Loading...
HomeMy WebLinkAbout2765 Casco Point Road - Point Of Sale Inspection - CompliantTask # 92869 �aN0 Date Called in Date Scheduled 4 04 25 1pm Reinspected Repair 4-28-2025 City Of Orono Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form Property Address: 2765 Casco Point Road PID: Owner Information Name: Janet Putnam Tim - Realtor Mailing Address: (if different from Property) 2940 Pelican Point Court 612-2754205 Mound, MN 55364 Phone: Email: rp55391@gmail.com Inspector Information Name: Company/ Organization City of Orono License number: Phone: 952-2 9- 86 Email: Ins ection System Standard Pass Fail Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary sewer but should discharge to the ground outside of a building. If the roof / drains are connected to the sanitary sewer, disconnect them, plug any open v connections to the sanitary sewer using a non -shrink permanent material, and redirect the roof drains onto the ground outside the building. Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump system includes drain tile, a sump pit, a sump pump, a float or switch, and a drain line. Sump pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (1/I) Compliance Inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and specifications. (Details on back of this sheet) Notes, 4.28-25 Replaced a section with roughly 4' of 4" sch 40 PVC & slip lined 3 1/2'. Also installed a 4" Cleanout - Jimmy Nelson Task # 94494 Toilet Removed o Yes o No For Inspection: Ins ectors Signature: Date: Owners Signature: Date: City Review � Com liant ❑ Corrective Action Re uit•ed Certificate of Compliance Expires: 4-2&2035 Corrective AQtion Due by: Date: 4-28-2025 Signature: Name: Heather Smieja