Laserfiche WebLink
MINNEGA900 SERVICE INSTALLATION <br />Map No. Natural Gas ❑ Propane Vapor ❑ Permit No. <br />Munici wk, Oron0 Minneapolis ❑ Order No. <br />io No. Deft Ordered 10.1-79 E No. <br />0owl m W% Neasa �+ � � A Ift �s <br />hm "Natloe Andres 4 `, v UAve ZIP <br />3 Noak _� Adddm- Tams I t• of Langdon P ark <br />Method of Installation or Construction (including method of compaction <br />and excavadon) will be in accordance with procadum r described in <br />Minn opeoo Operations Manual, Section 500, "Excavating, Bm*fillirg and <br />Surfacing", the most recent edition on file with the permitting authority. <br />Inewl : Servip Main Location <br />Additional Info. <br />Pressure Clay <br />To On ICity Engineer <br />JCity Council <br />iViIImp Council <br />(Town Board <br />The Minnesota Gee Company hereby requests pwmission to perform the work <br />indicated above. <br />MINNESOTA GAS COMPANY / <br />fcmw leabeer) <br />To the Minnesota Gas Company <br />Parmieeion is hereby granted the Minnesota Gas Company to perfornn the work <br />of <br />Daft _ my <br />A <br />r� <br />