HomeMy WebLinkAbout2232 Shadywood Road - Building Plans: ResidentialReviewed for Code Compliance
Nicole Post
RPS24-000008
3-11-24
Additional permits required:
Plumbing
Mechanical
Electrical
Sewer
Stamped and
approved plans
must be on site
for the duration
of the project
and all
inspections.
To schedule
inspections call:
952-249-4613
Please have the
permit number and
street address ready
at time of call.
Please plan accordingly. The City will not issue a
Temporary Certificate of Occupancy (Temp CO) for new
homes during the growing season from May 1st to
November 1st. Issuance of a Certificate of Occupancy
requires all permits associated with the project to be finaled
and an as-built survey approved by the City. If vegetation
is not fully established at the time of CO issuance, the
erosion control escrow will continue to be held.
Enclosed
space under
stairs shall
have walls
and
under-stair
surface
enclosed with
1/2" gypsum
board Per
MNRC
R302.7
Provide fire blocking
vertically at ceilings and
floors, and horizontally
at intervals not
exceeding 10'.
Drain to daylight.
Mechanical Ventilation
Required In all Toilet Rooms
Unprotected portions of floor
shall not exceed 80 Sq Ft.
3 Studs
Beam calcs
show this as a
2(18") LVL
Per MNF&G 505.4 Hoods
exhausting in excess of
400cfm must provide heated
makeup air at a rate approx
equal to exhaust air rate
3(9 1/2)LSL
2(7.25)LSL
3(18) LVL
2(11.875) LSL
2(7.25) LSL
3(18) LVLBeam sizes transferred
from beam calcs. NE
Tempered window required
This is a ceiling
Min R-49
If heating the
garage -This is a
ceiling - Min R-49