My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-01-09 On Site Sewage Treatment Inspection Report
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
755 Dickey Lake Drive- 34-118-23-22-0009
>
Septic
>
1987-01-09 On Site Sewage Treatment Inspection Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2025 12:23:48 PM
Creation date
9/18/2025 12:21:43 PM
Metadata
Fields
Template:
x Address Old
House Number
755
Street Name
Dickey Lake
Street Type
Drive
Address
755 Divkey Lake Drive
PIN
3411823220009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On the North Shore of <br />ON -SITE SEWAGE TREATMENT fake Minnetonka <br />INSPECTION REPORT POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER _ 13Wts Fnt4s1,etc _ ADDRESS _ 2 S 0k(..I1cE'yLAWE 6&k,� <br />PERMIT NO.'S. 70 7 b DATES - 2'U - 153 CONTRACTORS W ,jDW�tik C aX-, <br />City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sewage <br />vestment system at the above address has been inspected and appears to fall into the category checked below. <br />(This is ❑ an existing system new construction) <br />®� Meets or nx cads current City standards in all respects relating to desryn, construction, and location. Appears to be operating <br />properly. <br />El2 Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, <br />located, and constructed generally in accordance with previous codes. System appears to be functioning xoperly: no major <br />upgrading of the system is required at this time. <br />El3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading o1 s,l, tem is required at <br />this time. <br />Q4 System may or may not meet current City standards for design, construction or location, but is fading to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system repair/ <br />replacement procedures. If drainfieid replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CUNDITION ( [A Checked items may reou:re � our action) <br />Tank inspection indicates. <br />❑ Pumpout not needed at tt time. <br />❑ Solids accumulation in tanks indicateq shouir' tie pump - <br />ad out this year to help prevent future pro <br />❑ Solids accumulation in tanks is at a critical ,avel. Tanks <br />should be pumped out as r)on as ,KmitAe. <br />❑ System is discharging to surface. Tanks must :is pumped <br />within 48 hours to eliminate surface discharge. <br />❑ Inspection risers missing -tanks could not be inspected. <br />Inspection risers (4" die. pipet ^lust be installed in each tank <br />at next pumpout. If tanks have not been pumped out within <br />the last three years, they should be pumped out now. <br />!fl Inspection pipe is located directly over tank baffle. (Does not <br />`give accurate measurement of solids accumulation.) If tanks <br />hsve not teen pumped out within the last three yetis, t <br />should be pumped out now. <br />Drainfield inspection indicates <br />Drainfield is dry, no surfacing evident. <br />Some evidence of surfacing, not critical t. <br />❑ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace <br />ment or additions to dramfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />❑ Drainfield extent and condition unknown. <br />SITE CHARACTERISTICS <br />Limiting Site Factors <br />(_J Slope <br />Potential for System Failure <br />Site Capabilities for <br />❑ Soil <br />(depends on soil types, water <br />Future Expansion <br />i&High water table <br />table, and system condition) <br />i-Low <br />ALAdequate <br />❑ Lot size <br />❑ Medium <br />❑ Fair <br />❑ Poor <br />❑ Lake, wetland, or stream <br />❑ High <br />❑ Inadequate <br />❑ Drains" <br />❑ System is causing visible <br />surface discharge. <br />COMMENTS —--_-_--__-- - <br />Date ofln -----. --- Inspection icSystem Inspector <br />Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that <br />this repot do" not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the adequacy <br />Of the system under current conditions based on the available information <br />This report must be kept � • the premises with system location and pumping records <br />WHITE COPY / Insp' ctor's F lie GOLD COPY /Homeowner <br />
The URL can be used to link to this page
Your browser does not support the video tag.