Loading...
HomeMy WebLinkAbout1983-08-11 Letter, Appraisal of Easement ValueAAA-.--N CITY of ORONO I'li,1 Office :k,x 660('rystal Hay, Minnesota 5432:I*Municipal Offices On the North Shore of lake Minnetonka August 11, 1983 Mr. Thomas H. Rutten Bassford, Heckt, Lockhart 6 Mullin, P.A. 1520 Pillsbury Center Minneapolis, MN 55402 Re: Paul Smith Sewer - 2477 Dunwoody Avenue, Orono Dear Mr. Rutten: Attached is your copy of an appraisal report prepared by Peter J. Patchin s Associates for the proposed sewer a-d water utility easement to serve the Paul Smith property. You will note three options: Plan A: The easement as per the engineer's feasibility study: $4,360. Plan B: Same easement as "A" except does not abut lakeshor.e: $1,656. Plan C: Easement under existing access easement. Requires additional construction costs: $280. The City Engineer is calculating estimated differences in construction costs depending upon which easement is preferred. I will provide those costs to you as soon as they are available. I would expect that you will again be contacting the Powers to attempt a private easement agreement. They still own both properties but they now reside in the former Tobin house on she south side of the easement rather than in the old house to the north. I also understand that they will be out of town until August 22nd or so. • BUILUINC& luxl\(, 47, 1357 0 AUNI%ISIkAlION & I I%AN( 1 473'358 i ►I BLIC %0ItKS 47)'1514 ASSFSSIM. Mr. Thomas Rutten Re: 2477 Dunwoody Avenue August 11, 1983 Page 2 Failing an agreement between Smith and Powers, the City Council will likely choose to proceed with a public project to condemn the easement and install the service. I would hope that your negotiations are successful so that the extra costs of a City project can yet be avoided and so that the actual construction can be completed before winter. Sinc re 40 r� Alan P. Olson City Planner Enclosure cc: Bruce D. Malkerson, City Attorney Walter R. Benson, City Administrator