Loading...
HomeMy WebLinkAbout3105 North Shore Drive - Building Plans: ResidentialReviewed for Code Compliance Nicole Egan RPS23-000179 12-11-23 Additional permits required: Plumbing Mechanical Electrical Sewer Stamped and approved plans must be on site for the duration of the project and all inspections. To schedule inspections call: 952-249-4613 Please have the permit number and street address ready at time of call. Please plan accordingly. The City will not issue a Temporary Certificate of Occupancy (Temp CO) for new homes during the growing season from May 1st to November 1st. Issuance of a Certificate of Occupancy requires all permits associated with the project to be finaled and an as-built survey approved by the City. If vegetation is not fully established at the time of CO issuance, the erosion control escrow will continue to be held. Handrail is required with 4 or more risers. Retaining walls over 4' require engineering and a separate permit. See Engineering Torque report required at footing/framing inspection. Provide fire blocking vertically at ceilings and floors, and horizontally at intervals not exceeding 10'. See Engineering Provide fire blocking vertically at ceilings and floors, and horizontally at intervals not exceeding 10'. Drain to daylight. Mechanical Ventilation Required in all Water Closets Screens cannot be replaced with windows at any time without engineering and an additional permit. Per MNF&G 505.4 Hoods exhausting in excess of 400cfm must provide heated makeup air at a rate approx equal to exhaust air rate Calc Sheets show matching powered makeup air - no CFM given. Window opening control devices on windows serving as a required emergency escape and rescue opening shall comply with ASTM F2090 See Engineering R48 is required R48 is required R48 is required If using exception, air leakage test cannot exceed 2.6 air changes per hour Top of wall bracing Garage Garage Mancave Front Wall by Stoop