Laserfiche WebLink
ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />On the Nortb Shore of <br />Lake Minnetonka <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER _RAJA CSU I— .STUFJY`l$ u ADDRESS_.__Z.�f7 <br />PHONE . PERMIT NO'S. _ SZ 9' Si DATES_ <br />City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be inspected on a regular hssis. <br />The on -site sewage treatment system at the above address has been inspected and appears to fall into the category cf:ecked <br />below: <br />❑ Meets or exceeds current city standards in all respects relating to design, construction, and location. Appears <br />to be operating properly. <br />Does not meet current city standards in some respects relating to design, construction, or location. Appears <br />to be operating properly. <br />❑ Does not meet current city standards in many respects relating to design, construction, or location. Appears <br />r- be operating adequately. <br />ElDoe,not meet curren! city standards of design, construction or location, is beirq, car ured, or is failing to <br />properly treat and dispose of the current input and is therefore endangering E wate, wpply, is a source of <br />pie"ution to surface or groundwaters, is creating a safety hazard, or is otherwise creating a public nuisance. <br />Please contact the inspector to discuss requirements for repeirs to ynur system. Soil testing may be re- <br />quired. In all cases a design and site plan must be submitted for review. Your contractor must obtain a permit <br />before work is started. <br />WORK REQUIRED: <br />❑ Septic tanks must be pumped within 48 hours. <br />❑ Drainfield must be repaired or replaced within 90 days. <br />❑ Inspection riser (4" diam. pipe) must be installed in each tank. <br />❑ Tank inspection ino-cates maintenance pumpuut is needed as soon as possible. City ordinance requires that <br />to-iks be pump:.,: out every three years. <br />SITE CHARACTERISTICS: <br />Limiting Site Factors <br />5 Slope <br />❑ Soil <br />❑High water table <br />❑ Lot size <br />❑Lake, wetland, or stream <br />❑Drainage <br />Potential for System Failur^ <br />(depends on soil types, water <br />table, and system condition) <br />[1 Low <br />Medium <br />❑ High <br />❑ System is causing vi-iblP <br />surface discharge. <br />Site Capabilities for <br />Future Expansion <br />❑ Adequate <br />^air <br />C1 Poor <br />❑ Inadequate <br />Date of Inspection Se a System Inspector <br />This report must be kept on ti pre+nises with system IOW:,)n and pumping records. <br />WHITE COPY / Inspec.,r's rile GOI D COPY / Homeowner <br />