SYSTEM DESIGN <br />FOR GARY RODERICK <br />LOT 7, BLOCK 1, RINGERSWOOD <br />ORONO, MINNESOTA <br />5-20-85 <br />1. Percolation Rate, Ty,<, J System. <br />Percolation tests were. taken previously by others. ltwever, the proposed <br />house is on the primary si-Lie' tested earlier. Thus, we took new percolation <br />tests for a primary site and had an average percolation rate of 25.2 M.P.I. <br />but a high water table re:uiring a mound system. Tests were done at an 18" <br />depth because these upper layers would be used for the proposed mound <br />syste. The old alternate site should still be preserved for possible future <br />use. <br />2. Proposed Flow Rate. <br />4 bedrooms @ 150 G.P.D. is 600 G.P.D. <br />3. Soil Treatment Area Needed. <br />600 G.P.D. x 0.83 factor is 500 Sq. Ft. of rock bed area. or a bed 10 feet <br />wide by 50 feet long. <br />4. Septic Tanks and Distribution System. <br />Two septic tanks of 1000 gallons each are recommended. In addition, a third <br />pumping tank will be seeded to house the pump required for pressure dis- <br />tribution to the mound area. Distribution to the rock bed is to be through <br />3 perforated laterals 40" apart. All construction and materials should <br />adhere to the provisions of the city o' Orono. <br />5. Mound Dimensions. <br />(Ise a 2.67 factor x 10 feet of rock bed width or 26.7 feet for the basal <br />width. Since the ground slope is between 1.5 to 2.5 %, both the upslope and <br />downs!ope areas can be used. % wever, with a 3 foot high mound and 4:1 <br />sideslopes, the total width would oe 10 feet for the bed plus 11 fcet <br />upslope and 13 feet downslope or 34 feet which should be used rather than <br />the 26.7 feet. <br />If there are any other questions, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />Mark S. Gronberg, P.E. <br />