Loading...
HomeMy WebLinkAbout1980-04-24 On Site Sewage Treatment Inspection ReportON -SITE SEWAGE TREATMENT INSPECTION REPORT On the North Shore of Lake Minnetonka POST OFFICE BOX 66 1335 S. Brown Rd. Crystal Bay, MN 55323 473-7357 OWNER R409E22'>—.mil LJnYT'o/v ADDRESS--/40S0 EDGaGwbOlIk N/Lt_S r>, PHONE PERMIT NO'S. 2?335 DATES 11'17--6? City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sewage treatment system at the above address has been inspected and appears to fall into the category checked below: Meets or exceeds current city standards in all respects relating to design, construction, and location. Appears to be operating properly. Does not meet current city standards in some respects relating to design, construction, or location. Appears to be operating properly. ❑ Does not meet current city standards in many respects relating to design, construction, or location. Appears to be operating adequately. ❑ Does not meet current city standards of design, construction or location, is being overused, or is failing to properly treat and dispose of the current input and is therefore endangering a water supply, is a source of pollution to surface or groundwaters, is creating a safety hazard, or is otherwise creating a public nuisance. Please contact the inspector to discuss requirements for repairs to your system. Soil testing may be re- quired. In all cases a design and site plan must be submitted for review. Your contractor must obtain a permit before work is cta►ted. WORK REQUIRED: ❑ Septic tanks must be pumped within 48 hours. ❑ Drainfield must be re dyed or replaced within 90 days. CKInspection riser (4-diam. pipe) must be installed in each tank. NEXT' r1mE 7q/Uk5 AoEE Pur-gPE1D Tank inspection indicates maintenance pumpout is needed as soon as possible. City ordinance requires that El tanks be pumpeo out every three years. SITE CHARACTERISTICS: Limiting Site Factors 19felope ❑Soil ❑High water table ❑ Lot size ❑Lake, wetland, or stream ❑ Drainage Potential for System Failure (depends on soil types, water table, and system condition) XLow ❑ Medium ❑ High ❑ System is causing visible surface discharge. Site Capabilities for Future Expansion ❑ Adequate Fair ❑ Poor ❑ Inadequate COMMENTS: TANKS SHOULD BE AJEMP D CUA7- Zt 1_1 �eEAR- Ole A)9L& - -10 La Date of Inspection Septic System ector This report must be kept on the premises with system location and pumping records. WHITE COPY / Inspector's File GOLD COPY / Homeowner