HomeMy WebLinkAboutSeptic issueTO: Jeanne A. Mabusth, Planning & Zoning Administrator FROM: Stephen Weckman, On -Site Systems Manager DATE: March 3, 1993 SUBJECT: # 1805 Bob Veronyak, 1425 Bay Ridge Rd. Subdivision - Variance Public Hearing Soil testing and septic system design has been rejected for the proposed subdivision for several reasons. First, the proposed alternate drainfield site does not meet the required 20' setbacks from the proposed property line nor the existing driveway. Second, the recently adopted City Shoreland Regulations require that all existing septic systems within the shoreland district be inspected to verify system conformity according to City and Pollution Control Agency standards at any time a permit for or an intensification of a given property is proposed. The soil testing performed near the existing system indicates that a high seasonal water table is present, which will require the installation of mound systems. Therefore, the existing system is defined as non -conforming and must be replaced within one year of the subdivision and an additional drainfield site must be verified for this lot. Third, the site plan sent us by the property owner indicates that the driveway for the proposed new lot is defined over the primary and alternate drainfield sites for this lot. Also, two different site plans were enclosed, which show the drainfield sites in two different locations. A new site plan must be submitted to clarify this conflicting information. As the information provided has been rejected, I would recommend tabling the application until additional soil testing information can be provided. As described above, an additional drainfield site must be defined for the existing residence and the proposed alternate site defined must be redefined to meet the required setbacks. Also, the site plan must be altered to show that the drainfield sites for the proposed new lot meet the required setbacks from the lot line and driveway . A"A Alf LOCATION: 1425 Bay Ridge Rd. OWNER: Bob Veronyak GENERAL CONTRACTOR: CITY OF ORONO SEPTIC SYSTEM APPROVAL CITYof ORONO Municipal Oitices Post Office Box 66 Crystal Bay, Mhinmta 55323-Ii066 SEPTIC CONTRACTOR: SITE EVALUATOR: R & D Soil ConsultantsREPORT DATE: November 19, 1992 The City of Orono has Rejected your on -site system design as of March 2, 1993 (approved -disapproved) (date) with the following comments: See Attached Letter THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is enclosed. NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the Inspector (473-7357). Call for inspections 24 hours in advance. ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain in place until final site grading. Approval to pour footings will not be granted until the Inspections Department has verified that primary and alternate sites are adequately protected. NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' of tested drainfield sites either before or after system construction. Compaction of these areas could render them unusable prohibiting the timely completion and or limiting the long term use of the property. A site copy will be available at the City Offices for the septic contractor. CITY OF ORONO By Stephen an, On -site Systems Manager TELEPHONE — 473-7357 • FAX - 473-MIO Your soil testing and system design has been rejected. First, the proposed alternate drainfield site does not meet the required 20' setbacks from the proposed property line nor the existing driveway. Second, the recently adopted City Shoreland Regulations require that all existing septic systems within the shoreland district be inspected to verify system conformity at any time a permit for or an intensification of a given property is proposed. Therefore, the existing system must be inspected to determine conformity with the City of Orono Septic Code. if the system is defined as non -conforming, it must be replaced within one year of the subdivision and an, alternate drainfield site must be verified for this lot. Third, the site plan sent us by the property owner indicates that the driveway for the proposed new lot is defined over the primary and alternate drainfield sites for this lot. Also, two different site plans were enclosed, which show the drainfield sites in two different locations. A new site plan must be submitted to clarify this conflicting information. Be advised that the City requires notification when soil testing is being performed, especially when frost is in the ground or site limitations are encountered. A lot of time and money could be saved by consulting City staff regarding soil testing requirements before extensive testing has been completed. Please contact me at the City offices if there are any questions. CITY OF ORONO - VARIANCE APPLICATION Initial Application Fee $175.00 ($50.00 per each additional variance) Renewal Variance Fee $100.00 (no change from original application) Variance -for non conforming use $2.00.-00 After -the -Fact Fees (Double.application fee) ------------------------------------ -------------- PROPERTY INFORMATION Site Address 1407 .BAY RIDGE_ RD. WAYZATA, MN. 55391 Property Identif.. Number (P.I.D.) 10-1_17-23-34-0001 Attach legal description to application if not included on required survey. is'ryC4i� p5+3 �; xws-t CCTV OF ORONO PINANDE DF ICL 13510,ivviivv ��{� CPI 3�)% 4 uus 4+,-, 0.'v' 0. #26581V COW R01 TO 01Zr - Date Property Acquired (month/year) I (do) (do not) also own the adjacent parcels of land. Present use of property: presidential __�_other(specify) Zoning District: APPLICANT Phone (home) 476-1435 Name kOBERT VORONYAK Phone (work) 559-1711 Address: P,O. Box 147 city: LoNG LAKE, P1fi,zip: 55355 --------------------------------------------------------------------------- OWNER Cif different than applicant) Name Phone (home) Phone (work) Address: City: zip: --------------------------------------------------------------------------- DESCRIPTION OF REQUEST Estimated Construction Cost $_790,000.00 Describe request in detail: 1 AND SJDF SET BACK, --------------------------------------------------------------------------- VARIANCES REQUIRED X Lot Area X_ Lot Width Hardcover Lot Coverage X Setback:' " Front X Side Rear Average Lakeshore .Other (specify) EMMSHIP/bESCRIPTION OF UNUSUAL PROPERTY CONDITIONS Describe undue hardship or practical difficulty and unusual property conditions preventing compliance with Zoning Code requirements: PLOTTED BEFORE 2 ACRE ZONING REQU I REPIEPIT . ALL EXISTING IIEVELOPtiENT _ R❑ c r= n n m F n p M r= R Z n ni r ni r_ NO q.14 1 T 1 A PIA-L 6 A N•P—A-kcA1_6 A R'�.{ . .- �� (attach additional sheets if necessary) REQUIRED SUBMITTALS All of the following information must be submitted by the application deadline date in order for your application to be considered complete: 1. X Completed Application Form 2.__X_Certified Property Owners List of owners within 150' (you must obtain this list from Hennepin County Department of Finance A--603 Govt Center . 348--3271) . 3 Plat Map. (obtained with property owners list). 4'Cert.ficate of survey (signed by a licensed surveyor) to include hardcover calculations as required (provide one (1) copy 83"x1l" for reproduction). 5.­X Topographic survey (existing and proposed elevations) if any changes 1h "exi sting grade are proposed (provide one copy 8h"xll") • 6. X Sketches or plans of f loor & elevation views (provide 1 copy 81"x1l"). 7.. As an addendum to this application, please attach a separate list of any other persons you wish notified of this application. S. Additional items as may be requested by City staff. The Applicant and Property Owner must sign this application. Please remember that your variance application is not complete if the above information has not been included. --------------------------------------------------------------------------- APPLICANT'S SIGNATURE The applicant hereby agrees to provide all information required or requested by the Zoning Administrator, agrees to pay additional fees (staff time not covered by original fee payment) and/or consultant expenses incurred in review of this application, and certifies that the information supplied is true and correct to the best of his/her knowledge. Applicant's Signature i Vt Date 2-19-93 _ OWNERS SIGNATURE The owner hereby ackowledges and agrees to this application and further authorizes reasonable entry onto the property by City staff, consultants, agents, Commission members, and Council members for purposes of investiga- tion and verification of this request. Owner's Signature Date Applicant must have all submittals into the City offices 25 days before the Planning Commission Meeting. Planning Commission Meetings are held on the third Monday of each month. Applicants must be present at all scheduled review meetings of the Planning Commission and Council. If an applicant is unable to attend a scheduled meeting, please make arrangements to have an authorized agent attend in your place and to advise the Building & Zoning Office of this change prior to the meeting. .� ^ PERCULATION TEST and Mound System Design For Bob Voronyak ' t425 Bay Ridge Rd WayzatA ON .. ` 55391, Syt' 'ocation: 140 Bay Ridge- Rd Wayzata MN 55391 Orono Zoning Prepared By R & D Soil Consultants 11585 110th St. Cologne, MN 55322 (612) '466-2667 M.P C.A. Certification *758 ^ November 19, 1992 Bob Voronyak 1435 Bay Ridge Rd Wayzata MN 55391 RE: Septic system design and percolation tests for; Minnesota Pollution Control Agency 1407 Bay Ridge Rd Wayzata MN 55391 Orono zoning We were retained by Mr. Voronyak to provide criteria for the design and installation of an individual sanitary sewage treatment system to handle the sewage flow generated by w�ter-use appliances within a single family dwelling,. A total of six (6) soil percolation tests were performed on November 6, 1992 at a representative areas to the west of the dwelling. In addition, four (4) soil borings were drilled with a 2" i.d. x 3 1/4" m.d. Hand auger to check for the position of the ground water tab1e and to identify the underlying soil types. Location of tests- and borings are shown on the site plan. The percolation tests were performed in accordance with the provisions of "Minnesota Pollution Control Agency Rules and Standards Chapter 7080." The perc.:olation tests holes were drilled to a alternate mound depth of 12 irlches with a 5" i.d x 6" ��.d. auger. Two inches of pea gravel were placed in ^ bottom of each hole to prevent scoring. Water was then added to the test holes and replenished as necessary, maintaining a 12-inch head of wat�r over the bottom. After a period of saturation, each hole was refilled to a 12-inch head of water ovt�,r the bottom, and the percolation tests commenced. Voronyak November 19, 1992 Page 2 Percolation Test Results Results of percolation tests at holes P-l'P-2,P-3 and P-4 are shown as observed. Perco%ation rates in minutes per inch are indicated as shown below: P-1 hole P-2 hole P-3 hole P-4 hole P-5 hole P-6 ho1e 28 mpi 29 mpi 31 mpi 30 mpi 28 mpi 27 mpi Secondary Site 29 mp1 Primary site - 28 mpi Soil Borings (Secondary site) B-1 B-2 Black clay loam V - 12" Black clay loam 0 12" Lt. brown sandy clay 12" 32" Lt. brown sandy clay 12" 34" Sand 32" - 50" Sand 34" 50" Yellow clay 50" 60" Yellow Silty clay 50" Mottling at 38" Mottling at 42" B-3 B-4(Primary site) Black clay loam V - 08" Black clay loam 0 - 12" Lt. brown sandy loam 8" 32" Lt brown sandy clay 12" 48" Yellow clay sandy 32" - 60" Yellow clay - 60" Mottling at 4()" Mottling at 34" B-5 B-6 Black clay loam V 1�2" Black clay loam 12" Lt brown sandy clay 12" - 38" Lt brown sandy clay 12" - 34" Yellow Ssandy clay 38" 60" YeIlow sandy clay 34" - 6()19 Mottling at 32" Mottling at 30" Dfe i gn Requirements November 19, 1992 COnSsidiPIring the {s{:}Zls data and minimum design requirements Of the Septic System ordinanc•_a, our proposal is as follows: Construct a Mound d Syst f m based 1--:01 a W it r:.!'r LASRge of 75() gallons per clay, for 3 Bedroom Type I. 454 grid x .63 sq. f t . pgpd = 373 sq.. feet Eyed area --minimum design size Proposed De<.si.gn Sire 1.0 x 40 bed = 400 sq. ft bed area., 1'- :000 gal. t.arlk. 1- 1250 gal.. tank 1— 1000 gal. pump tan!•:: Consst r uc: t i on f- r c,F,.-dur e For A S ewiige Tr e: at r!Ient MOL.tns:i Soil Sur f ac f. Preparation A_f_Fi.nc:h�discharge ..pir.-)�wfrom the pL.tmiz) try erlci of the mound are --A shall be in=st-_llled j�rior to <.•aoilsurface pr�`F.1erati-:-Jl. The trench r^xcavated to install the discharge pipe sahall. L)te carefully back —filled and compacted to prevent sewage of is=f fIuent. The total area ssel.e..,teci for the mc,Und, incl.L.tdi.ng that !_udder the dikes, shall be rr-)ughlened in order to thoroughly bre::ak up any existing sod layers an .to provide a suit,aj } :: transition zone between the original sr.:�X1 and the sand laver c:-f the mound. The area shall be roughened only when the, f rricii store content of 'thlk` ss.:.il S inches below til4: surface is drier than thle:• plastik_: limit. The plastic: limit is the stoil. moisture cc_intent below whli.c.h the soil May tie ManiPulated finr purposes of installing a ssrii•l treatment system, and above whif:.h Manipt..tlation will cause compaction and puddling. Surface preparation or ssc:arifi.c-ati-nn will, be, performed with a back -hoe bt..tcket. There shall be no dead furrow in the riiound construction area„ I~I.�L.tnd constrL.tctiOrV shlall proceed immediately aftexr sL.tr'far_.e preparation is C-Ompleted. Every effort should be taken tc,.. prevent rain frorn falling on the prepared soil. surface., Consstructicin Materials & Distribution of Effluent A� .le_cit1-4Jashle,Ld �� ,and lElvershallbe- pla-:.ed�where^tile filter t:rock: tied? mate-rial is to be located., This sand layer must be at least, 12-- inches; deep and should be deep enough to level area for mv.)L.tnd. A crawler tractor with a blade �r bt_tct-cet shall be: used to riie-we the *sand into, plane. At lcsa��'t 6 inches of sand shall be kept under the trac-ks t.:,) mini.rrtii.. •.'a compaction Of the scarified layer. The sane.[ layer upon which the filter material is placed shall be level from side to side and end to end. Only c1ean sand i to be used. Bob VoronyEak: November 19, 1992 A depth Of at least 9 i.r•tcche"�ss of clear, rocj< :l 1/4 inch diarr,eter to 2 1/2 inches in diame::ter, shall be, placed on the siand layer prier to installing the distribution pipe. Pressure Distribution F"ffluerttTs�hal.lWl�eTdis.tributted over the filter material by a 1 1/2 inch diameter perforated pipe t..tnder prt�sssat,Are�„ P,L' ,rfc.iration hol.e�,s sshal.l. be 1/4 inch in diame-ter drilled in as straight l.:ir7e. along tile length of the pipe. i4ole, spacing shta:l.l. be SE inches. holes shall I:ae c:}r•i•lled straight into the: pipe and not at an angle. A sharp drill shall be' uS_set.l and any burrs in the inside or ot-sts:sidc: of the pipe shall be rt-rrecived. The perforated piper laterals shall be installed level with the perfcara-tionss downward. 'The perforated pipe laterals shall be c-onnectet_i to a 2 :irte.ht diauieteyr manifold pipe artc:l shall have their ends capped. 'They laterals:; ':shall be s }:?r c. E—d no fuarther than dso in,=hers on center and no ft..trther than 2.0 inches from the edge of the fiIter rficate•ri4.1 hie ntanifolc;l pipe shall. lae 170nneCte*d to the Supply pipe franT, the- pump. Then manifold shall be sloped toward the pump for complete drain bact� Of of flc.rent. PutrrEp and collection Tank: A�I.►LAmpWshall bey�ussed Tto deliver eaf f:l a.tent to the mound. The I;3t.tml:.► shall be cast ircin or bronze fitted with sstCainles s steel. screws Or c:onstruc•ted of rather s:sound, durable and corrosion -resistant niat-ttrialsa. Locatic-n of pl, mp tank and seh:►ti.} tank Cat) be OptionKal dWL- tC; the use of ra presst,.trized mound. An alarm device ssshal.l be installed to warm of pump failt..tre. The dosing chamber will be sized fi:nr a minimurrr of 2 days of restricted Use dc.re t0 arrrount Of daily use. Pt_trrip Discharge -Fhearpurrip�discharge >=:K-ap�:lrity i s based mtin the perforation spar::ing and perforatie-n diameter. Thiss system has i.nd:i.vidual lateral lengths of 40 -feet; laterals:; will Imes 2 inch plastic: pil:je with 1/4 inch perforations spaced 36---i aches al --)art.. This size will rc:cic.ti.re B [:GPM per 100 s~,t:lt-tare feet Of l�eci. area., A 32 GPM minimum pt-trrip discharge c apac:ity is recaL.tirLd. The Inutmp discharge. head shall be �jt least 5 feet greater than the head re tjt.tired to overcome the pipe friction l.os-; and they elevatican difference between the pt-trrip and till perforated laterals i-af tile pressure distribr..ttion system, which is; miniffIL ) of (sews pump sheet') 2 2- foot head.. Bob Voronyak November 19, 1992 The quantity of effluent delivered each pump cycle should be at least 110 gallons, but no more than 130 gallons per cycle. The amount of effluent pumped per cycle depends on the surface area of the pumping tank and the setting of the pump start and stop. A relatively large pumping tank surface area is needed with a small pump out depth. - There are several pumping situations that can be uspdwith this on —site sewage treatment system. These situations should should be in concurrence with the County Ordinance and the contractor installing the system. Inspection Pipe ---------------- A vertical inspection pipe at least 1 1/2 inches in diameter to the bottom shall be installed in the rock layer of the mound. The inspection pipe shall be located at an end opposite from where the sewage tank effluent enters the rock layer, The inspection pipe shall have 3/8 inch, or larger, perforations spaced vertically no more than six inches apart. At least two perforations shall be located in the rock layer. The inspection pipe shall extend to the bottom of the rock layer with an elbow beneath it and shall be capped flush with or above the finished grade. Pail:] Voronyak November 19, 199 MAINTENANCE lumping e;,'f Septic Tanks. The owner of any indi.vi.dual.�sewage treatment system M-it.rr.•rl.d properly clearl the:, Se17tic tank or tanks at least orlr.=Qre every two (2) years or Sooner if necessary sary 11`1 or€iej- to flrevt--nt the Sludge from reaching any Mardi -it -.-T riser than 12" from the lxottorri of the outlet baffle or thre s ct.xm from reaching a poi.rlt closer than 3--inches aP.at_v-F the bottom, c-.f the cutlaat baffle. Drainage arld final Landscaping All SLArface wci'berss must be f• capt eaway from they mouncl-ar't'a. A dr-Eainlge? Plat, SPIould be ccirjiple=ted to ensure that surface run-off from roof and [lark.i.ng surfaces are drained away -fr{::.[Tt the system. To help the functioni.r'rg Of tl'le IriOUnd system, it must be sc-dded or <_��=e �:9t�cl. Shrubbery can be planted around the lust, but NOT on tc-ip of the ffIC' nd. If sod is nat feesiAble the rrEOr.rrld -ar ea s1•ral l be covered with !'lay and seeded as to prevent errosion. A water meter i-m.4sst 1-)e installed to Me': aSUr e -al.). wat e.r entering this syste=rl). NOTE: If a chlorinated [-lot tub is installed in the hou-;e i 3- s must «be^dayl. i ght e3(j F.And not pl. Umbed into- the septic - - says,tem. � Chlorine Doe-T..; f::ill bacteria in these ptic tanks. Bob Voronyak General November 19, 1992 The contents of this site evaluation and design report are to be applied to the property listed --reprints for other application only with the permission of Donald Gchneewind. The soil conditions have been established at the test hole locations only. There may be variations in so{I stratigraphy between and around the borings, and interpolation and extrapolation of the results is not warranted. All requirements of this design shall be followed in order for the system to perform up to the designed capabilities. References Home Sewagf treatment University of Minnesota Agriculture Extension Service Roger E. Machmier Extension Engineer And Orono City System Ordinence and Minnesota Pollution Control Agency Rules and Standards Chapter 7080 If you should have questions or need further information, you can contact staff at City of Orono(zoning) or me at your convenience. Si�cer��y ' R & D So Is Condu1tants MOUND DESIGN WORKSHEET (For Flows up to 1200 gpd) A. FLOW Estimated �_ gpd (seepages D-7 or I-3, 4, 5) or measured gpd x 1.5 = B. SEPTIC TANK LIQUID VOLUMES 1 • !a3-D 5 -A r !j allons (see pages C-3 or C-5) C. SOILS (refer to site evaluation) 1. Depth to restricting layer = S o inches 2. Depth of percolation tests = i inches 3. Percolation rate �tf mpi 4. Land slope 0 �_% D. ROCK LAYER DIMENSIONS I. Multiply flow rate by 0.83 to obtain required area of rock layer: Daily Flow x 0.83 = q6h gpd x 0.83 sq. ft./gpd = 3 /3.Ssq. ft.=qt�° 2. Select width of rock layer 00 feet or less) _ _ /O ft. 3. Length of rock layer = Area + Width = qcn sq. ft. = 0 ft. = fo ft. E. ROCK VOLUME 1. Multiply rock area by rock depth to get cubic feet of rock; sq. ft. x ft. = ol> cu. ft. 2. Divide cu. ft. by 27 cu. ft./cu. yd. to get cubic yards; AcD cu. ft. - 27 = ±1? cu. yd. 3. Multiply cubic yards by 1.4 to get weight of rock in tons; , cu. yd. x 1.4 ton/cu. yd. = .JJ tons. P. AU5U1tY"11UN WIDTH 1. Percolation rate in top 12 inches of soil is c�'F mpi 2. Select allowable soil loading rate from table on page E-; �b gpd/ftz 3. Calculate adsorption width ratio by dividing rock layer loading rate of 1.20 gpd/ft' by allowable soil loading rate; 1.20 gpd/ft' _- t gpd/ft'_ , do Check this value ot1 page E-16. 4. Multiply adsorption width ratio by rock layer width to get required adsorption width; cox fa ft= o')� ft -11 Estimated 5ewagc)'lows in Callms ptr duy (gpd) ,ium xr of .I.ypc I 'Type li Type III jj 71V Bedrooms 2 300 225 180 3 450 XXl 218 60% 4 600 375 256 ord. 5 750 450 294 ralucr in 6 900 525 332 Tpps I. 7 1050 6W 370 lu B 1200 5 L2 408 1 column Septic Tank copacilie; In Rallanr Number or Minimum Liquid I Liquid capw:iiywith Iledrooms Capacity aarhage dirl+usal 2 or tell 750 1125 3 or 4 IOIXI 15M 4 w 6 ISM 2250 7• 11 or 9 2(XX} 31XX1 oror 9 ...... Rock lied :r�::r :•:.�. T Width s ••Length••- i Ahsnrplion Width Stunt: Table I'MrOlMliOn Rate in Minutes per Inch (Mill) Soil Teslure Gallons per day per syusre foot itatio of Absorption width it, flack Layer Width Faster than 0.1 + Coarse-S•rtxl ...__ 0.1 to 5 Sand 1.20 1.00 0.1 to 5 - Fine Sand ++ 0.60 2A) 61015 Sandy Loam 0.79 1,52 1610 30 Loom 0.60 2.IX1 31 to45 Silt Loam 0.50 2.40 46 to 60 Clay Loam 0.45 2.67 60 to 120 Clay 0.24 5.OU Slower than Clay 120*i* - Gb DOWNSLOPE DIKE WIDTH 1. If landslope is 2.9 percent or less, basal width includes both the upslope and downslope dike widths, 2. Calculate minimum mound size based on geornnetery: a. Determine depth of clean sand fill at upslope edge of rock layer: Separation _ I feet b. Multiply rock layer width by landslope to determine drop in elevation; Slope Difference x C % + 100 4 _ feet c. Add depth of clean sand depth of clean sand for u separation of upslope edge (2a) to depth of rock layer to rock depth and the depth of cover to find the total mound height at upslope edge of rock layer; - 1- ft + 1 ft + 1 ft = 3 feet d. Enter table on page bottom with landslope and upslope dike ratio. Select dike multiplier of _ 1, 0 e. Multiply dike multiplier by upslope mound height to get upslope dike width: qO x _s- _ /Q feet f. Add the depth of slope difference (2b) to the upslope height to get the downslope height 1_+&`=_-7__feet g. Enter table on page E-18 with landslW116 a and downslope dike ratio. Select dike multiplier of h. Multiply dike multiplier by downslope mound height to get downslope dike width: -�i- x -3-- = /.') feet i. Mininmum'mound width is the sum of upslope dike width plus rock layer width plus downslope dike width; Ll ft + IE ft + / A ft = feet j. Subtract the Minimum width G.i from the Absorption width FA to find the Additional Downslope required for Absorption ft - - ft = feet Upsk k. Add the Additional Downslope required for Absorptio to the downslope dike width and recalulate the Total Mound Width which is is the sum of upslope dike width plus rock layer width plus downslope dike width 00 _ft + /0. ft +_-0'0 ft ='J-P feet 1. Total mound length is the sum of upslope dike width plus rock layer length plus upslope dike width; loft + 6 ft +'Ye�' ft = _ feet 1 A -&Corer Ir�rt� a _ reef Separ.um fell Slug 1ldrerena ., fln� fled wl lh �1ar U-n.lupe 4YMrh __Ieer h- ---�'%tal Length _--&b 3:1 4:1 130w11s ope 5:1 6:1 7:1 3:1 4:1 pslope 5:1 kl 7:1 B:1 96 s10pe 0 3.0 4.0 5.0 60 7.0 3.0 4.0 5.0 6.0 7.0 8.0 1 3A9 4,17 3'26 6.38 7S3 2.91 3.85 4.76 5.66 6.54 7.41 2 3.19 4.35 556 6.82 8.14 2.83 3.70 4.54 5.36 6.14 6.90 3 330 4S4 5.98 7.32 9.86 2.7S 3S7 435 5.08 5.79 6.45 4 3.41 4.76 6.25 7.89 9.72 2.69 3.45 4.17 4.94 5,46 6.06 5 6 353 5A0 6.67 9.57 10.77 2.61 3.33 4.00 4.62 5.19 5.71 3.66 5.26 7.14 9.38 12.07 2.54 3.23 3.85 4.41 4.93 5.41 7 3.80 556 7.69 10-34 13.73 2.48 3.12 3.70 4.23 4.70 5.13 8 3.95 5.98 8.33 11S4 1S.91 2.42 Ma 357 4.05 4.49 4.88 9 4.11 625 9.09 I3.(4 18.92 2.36 2.94 3.4S 3.91) 4.30 4AS 10 429 6.67 10A 15A0 2333 2.31 2.86 3.33 3.75 4.12 4A4 11 4A8 7.14 11.11 17AS 30A3 2.26 2.78 323 3.61 3..95 426 12 4.69 7.69 12S0 21A3 43.75 2.21 2.70 3.12 3A9 3.80 4A8 END PERFORATION OF A PERFORATED LATEW PRE55URE D1STR1i311T1ON SYSTEM 1. Select number of perforated laterals ) 2. Select perforation spacing = - 3 _ feet 3. Since perforations should not be placed closer than 1 ft. to the edge of the rock layer (see diagram), subtract 2 ft. from the rock layer length. .wq0 -ft. -3�' feet Rock layer length 4. Determine the number of spaces between perforations. Divide the length above by perforation spacing and round down to nearest whole number. .0 Gross [aver Tapsalt • LoarySand �Yqr Loyer of Geoleellle Fabric r-- Inch layer of hay or 11row ` '' � e•"� �.' 1' ud rorin paper) I Drilled Nar h. • t e/4` PIU4 .. 11 Into C. pyNear hP 1 r i '•,]-Al Least Ix• to E• a pleld Rock of Rack Layor . -Per lorollalu Located of . Clean Sand Layer Balrarrl of Lateral `- Original Sall Properly Scarlrie4 Before Plaeing Sand Layer TABLE Or. PERFORATION DISCHARGES IN G IHead Perforation diameter (inches) I I "/" I '/e Length perf. spacing -._---ft, as�ft. saces 1.04 1.5 0.56 0,69 0.74 0.90 •S 03) {#2) 2.Ob 2.5. 0.80 0.89 1A4 1.17 5. Number of perforations is equal to one plus the number of 3.0 0.98 1.28 perforation spaces , 4.0 5.0 1.13 1.26 1.47 1.65 nUse 1.0 foot of head for residential systems. spaces -1- I = 1_ perforations per lateral bUsa2.0 feet of head for otltereslablishments 6. Multiply perforations per lateral by number of laterals to get total number of perforations. x � _ra - perforations lateral s pt:rfs/lau•ral - 7. Determine required flow rate by multiplying number of perforations by flow per perforation 4(9 perfs x gPot/perf gplll. Table 2 Maximum ollowobte numher or gdater inch per-forrrlians per lateral to guaraniLV c 1 0 % IMschurRa varialian perforallnnspeeing (r�wp 1,25 IIICtl 1.5 inch i.{} in 2.5 14 18 28 3.0 13 17 26 3.3• 12 16 25 4.0 11 15 23 5.0 10 14 22 8. If laterals are connected to header pipe as shown on upper example, select minimum required lateral diameter from table 2; enter table with perforation spacing and number of perforations per lateral. Select minimum diameter for perforated lateral w _ 1 rq inches 9. If perforated lateral system is attached to manifold pipe near the center, as in lower example, perforated lateral length and number of perforations per lateral will be approximately one half of that in # 6. Using these values, select minimum diameter for perforated lateral from table 2 perforated lateral inches ..ro,q.r�r� isrriwrM,rrw",',c�1wr .-ems,- tm_ Sizing of Pu>t V ,f9tation 1. Determine Surface Area Rectangle = Area = L x W x = Circle = Area = x x {Radius)' 3.14 x x - square feet square feet Other = Get Surface Area from Manufacturer square feet T Width 1 Length Radius n = 3.14 2. Calculate Gallons Per Inch There are 7.5 gallons per cubic foot of volume, therefore you must multiply the area. times the conversion factor and divide by 12 inches per foot to calculate gallons per incli Area x 7.5 gpft 3 + 12 inchs per foot x 7.5 + 12 = gallons/inch. 3 Cry 3. Calculate Gallons to Cover Pump (with 2 inches of waler covering pump) (Height (in) + 2 inches) x gallons/inch 02) { i- +� ) x 1= -3�(O gallons 4. Calculate Total Pumpout Volume a. To maximize pump life select sump size for 4 to 5 pump operations per day. -!L6 gpd + 4 = . , gallons per dose b_. Calculate drainback 1. Determine total pipe length, YO, feet. 2. Determine liquid volume of pipe, gallons per 100 feel. 3. Multip,Ilength by volume! Drainback quantity = feet x -M-� allons/100 ft. = jaj, gallons. c. Total pump out volume equals dose volume + drainback 1j.gallons per dose + _ gallons = " Q- gallons 5. Calculate Volume for Alarm (typically 2 to 3 inches) Depth (in) x gallons/inch (#2) = -- - 3 x .Q-3 = 120 gallons 6. Calculate Reserve Capacity (75% the daily flow) Daily flow (see page D-7) x .75 = Y-M x .75 = .33 2 gallons 7. Calculate total gallons gallons over pump + gallons pumpout +gallons alarm + gallons reserve capcity #3 + 44 c+# 5 +# 6 +=gallons 8. Total Depth (Total gallon divided by gallon per inch) Total Gallon 07) +gallon/inch 02) � + = „IJ inches �. Float Separation Distance (equal total pumpout volume) Total pumpout volume 040+gallons/inch (42) ate+ = _V inches Estimated Sewage Flows in Gallons t ;•r div (8pd) Number of Type I T} i t 'i 1 l7c J 11 1},pc 11 edrooms I V 2 225 180 3 3W 218 60Y 4 a (1(} 375 5 750 450 6 900 525 332. 7 1051' 600 370 8 12O:� �75 408 co[uinnz PI dieu+acr inches Gartixu fx• 1.25 7.77 1.5 10.58 2 17,43 2.5 , 3 36. 66.1 Reserve Capacity Alan) Pump oil To 1 Pumpout Volu., �. Pump Off Pump Height® P MP ELE TION PROCEDURE A. Determine pump capacity: Gravity Distribution 1. Minimum suggested is 600 gallons per hour 00 gpm) to stay ahead of water use rate. 2. Maximum suggested for delivery to a drop box of a home system is 2,700 gallons per hour (45 gpm) to prevent build-up of pressure in drop box. Pressure Distribution 3. a. Select number of perforated laterals b. Select perforation spacing = "' ft. c. Subt a �2 ft. from the rock layer length. Kmaye, ngt - 2 ft. _ . ft. d. Determine the number of spaces between perforations. Length perf. spacing = _ ft. + _3_ ft. = spaces c. /P...- spaces + 1 = _ perforations/lateral f. Multiply perforations per lateral by number of laterals to get total nu ber of perforations. al]s x Pc s eleral= -• Perforations. g. x gp` mTPkf = gpm. SELECTED PUMP CAPACITY 42-eV gpm B. Determine head requirements: 1. Elevation difference between pump and point of discharge. feet 2. If pumping to a pressure distribution system, add five feet for pressure required at manifold _,!�_ feet 3. Friction loss a. Enter friction loss table with gpm and pipe diameter. Read friction loss in feet per 100 feet from table. F.L. _fit ,31 ft./100 ft of pipe b. Determine total pipe length from pump to discharge point. Add 25 percent to pipe length for fitting loss, or use a fitting loss chart. Equivalent pipe length -1.25 times pipe length = x 1.25 = _ �` feet c. Calculate total friction loss by multiplying friction loss in ft/100 ft by equivalcnpipe length. Total friction loss = - x � � -100 = e r feet 4. Total head required is the sum of elevation difference, special head requirements, and total friction loss. + �.• (�) (2) (30 TOTAL HEAD-E-- feet - Pump selection I. A pump must be selected to deliver at least 6 gpm (Step A) with at least )`feet of total head (Step B). END PERFORATION OF A PERFORATED LATERAL �Glau COVer Topsoil Layer of Geolglile Fabric for 1a - • Leatny Sand Layer inch loser al hat or draw covered with red roam pope,) - �Perlut lion Drilled 110nronially 1� Info C p Near Top �t-3/i Plus • e `` �,-Al Least 12' to Edge vQLojn Field Races; al )lack Layer -Perlarallons Located of Clean Sand Layer Bullonr of Lateral f Soll Properly Scarified Beenre Piocing Sand Layer TABIX OF PERFORATION DISCI IARGFS IN GIJM Mead Perforation diameter (inches) I 1.0a 0.56 0.74 M 0.69 0.90 2.Ob 11M 1.04 2.5 0.89 1.17 3.0 0.98 1.28 4.0 1.13 1.47 5.0 1.26 1.65 a Use 1.0 foot of head for residential systems. bUse 2.0 feet of head for other establishments Pipe Length Point of Dischargc Elevation Difference P'MP F-18b 1.5 inch 2.0 inch 3.0 inch SPm Friction loss per 100 rt or pips: 10 0.69 0.20 12 0.96 0.28 14 1.28 0.38 16 1.63 • 0.48 18 2.03 0.60 20 2.47 0.73 0.11 25 3.73 1.11 0.16 30 5.23 1.55 0.23 35 7.90 2.06 0.30 40 11.07 2.64 0.39 45 14.73 3.28 0.48 50 3.99 0.58 55 4.76 0.70 60 5.60 0.82 .1 1 3DUd f � 1 . Ztz 1OD r �j�Q �cr iFiK �y 1 � 1 ` ` Ibbn ,I \I F-8 WATER TIGHT U LOCKABLE ELECTRIC BOX---,,, PLUGS OR ELECTRIC CONNECTIONS 1— } 2' PVC CONDUIF SCHEDULE 80 6,SPACE MANHOLE COVER CHAINED R LOCKED SEALED MANHOLE RINGS SEALED TANK PLASTIC ROPE OR CHAIN WITH ANCHOR ALARM FLOAT ON SEPARATE ELECTRICAL CIRCUIT— _ START I EVEN SI — ,r 3° 51-IQT_ OFF_LEvEL_V __,_ -- PUMP CUNT ROL FLOAT UNION TREATED.POST �A x 4 min) ALL ELECTRIC CONNECTIONS MADE INSIDE BOX LOOP OF POWER CORD FOR SETTLEMENT AT LFAST 12' BELOW GRADE WIRE FROM POWER SUPPLY .PIPE IS LAID ON A UNIFORM SLOPE FROM FOIM PROPER TATIONDRIL TREATMENT AREA -- IF PIPE AT TANK MUST BE LOWER TI IAN UNION. TO GET ELEVATION FOR DRAINBACK, A 1/4 INCH WEEP HOLE MUST BE USED WEEP HOLE NO ES: ELECTRICAL WIRE FROM POWER SUPPLY MUST NOT RUN OVER ANY TANKS BUT MUST BE LAID BESIDE OTHER TANKS AND MUST BE PLACED IN CONDUIT ALONG POST ELECTRICAL CORDS FROM PUMP AND FLOAT5 MUST BE RUN THROUGH C014DUIT WIRES CANNOT HAVE GROUND CONTACT. E--3 �[z Ld W Off' (Owrl- CC O i .��f' In Q WW a j+h .w�\ d il? i \ Lu ' r\ ,, 1140 toad' � ��` '�1 gin. ` \ ��M �f `'Ij f �•xr ;�It{��:.i �li�' �, �; �� Avis IK) rsil:� ca ,t 0 CL 0 LOO LL CL Zcorn LLJ D I LLj d-wR IZ N O> \"1aC J 1 0 LL Q 4� �w a Q [L v O JIL.2(D \ W I- D-L Eli (Di .t- U)r 4- 0 a .0 t� 0 _._! 0 LO 0 0 Li o 0 0 �— Nfb -. 0 LO w E w Z7 E 0 "0 C).-C)0 -C L L � Vy C fn 1- •- ._.... o Q V� .0 a) E Q to .� Q' C V Q. E ..,� X t _ Q3 C 4) O �- 7 tn 4-2 Cl. L �C �L �" 0 . Q.-O `— .0 a �.. _.. O -0 . _... � V 4-- C cnU tnp � ,c(5ca)(u(uC LO E� C'JOO.�.3� cu v -o •... �.,. cv " 4— . o+- U L-.r- .- o 4 � o-a a0 0 � C c Q to (n %..o m (L � Test Yule iucaLioltWe '�' r • , f ` r Date WE Yule was I,r �1, it ed �� .%r. , Depth of hule bottom,_ (r, ittches. Diameter uC Mule, {t` Riches. Soil data from test Yule Uel►Llt, Inch,!s Soil texture h 1leLhud of scrstLching sJ-dewali r� Del,Lli of p,-a-sized gravel 10 buLLum of hole, � incites, D-It-e and Ilur.rr of 111.1t.-I ni wa:;Ler filling (,r � ' � � 1_ , Depth of inlL I.al wute�r I: I.J.lirr�� Inches above hole IJuLLUIIt, HeLhud used to mainLn i nr It least 12 incites of water depth A stole for at least 4 huurs* { j -- —----�- , Fercol.aLiun Lest tread i irks mtide b t Y _�• ,11� r E� f 1 i ��, oil _ � ram' _start i.rrg aL U:.�'c7 't'rr'.Y . Iletxltnum water de rtlr above itule boLkc� (elate) �L). i during Lest:, Inches. T.Lme Time Interval, rl uLes Hausuremeut, Whee Percolation Urup in water.' rate, Remarks level, iuel►es trrluuLes per Inch Fercalatlun rate = . urlttutes7 per inch. i i�i..,'./iJLY�i1'iJ(�I lli.y.i, il!►11► JlILL1, Test hole l.ocaLlc,il•.. f •04 hole number UaLe test mole was j,r.epared �n-!r` Diameter of hole,, Depth of Bole bottom, inches. (lnclies. Soil, data from test hole: UepLh, inches —1 3� Hethod of scratchillp sidewall Soil, texture Depth of pea -sized gunvel. in boLLom of hole, Inches. Date and hour of litiL I.n.L water filling . a Depth of iultial water filling, r �,�. I luches above hole bottom. 4 hours" used to nrzjJnLal a at least{ 12 .inches of water depth In hole for at least 4 ours• _ ' N h. IC._tA_ P_ i ! Perc:ol.atlort Lest readiligs made byj Oil �� a starL.i.ng at _ U :; ��� a. II p}axlnturn water de,Lh above F�ole (dat'e) i`trl �' l bolt during Lest, inches. Time Time LIILerval, Ilelsuremeitt Minutes inches Drop in water level, iuclles Percolation rate, Minutes per inch Percolation rate snlnuLes per 1.11C11. Remarks � '.e4'.'JVJAk4 AAjii A. c.J.i. 1J14iAj bIIP,L' x 'rest pule location J`'=:' ��,s'. .., lfole uwnber Date Lest hole was ti-e pared } ej (n f'c 1 , Depth of hole boL'tum, (. ' inches. Diameter of hole, ( incites. Soil data from Lest- hole: Depth, inches Soil texture HeLhod of scratcl'tnp sidewall Depth of vea—sized gravel ill boLLom of Bole, ittclies. Date and hour of inlL ia1 waLer fillitig I, A, mo j D DepLh of J.uiLial water iJ.11ing, -_�,a•• __ i'lches above bole bottom. Method used to mainLa.lit at least 12- inches of water depth ill hole for at least 4 flours PerculaLlou Lest readings made by sLarL.iiib at _ U Lso a.Oil Maxiniunwater i wtdel pLh above hole buLL(I � {date) .lilW: � during test, inches. Time ;Ime .i.riLerval, Heasureme:tit, llnutes I incites Drug ltt water level, incites PercolaL-lun rate, minutes per inch PerculaLion rate � J. minuLes per inch. Remarks A.Vii -LL .JA VAkIfy :7iil,bi Test hole Iocatiott I ,d'� �+ 11ILI I(] I 1111FUL Bate Lest (tole was pt.eltared f1) , Depth of hole bottom, y Diameter of hole, (0- inches. iucltes. Soil daL•a frotn test hole: Depth, inches Soil texture ON (C> _. HeLhod of scratchlrig sldewall Depth of Pea -sized gravel lit bvLtom of hole, incites . Date and (tour of 1n1L i_tt1 water filling Depth of iultial wgl-et: filling, inches above hole bottom. Hethod used to utaitttt1.111 at least 12 iucltes of water depth it' hole for at least �i Itvurs '1 Pet:cul.aLlvtt LesL readings made by y , oil ��� LI� sLaCl_ Cug at U ='�;r� a.tu. Haxinjutn water depth above hole butte (dale) �Ntit: ��' I during test, 41, inches. Time Time DiLerVal, t1111ULes NMI tleasurement, Urop in water Inches level, inches Percolation rate, minutes per inch Percolation rate - �� --��.-� miuuL•es per inch. Remarks TPsL hole I-vcallvll 0, ).s l,_ (f�4: .,., hole number ��ti DaLe Lest hole was - rared 11 p� + l l �r _ , Depth of hole bvtLom,�6, inches. Diameter vC Rule, inches. 5ull data frum LeaL hole: Depth, illLhe..; Soil texture t1eL1I`d of scl:aLchlllF;-.Idewall r UepLL of pt!a--sized gravel in botLuln of Ilvle, � inches. Date and hour of 11til- 1 :i-1. water I11.1141g (� . a n UepLh of illltial water f.1.111ng, � j.. Inches above Mule boLLUIn. HeLhud used Lv nl,illlLaht aL leasL{ 1"1_ lllciles of wnLei: depth ill hale for aL least li hours Perculatlutl LeyL Vearl i ngs ninde by Oil star[ 113E; Fit tiaxlmuin water: de rLh above (role boLty WaLe) 1 during Lest, illelles, .r Ime Time lnLerval, t1l.uutes Ileasuremerit , Inches Orup Ill water level, inclles Percolation rate, minutes per inch PercvlaL-lon raLe - nlinuLes per 1.1jell. Remarks Test hole locat-Ault Hole dumber JT Date Lest hole was pl ,.•pared `a (ki")ItV Depth of hole buLL0111, incites. Diameter of Yule, („ incites. Sall data [roil] Legs: hale, Depth, Inchir!g Soil texture a _ o IleLhud uC geritci]ltlj; :;!-ciewail Uejol ll ui Ima--sized gravel ill buLLulir of hole, inches. UaLe and hivur of InIL I n.L water fiLlIlig (', a CS of L]tit.lrtl wraLer f I -fling, ;.• inches above hole botLu]n. HeLhud used to aL least lZ Itrches of water depth Ill hole fur at least 11 hours_ Verculation Lest read.iirks made by } �.1,1 r ] ��• start. Lill; at Ilaxlu]u]]t writer de rtl] above (elate) i e Rule bull c+ during test, inches. Time Time .I-nte]:val, i-ilnutes Measurement, .inches Urup ill water level, incites Yerculatiun rate, a]inuL-es per inch perculatiun rate = - 2 - uliltutes per inch. Remarks ' ^ . PERCULATION TEST and Mound System Design For Bob Voronyak 1425 Bay Ridge Rd Wayzata MN 55391 Site Location: 1425 Bay Ridge Rd Wayzata MN 55391 Orono Zoning R & D Soil ConsultantS 11585 11f"th St. Cologne, MN 55322 (612) 486-2667 M.P.C.A. Certification #758 November 19, 1992 November 19, 1992 Bob Voronyak 1435 Bay Ridges Rd Wayzata MN 55391 RE-.,, Sept i. c sysst ei-pr design and pfe-rcol at:i1_m tests for; MinnescA,Fk F`ollUti.,:.,n Cont•rr.;l. Agency wit at e Certification 44-7:58 Secondary site of 1425 Bay Ridge foci Wayzata MN 755 391 Orono ronin(g We were retained by Mr. VorotiyaW: to provide criteria for the design and installation of an indi.vidk.kal sanitc-kry sewage treatment system to hancilen, the sewage flow teener: -Aged by water—usor aprAiarir.:ti:s within a single, family dwr-11ing. Procedure A total of three (":3 Soi.l percolatic�n tests were performed on November~ C„ 1992 at a repressntative areas to th+_ west of tale dwel 1 i ng „ In addition, thre-e- (3) soil borings were drilled with a i.d. x 3 1/4" ,n.d. Hand auger to Check for the position of the ground water table and to identify they underlying sail types. l..ocation c-f i:a?ast;s c'rrld borings ��re shown on the site plan. The percolation tests were performed in ac:• ordanc:e with the provisi cin s of "Minnesota Pollution Control Age3n-::y Rujj-,- 'a c:1F1+::1 Standards Chapter 70BO." They percolation tests Fiol.es were:: drilled to a alternate moUnd depth of 12 inches with a:k L;" i.d. x Via" o, d. at..iger. . Two incof pe a, gravel were pl..�-%ced in .the- bottiom of e_ae_I'r hole_• to 1::rrevent scoring. Water was then added to the test holes and replenished as necessary, frlaintairlip-g a 12--inch head of water OvOr the br..tittc-im. After a F:)erie�d of saturation, each hole was refilled to a 12--inch Head of water over the Llr:,ttomr avid the per=olation tests commericed. Voronyak November 19, 1992 Page 2 Percolation Test Results ------------------------- Results of percolation tests at holes P-1,P-2, and P-3 are shown as observed. Percolation rates in minutes per inch are indicated as shown below: P-1 hole P-2 hole P-3 hole 30 mpi 31 mpi 31 mpi Secondary Site 31 mpi Soil Borings (Secondary site) B-1 B-2 Black sandy loam () - 16" Mack sandy loam 0 - 14', Lt. brown sandy clay 16" 36" Lt. brown sandy lay 14" 36" Sandy loam 36" - 45" Sandy clay 36" 48" Yellow clay loam 45" 60" Yellow clay 48" 60" Mottling at 30" Mottling at 36" Black clay loam sandy 0 12" Lt. brown sandy loam 12" - 30" Sandy clay Yellow clay Mottling at 32" 30" 40" 40" 6V" Bo6 Voronyak The contents of this site evaluation are to be applied to the property listed --reprints for other application only with the pc-rri-dsrision of Donald Schneewind. The soil conditions have t.2een established at the test hole locations only. There may be variations in soil ootratigraphy between and around the borings, and interpolation and extrapolation of the results is not All requirements of this design shall be followed in order for the system to perform up to the designed capabilitio*s. References Home Sewage treatment University of Minnesota Agriculture Extension Service Roger E. Machwier Extension Engineer And Orono City System Ordinence and Minnesota Pollution Control Agency RuleS and Standards Chapter 7460 If you should have questions or need further information, you can contact staffat City of Orono(zoning) or me at your convenience. I � t r i ,,•np ipe�jL� � t �► �j lk . it • ilk I V' • PL Y IT T a • J 1 8a70GiT r coRo AD �Q TFf4 _~•�yr. y �tf l •'3 S.1 Jb vn e I r. T LA ca la) A y D1 T h j. r C!Pl } !� �41 Iry o' PERCOLATION TEST DATA SKEET 'l�:L est !rule location�`��} Eli- I ;t 'kllole number 1 6cd''- � -- Date Lest [tole was Prepared j 1tr , Deptit of hole boLtam,_- ( inches. Diameter of hole, �, inches. Soil data from Lest hole., DepLlt, inches Soil texture Method of scratchittu sidewall Depth of pea -sized gravel ill bottom of hole, inches. Date and hour of iniL.Lal water filling ?0. Q Depth of lultial waLer filling, ; inches above hole bottom. Method used to maintain at least 12 hiclies of water depth in. hole for at least 4 hoursF r' to A- 4�; PerculaLiott Lest readings made bytic ` oty (date) L� V.�,r starting at ' `5 a'r", Maximum water depth above hole botto r:iii:� p - during test, �' inches. _..._m Percolation rate w —� Miturtes per inch. .: +�a'.:+c�iliil iiJii iu.l1 k.it�lll btll,:LL ���� J_ Test mole location Dale test mole was l�1:epared� k,,�. , Depth of hole bottom inches. Diameter of Bole, {, inches. Soil data from Lest hole: Depth, inches jq - -g1�- �_ -0 __ Hethod of scratching sidewall Soil texture Depth of pea --sired gravel .lxa boLLom of hole, - , � inches. Date and Hour of in1L ial water filling , 3 Depth of initial Mer filling, �}, - inches above hole bottom. Method used to maintain at least- 12 inches of waiver depth in hole for at least 0 $ huursA-/ Percolation) Lest readiugs made by � 1.,1 ,i" . ,•• � r lL.1 � on st:arL.i.ng at W. a.m. ' r, iiti: tiaxinnunt water del, th above (tole Otto (date) 1 during test, inches. Time Time Interval, fhasurement, minutes I inches Drop in wafer level, inches Percolation rate, minutes per inch Percolation rate e minutes per i11c11. Remarks 0 k Ja,i, 4JJi iJ. yv4* ilJ ly� If��Ri• L1ri1J �.i )c4;Imsl,Jafi 6A.j 'lest (role locatiotl hole ltumber �� — DaLe test hole was pi_epared n�rt , llepLlt of bole bULLoin ,�(.�_incites. Diameter of Bole, (, incites. Soil data ,from test hole., Depth, inches Soil texture kleLltud of .9craLchJ.11p, sldewall - DepLh of pea -sized gravel in botLotii of hole, inches. Date and 11uur of iniL Lal water fillittg DepLlt of itiltiai water 0.11111g, inches above hole botLoitt. Hethud used to niaitlLa f.it at least 12 Inches of water depllt iu hole for at least 4 h u u r 9 - ^1 e PerCOIALlott LesL readings made by L LLII� aLar1 Lng aL U '�,� A. Oil Maximum water de,Lli above hole bottu (date) } during Lest, inches. Percolation rate �! -. minutes per inc11. 05/12/93 15:33 FAX 612 339 1529 NAHONEYDOUGHERTY Q 002 AFFIDAVIT OY ROBERT VOROWy,K STATE OF MINNESOTA. ) ) ss _ COUNTY OF Ili MT.1-T ) ROBERT VORONYM, being duly Sworn, states as follows: 1. I3e is the applicant for Land Use Application. #1B05 regarding 14a? say Ridge Road, in the city of Orono, County ❑t Hennepin, State of Minnesota. a. Affiant's fiancee, Seth Ann Campbell, is the equitable owner of 1425 Hay Ridge Road as vendee under a contract for deed with Roy E. Ahern and Nancy A. Ahern, as vendors, and the owner of an option to purchase 1407 Hay Ridge Road from Roy E_ Ahern. 3. As part of the procedure for having Land Use Application 41805 considered and granted, Affient has taken a survey/proposed site plan and ,proposed building plans for the proposed improvement and use of 1407 Bay Ridge Road to ROy E. Ahern and Nancy A. Ahern,. 4. Affiant has visited Mr. Ahern on three occasions, twice in the months of January through February 1993 and again an May 7, 1993. On one or more of those occasions, Affiant has discussed the proposed improvement and use of 1.407 Bay Ridge Road with h1m and has left with Mr. Ahern a copy of the survey/proposed site plan. 5. In Spite of numerous requests by Affiant, Mr. Ahern has refused to sign the "Adjacent Property Owners' Acknowledgment Form." 5. Mr, Ahern has stated to Affiant that he will not s:.gn the "Adjacent Property owners' Acknowledgment Form'+ Mess Affiant's -1- 06/12/93 15:33 FAX 612 339 1329 NAHONEYDOUGRBRTY 9 003 fiancee agrees to amend the contract for deed concerning 1425 Hay Ridge Road. 7. Affiant's fiancde's option to purchase 1407 Bay Ridge Road will expire in late amine 1993 and your Affiant has been informed and believes that Mr. Ahern has another buyer interested In purchasing both 1407 and 1425 Bay Ridge Road, and for that reason, wishes to prevent Affiant from obtaining the variance requested in Land Use Application #1805 so as to effectively prevent Affia,n,t's fiancee from successfully exercising her option to purchase 1407 Bay Ridge Road. 8. Affiant submits this Affidavit for the purpose of satisfying the requirement of proof that Roy E. Ahern and/or Nancy A. Ahern have reviewed the plans for the proposed improvement and use of 1407 Bay Ridge Road. FURTHER AFFIMT SATTH NOT. Subscribed and sworn to before me this _ _ day of May. 1993. Notary Public -2- Robert Voronyak 14 1. ` 4'1 V .HIV TELECOPY COVER LETTER Please deliver the following page(s) to: Name: From: Total number of pages letter. Date: 1,5 ~ / a Is - . including this cover IF YOU DO NOT RECEIVE ALL THE PAGES, PLEASE CALL US AS SOON AS POSSIBLE. Phone: (612) 473-7358 and ask for: 6� Our telecopy number is: (612) 473--0510 Additional Message: