3719ELCAP3719ELCAP3719 26682668 ESCAP1660ESCAP1660 ELCAP1771ELCAP1771 26682668 SCALE: 3/8"=1'-0" MUDROOM BENCH3 A3.1 3 A3.1 MARY + DAVIDO'KEEFE RESIDENCE2890 GOLDENROD WAY, ORONO, MN 55356REVOLUTION DESIGN + BUILD 18305 MINNETONKA BLVD #200 WAYZATA, MN 55391 952.594.5037 MIN LIC BC631863 ISSUED 03.29.24 FOR BID 06.14.24 FOR CONSTRUCTION 06.18.24 ADDITIONAL DIMENSIONS 06.21.24 UPDATES 2022 REVOLUTION DESIGN + BUILD© A3.1 SCALE: 3/8"=1'-0" MUDROOM CLOSET4 A3.1 4 A3.1 SCALE: 3/8"=1'-0" LAUNDRY ROOM6 A3.1 6 A3.1SCALE: 3/8"=1'-0" WALK-IN PANTRY5 A3.1 5 A3.1 SCALE: 3/8"=1'-0" LAUNDRY ROOM STORAGE7 A3.1 7 A3.1SCALE: 3/8"=1'-0" FOYER SCREEN1 A3.1 1 A3.1 SCALE: 3/8"=1'-0" FOYER BENCH2 A3.1 2 A3.1 SCALE: 3/8"=1'-0" LIVING ROOM FIREPLACE8 A3.1 8 A3.1 SCALE: 3/8"=1'-0" FIREPLACE MANTEL WATERFALL9 A3.1 9 A3.1 SCALE: 3/8"=1'-0" KITCHEN FIREPLACE10 A3.1 10 A3.1 SCALE: 3/8"=1'-0" KITCHEN SINK WALL11 A3.1 11 A3.1 SCALE: 3/8"=1'-0" KITCHEN FRIDGE WALL12 A3.1 12 A3.1 SCALE: 3/8"=1'-0" KITCHEN DROP ZONE13 A3.1 13 A3.1 SCALE: 3/8"=1'-0" GUEST VANITY14 A3.1 14 A3.1 SCALE: 3/8"=1'-0" GUEST BATH15 A3.1 15 A3.1 SCALE: 3/8"=1'-0" GUEST SHOWER16 A3.1 16 A3.1 SCALE: 3/8"=1'-0" GUEST CLOSET18 A3.1 18 A3.1 SCALE: 3/8"=1'-0" PRIMARY BEDROOM DOOR + TRANSOMS19 A3.1 19 A3.1 SCALE: 3/8"=1'-0" PRIMARY BATH LINEN20 A3.1 20 A3.1 SCALE: 3/8"=1'-0" PRIMARY BATH21 A3.1 21 A3.1 SCALE: 3/8"=1'-0" PRIMARY SHOWER22-25 A3.1 22-25 A3.1 SCALE: 3/8"=1'-0" PRIMARY VANITY26 A3.1 26 A3.1 SCALE: 3/8"=1'-0" PRIMARY CLOSET27 A3.1 27 A3.1 8" THICK FLOATING VENEER BENCH SOLID SURFACE TOP WOOD VENEER BENCH TOP SOLID SURFACE COUNTERTOP WITH 6" SPLASH 4" THICK WOOD VENEER MANTEL WITH WATERFALL END TILE 21" WIDE STONE FLOOR TO CEILING WOOD VENEER MANTEL WITH WATERFALL END AVENTOS HF LIFT HINGES AVENTOS HF LIFT HINGES STAINED INTERIOR FROSTED GLASS DOORS MIRRORED DOOR AT LINEN CABINET SOLID SURFACE TOP WITH 6" DROPPED MITER + 6" SPLASH 60" X 40" MIRROR FLOATING VANITY WITH WOOD VENEER TOP SCALE: 3/8"=1'-0" GUEST BATH TO BEDROOM17 A3.1 17 A3.1 SCALE: 3/8"=1'-0" PRIMARY CLOSET28 A3.1 28 A3.1 SCALE: 3/8"=1'-0" PRIMARY CLOSET29 A3.1 29 A3.1 8" DROP MITER BENCH FRONT + BACK 16 X 36" SHOWER NICHE WITH ONE SHELF SOLID SURFACE TOP WITH 6" SPLASH SOLID SURFACE TOP MAKEUP VANITY FLOATING OFF BACK WALL SCALE: 1/4"=1'-0" PRIMARY BEDROOM SECTION MARY + DAVIDO'KEEFE RESIDENCE2890 GOLDENROD WAY, ORONO, MN 55356REVOLUTION DESIGN + BUILD 18305 MINNETONKA BLVD #200 WAYZATA, MN 55391 952.594.5037 MIN LIC BC631863 ISSUED 03.29.24 FOR BID 06.14.24 FOR CONSTRUCTION 06.18.24 ADDITIONAL DIMENSIONS 06.21.24 UPDATES 2022 REVOLUTION DESIGN + BUILD© A4.1 1 A4.1 1 A4.1 SCALE: 1/4"=1'-0" GUEST / BATH SECTION2 A4.1 2 A4.1 SCALE: 1/4"=1'-0" FOYER / HALL / KITCHEN SECTION3 A4.1 3 A4.1 SCALE: 1/4"=1'-0" GARAGE SECTION4 A4.1 4 A4.1 SCALE: 1/4"=1'-0" GARAGE / DEN / LAUNDRY / LIVING SECTION5 A4.1 5 A4.1 MANUFACTURED 24" ON CENTER PARRALLEL CHORD NEST TRUSSES WITH 2X10 TOP CHORD FOR EXTENDED OVERHANG 2X10 SPF SUBFASCIA 1'-4" HEEL HEIGHT 8'-1 1/8" PLATE HEIGHT 2X6 SPF 16" ON CENTER WITH R-21 BATT INSULATION POLY VAPOR BARRIER 1/2" DRYWALL XP THERMAL INSULATION TO TOP OF FOUNDATION STUD HEIGHT ±12' ENGINEERED TALL WALL IF NECESSARY 2X10 CEDAR AT TRELLIS (TYP.) 2X10 DECK LEDGER WITH BOLTS 5/4 X 6 TREX DECKING 2X10 TREATED DECK JOISTS 16" ON CENTER (3) 2X10 FLUSH RIM 6X6 WITH SIMPSON POST ANCHORS 12" Ø SONOTUBE FOOTING BELLED TO 18" Ø AT BOTTOM 8" GAF TIMBERLINE ARCHITECTURAL GRADE SHINGLES SYNTHETIC FELT PAPER UNDERLAYMENT 1/2" OSB SHEATHING WITH CLIPS R-21 BATT INSULATION WITH POLY VAPOR BARRIER 1/2" DRYWALL LEVEL 4 FINISH 8'-0" 2X6 ON CENTER STUDS FULL LENGTH 6" CONCRETE CURB WALL 8" POURED FOUNDATION 20" X 8" FOOTING 4" CONCRETE WITH 30" X 30" REBAR GRID SLOPED 1/4" PER FOOT TOWARD DOOR R-60 INSULATION WITH POLY VAPOR BARRIER OVERALL 8'-10" CEILING HEIGHT 2X10 SUBFASCIA MANUFACTURED TRUSSES 4:12 PITCH 24" ON CENTER ICE & WATER BOTTOM 6FT 2X10 SPF SUBFASCIA VENTED ALUMINUM SOFFIT + FASCIA 1/2" OSB SHEATING WITH HOUSEWRAP LP SMARTSIDE CEDAR TEXTURE PANEL WITH VERTICAL GROOVE 8" ROCK FILL COMPACTED FILL EARTH R-60 INSULATION WITH POLY VAPOR BARRIER 60 MIL FULLY ADHERED EPDM MEMBRANE WITH TAPERED ISO INSULATION AND METAL DRIP EDGE 1/2" OSB 14" FLAT ROOF TRUSSES 24" ON CENTER 8'-6" PLATE HEIGHT 3:12 PITCH ENGINEERED MONO TRUSSES 24" ON CENTER 2X10 SPF ENLARGED TOP CHORD AS REQUIRED FOR EXTENDED OVERHANG R-60 INSULATION WITH POLY VAPOR BARRIER 9'-1 1/8" PLATE HEIGHT 2" RIGID FOAM INSULATION 8" ROCK WITH POLY VAPOR BARRIER COMPACTED FILL EARTH XP THERMAL TO TOP OF FOUNDATION 2X12 TREATED DECK FRAMING 16" ON CENTER (3) 2X12 TREATED DROPPED HEADER 6X6 TREATED POST WITH SIMPSON POST ANCHOR 12" Ø SONOTUBE FOOTING BELLED TO 18" Ø AT BOTTOM 8" 24" X 12" CHASEWAY FOR MECHANICALS WITH 2X4 SPF + 1/2" OSB INSULATED WITH 3" R-20 CLOSED CELL FOAM R-60 INSTALL 2" AIR CHUTES CONTINUOUS ENTIRE SPAN NET AND BLOW R-60 INSULATION WITH POLY VAPOR BARRIER Guards shall be located along open sides of floors, stairs, ramps and landings located more tahn 30" from floor or grade below. Guards shall not be less than 36" in height Attic access is required. Shall be not less than 22" x 30" and be located in an accessible location. WH HB R R R R R R R R R R RRRR RRRRRRR R R R R R RRR R R EP 44 4 R WP N 109 LVT 107 LVT 111 LVT 102 LVT 103 LVT 105 LVT 114 CARPET 001 CONCRETE 101 LVT 108 CONCRETE 106 UNFINISHED 110 LVT 104 CARPET 112 TILE WITH INFLOOR HEAT 113 CARPET MARY + DAVIDO'KEEFE RESIDENCE2890 GOLDENROD WAY, ORONO, MN 55356REVOLUTION DESIGN + BUILD 18305 MINNETONKA BLVD #200 WAYZATA, MN 55391 952.594.5037 MIN LIC BC631863 ISSUED 03.29.24 FOR BID 06.14.24 FOR CONSTRUCTION 06.18.24 ADDITIONAL DIMENSIONS 06.21.24 UPDATES 2022 REVOLUTION DESIGN + BUILD© E1.1 SCALE: 1/4"=1'-0" MAIN LEVEL ELECTRICAL FLOOR PLAN GUEST/OFFICEGUEST/OFFICE KITCHENKITCHEN LIVING ROOMLIVING ROOM WICWIC HALLHALL MUDROOMMUDROOM LAUNDRYLAUNDRY GARAGEGARAGE FOYERFOYER SCREENED PORCHSCREENED PORCH DENDEN UTILITYUTILITY 3/4 BATH3/4 BATH PRIMARY BATHPRIMARY BATH PRIMARY BEDROOMPRIMARY BEDROOM POWER FOR FUTURE HOT TUB