Loading...
HomeMy WebLinkAbout2232 Shadywood Road - Building Plans: ResidentialReviewed for Code Compliance Nicole Post RPS24-000008 3-11-24 Additional permits required: Plumbing Mechanical Electrical Sewer Stamped and approved plans must be on site for the duration of the project and all inspections. To schedule inspections call: 952-249-4613 Please have the permit number and street address ready at time of call. Please plan accordingly. The City will not issue a Temporary Certificate of Occupancy (Temp CO) for new homes during the growing season from May 1st to November 1st. Issuance of a Certificate of Occupancy requires all permits associated with the project to be finaled and an as-built survey approved by the City. If vegetation is not fully established at the time of CO issuance, the erosion control escrow will continue to be held. Enclosed space under stairs shall have walls and under-stair surface enclosed with 1/2" gypsum board Per MNRC R302.7 Provide fire blocking vertically at ceilings and floors, and horizontally at intervals not exceeding 10'. Drain to daylight. Mechanical Ventilation Required In all Toilet Rooms Unprotected portions of floor shall not exceed 80 Sq Ft. 3 Studs Beam calcs show this as a 2(18") LVL Per MNF&G 505.4 Hoods exhausting in excess of 400cfm must provide heated makeup air at a rate approx equal to exhaust air rate 3(9 1/2)LSL 2(7.25)LSL 3(18) LVL 2(11.875) LSL 2(7.25) LSL 3(18) LVLBeam sizes transferred from beam calcs. NE Tempered window required This is a ceiling Min R-49 If heating the garage -This is a ceiling - Min R-49