Loading...
HomeMy WebLinkAbout1993-07-07 Contractor Letter, Updating Septic DesignSSOCIATES ENGINEERS & LAND SURVEYORS, INC. July 7, 1993 Mr. Steve Weekman City of Orono P. O. Box 66 Crystal Bay; MN 55323 RE: Cheyenne Builders Our Job No. 93320 Dear Steve: • I �C—rwl a no Enclosed is a revised copy of our site evaluation for Cheyenne Builders on Lot 6, Block 1, RINGERSWOOD. As per your comments, we have changed the size of the perforations from 1/4 inch to 7/32 inch in the mound laterals. This drops the pump to output at least 42 G.P.M. As per the unusually slow per rates for these soils, our crew encountered a saturated condition on both the primary and alternate sites. This saturation I believe is due to the extremely wet year we are having and that the testing was done after a period of heavy rains. If you have any questions, please feel free to contact my office. Sincerely 1 Edward J. Otto, res. Otto Associates, Inc. EJO/md Encls. cc: Cheyenne Builders 9 WEST DIVISION STREET - BUFFALO, MINN. 55313 - (612) 682-4727