Loading...
HomeMy WebLinkAbout1985-01-06 Septic System Design ReportSYSTEM DESIGN FOR B b N CORPORATT^'1 LOT 4, BLOCK 2, RINGERSWOOD ORONO, MINNESOTA 1-6-Pq 1. Percolation Rate, Type of System. Percolation tests and soil rings were taken by others. From informa- tion supplied, the primary site had an average percolation rate of 107 MPI, and a possible high water table at 1.2 feet. Thus, a pressure MO add system according to basal width will be needed. 2. Proposed Flow Rate. pr�posed bedrooms @ 150 GPD is 600 GPD. 3. Soil Treatment Area Needed. 600 GPD x 0.83 factor is 500 Sq. r;.. of rock bed area or i bed 10 feet wide by 50 feet long. 4. Septic Tanks and Distribution System. Two septic tanks of 1000 gallons each are recommended. Also, a third humping tank will be needed to house the pump required for pressure distribution to the mound area. Distribution to the rock bed is to be through 3 perforated laterals 40" apart. All construction and materials should adhere to the provisions of the City of Orono. 5. Mound Dimensions. For a percolation rate between 61-120 MPI a factor of 5.00 is used resulting in a basal width rf 5.OU x the rock bed width .f 10 feet or 50 feet. Since the ground slope is from 0-3% both the downslope and upslope can be used for this width. Because of the high possible water table, a 2 foot layer of clean sand will be needed under the mound, with the total height of the mound being 4 feet. Thus,since the slopes have to extend out about 20 feet from each side to get the required basal width, the sideslopes would be about 5:1 which would be better than the 3:1 required mininum. Sincerely, PERCOR, INC. Mark S. Gronberg, P.E. #615 Rinyer Si1xli• i-slOn *age 3 v y.+Oci,E>nQ nQ U O O� �� C1 (-1 V' v Ai s s W N CJ d U U r, O � Ol u u 4J u i ; 3 $4 O 0 O O �► ro ro w o 0 14 fn c fnn o r4 a -4 >1 ai m A ro rn E m v 44 a+ W LF' 44 W `' W t � '� m N 1n u1 O Ln �+ 41 O .•1 N to r4 O 0 JJ U E �.� 3 b ro ae ae �e ae � a1 � ai u N N W m -4 LA .4 toW O O 1O �D C •1 A 3 A V 10 41 O .01 7 d ro O.[ y 0 b 41 H co m O ..1 >1 m ro N •� A ro (n t go to O >1 'O .-1 0 O .14 -A -4 .1 O � E E E uro1 to C O 41 •.4 to 41 O Q1 M r N ID 'd Ln = Q N troi r>0 0 Ci A u ►•i o>4J 4)m r0 rn$ o a� ,, au.roio0 A++ 41 u >, a n m a1 A.Oi rou 41 u O w cn 41 0 • 4i 14 ^7 � � G 44 O U m N _4 w V of O > +' O n ro v 0 r rJ u E m ­4 .4 m 0 o a) g d d ►ui A C1 w 0 41 41 41 u u O O .•� .-� ro m a+ Ca q m .� ami h 6 'd iJ ro ro 41 N y G 0 7 ►� D N C :3 Ooo u� N Q u a+ u Q E 4 RC 3 a i_ A 615 F,age Ringer Subdivision 5 � J Lot 6. Block 1 63 Avera e pert Peres 1'B61 thru PB66. Borings BB61 thruSloBB 9 - rates at both sites are acceptable. roximatel es r2n4efeetm with 1 to 4�. }' Mottling started at a depth of app Y .5 to 4.4'. A standard mound system actual water level at ? should be used at both sites. Lot 7, Block 1 Peres PB71 thru PB76. Borings BB71 thru BB73. Slopes average 2-38. Perc rates were fairly slow, with the secondary site being somewhat slower than the limit (however, the justification for Lot 5, Block 1 also applies here). 4ctual water level ranged from 1.7 to 3.5' with mottling generally below 2.5'. A standard mound is recommended for both sites. Lot 1, Block 2 Peres PA11 thru PA18. Borings BAll t)lru BA13. Slopes are very flat. Mottling was indicated below 2.2 ' with actual water encountered below 2.0'. :wo secondary sites were tasted. All sites are acceptable for a standard mound system. Lot 2, Block 2 Peres PA21 thru PA26. Borings DA21 thru DA23. Very flat slopes. Mottling occurs at 2.0 to 2.4' with actual water encountered below 2.41. Perc rates on both sites are acceptable. A mo•ind system is recommended for both sites. Lot 3, Block 2 Peres PA31 thru PA36. Borings BA31 thru BA33. Slopes averaged 2 to 5%. Mottling starts at a depth of 2.0-3.51. Actual water luvel was below 2.5'. Perc rates are acceptable. Mound systems are recommended for both sites. Lot 4, Block 2 Peres PA41 thru PA46. Borings DA41 !-hru DA43. Slopes are very flat. Mottling generally was found below 2.0', with actual water level at about 4.01. Perc rate for primary site is acceptable; pert rate for se—ndary site is slightly slow but acceptable for a mount: t--used :)n the justification referred to for Lot 5, Block 1. 1 recommend a mound system for both sites. Lot 5, Block 2 =rNRL Lc,r ZPeres PA51 thru PA56. Borings Y5lP'thOru BA53. Slopes are very flat. Mottling occurred below 1.2 feet with actual water below 4.0 feet. Perc rates are acceptable for the primary site and slightly olov at the secondary site. (Refer to Lot 5, Bloc% 1) This lot has the overall. worst set of p^-colation rates of the di vision. 'However, only two of the Peres .--re taken in the topsoil, the others, two of which were very slow, were at depth. I recommend that a mound system be used -)n this sicc. If peres were re -taken in the topsoil, it is likely they would ljass as (lid nearly all others done in this manner. I %. b- - o, ----200 --- 1 6 1 I' J II 1 I I 11 .wa e• o s O i 6 A:. Ohl% I Pms i i sANO Owbit PAb I al��il • 1 FUt0 is ` 1 r. lwti O �L1 ! I PI►9� mks� �• i i X I I�i I Pg11 tMw PAS ( I II � (� --• oo _N� _=, �/ i � � 1 1 O O O I � t /• .� -Q • i PA14 _ ND o . _ �►11 I � F pm fAV i 0 t1 �PI►Zj j J' Ol►'96O Q Pw�S 1 T• � I 1� ea'►v � • I I �. POND Yar.Vw bo, ►?- IA I Obis owi� n �•. 0.5 A �, Ka it t Z • A� h) 1�1 PA1ti tg11 i its 1, •I� m s•: S�+i ��"-'s!fi�rl�i'p''S�_ =ci: -�-'(; .�a;,,'3 i .,"'it'�",��j�:T��'�tf'i-��+A T� , I I •pd+�Qt+v��h v vc� �v-c� tf-vv'hTJZ7T��i. � �-o vb'� 'l OD m va d7 wrV .p m CD M Qi rim ►v co m r3' m m �p _ (p co m �_ tip in'/- 1 F; wrp s ce aOD I p 0 41 n` �' ��� r 1C �S'94 'S Ia _ CAN .! T c�ro�'v �� a � � itr W vti v-v-vvv•v•vvvaovro-v-ou s f � .� � � a > _» s y s ' �• a� � m co tp � ^'r0r- Nr' - �� JJ J vvbo�V ao vo p o ai o� Do p d 1.4 Z., ,, c-r' utyJ(}t �N _� W N— (A J O Vl P ua ra ,73 a w ti "- O v� Q ;' W N Q� M s 1C r' L ^ i O kit IV do.� 1 s t s AL a = i r. f^ ,f1 7� f ♦ L ,. � � � i I fi to N N ,-� .. r v. o► o� o� a� W N j 01 .v i sp. N T W N u to LA 0 ..a M L �1 i N ^� f 0 (► �` �JI. A. 1 1aj i �+ J i i i N t b a = o � a r • : o 4 L •4 Y T r.. 1p I r r r. , a rf to (j ;dl fig. &J 'r Ir < (J. I I (J 0 (4 i— r to Lo X, r rl Al j LO F) r r Jq In P It r Jr. 17 P3 71 0 Jr b a ap. N P, r-5 CA 0 cp ip 0 LP 7 IP 51 6, 1 r c r r-, p V r C1ir r t0o . a0 ,t r j#A p rc f, p P A ► Ir 9., 1 0 94 ov 0 r 4 41 ;v to At to tm tit 0 • p Ln Jw 40 40 it C 4 Z. C P. r r 10 6F, r IA 0 r P jr A ILI 4 tl 6-1 %. 11 tJ LTt%- I I ,► I V^• °o • op/�95 % 11 . • I . . . W / ' oq � � I��� a s��z � i pv►,6s I �( 2.o Ate. y w a►as I •ur,1$ to i I o • o I ( t pK% �NfO PP.�6AL �L"- L" - J owl, _ ,� 3. W1 twss oA�60- OvAs1S 3 1 s• , s. POND °Ao Q1. !. a►ss.. n o.SAc �Ifesy.. +Il.� �I►ti I e Q vNSI � i '"' � Ne. �- , 2.e A� J I M v I pwiya : o A $ •A� � 1 -. � ` .- �i ■ EXHIBIT November 27, 1981 P.O. Box 209 Wayzata, Minnesota 55391 Mr. Judd Ringer 405 South Willow Drive Long Lake, Minnesota 55356 Dear Mr. Ringer: We have completed a site evaluation for on -site sewage treatment facilities of 15 proposed lots located East of Willow Road and North of Trunk Highway No. 12 in Orono, Minnesota. A location map has been enclosed showing the location of the soil borings and percolation tests. Soil boring logs and percolation test data is also enclosed. The soil boring show a uniformly high water table throughout the area tested. This condition prohibits the installation of conventional soil absorption systems. The gentle slopes and percolation rates encountered indicate that Mound Systems should be satisfactory on these sites. We recomend that the future homes be provided with Mound Systems of soil absorption. Please call if you have any questions. Thank you. Yours very truly, CARL W. BORG, P.E. e CNB:vl cc: Mr. Michael Gaffron City of Orono Ene. 3 copies - Location `lap Sheets 1 - 3 - Soil Borings 1 Sheet Percolation Test Data I li II II.4 I II � It 4 a I I I II L— W—di-- -- too.os — --rna ML SM •d lie �./I NM �Iu it OW I iAVnM► Meng/ 3i I (In 7rnw !rr fAe) /�s t� 4 too. 00 DICKEYS r, wa s.��popl�.► �t�� �f► Auj��► Ga all `Smth lift .rfr5W*oft+dMn I d I � F• _ - ra _too.oa 3 I s I— _ _ IT4 %lp 0. Pima 41966 uili W 1 •r; !r Imo) ,. �a �• r phi �7 I go ♦ axe« if I Xs �• tl� I ... r 2 � I sat• •�s•� - 1 OUTLOT A I s - , >j.r :' �':tJ �� `;« .I Ar A1rM'./Ai►A�I�fi fi✓+•1� -� •ram ,���,u,::;;.::��.. ;tip ��•� \ 1 #615 Ringer Subdivision • Page 7 installed in these limitin have evolved over the last are not allowed: 1) where minutes per inch of water and 2) where the highest k soil layer is less than 3' In most cases, these same which is usually "loamier" amount of effluent. g soils, a set of governing criteria 50 years. Specifically, trench systems the percolation rate is slower than 60 level drop in a percolation test hole; nown water table or indicated saturated below the bottom of the trench. soils have a varying amount of topsoil and will accept and treat a limited The pressure -mound system is designed specifically to use this loamy topsoil layer for effluent treatment and disposal. In brief, a 12-24" layer of sand (placed over the natural roughened topsoil) is fed effluent from a pressure distribution system in an overlying rock bed. The biomat "valve" forms at the rock/ sand interface which is 12-24" above the natural soil. Because of the pressure distribution, an unsaturated air/effluent contact is maintained as treatment occurs in the sand bed. This treated effluent is then dispersed into the topsoil and allowed to move laterally through the topsoil,possibly even past the boundaries of the mound system (yet still below the surface) until it eventually seeps downward or evaporates over a wide area. It would be poor planning for Orono to allow installation of standard trench drainfields in soils which have high-water table characteristics, since many systems likely would eventually fail, as was the case in Medina-Morningside. Since Orono has shown a strict desire to limit the extension of sanitary sewers, it appears reasonable to allow (and, in fact, promote) the use of alternate on -site sewage treatment methods where development pressures persist. Mound systems have been installed over the last 10 to 15 years around the country as an alternative to trenches. In Orono, pressure distribution mounds were first installed in 1978. To date, the City'has 13 pressure mounds in service, with no recorded failures. In my opinion, under specified site conditions, mound systems are a safe, sanitary, reliable method of sewage treatment. #615 Ringer Subdivision Page 6 Lot 6, Block 2 Peres PA61 thru PA66. Borings BA61 thru BA63. Slopes are nearly level. Mottling occurred below 1.5', with actual water encountered below 5.7'. (Note that soil appears saturated below 2.5') Perc rates were acceptable, although � of 6 taken at depth very very slow. Both primary and secondary sites should use mound systems. Lot 1, Block 3 Peres PCll thru PC14. Boring BC11 and BC12. This lot contains an existing house, garage and barn. The existing septic system is unknown and was not located during my routine inspection in July 1981, although no evidence of failure was noted. A future drainfield site has been tested to the south of the house. Average percolation rate is 21 minutes per inch; soil borings indicate soils suited for a shallow trench or mound system, with mottling beginning at a depth of 51. This is the highest elevated point in the entire subdivision and appears to be the only lot possibly suited for a shallow trench system. An attempt should be made to locate the existing system to ensure it is within the lot boundaries, although there is only a•remote possibility that it isn't. Lot 2, Block 3 Peres PC21 thru PC24. Borings BC21 and BC22. This lot contains an existing house and small shed. The existing septic system is unknown and was not located during my inspection last July. No evidence of system failure is noted. While the existing system undoubtedly consists of trenches, soils data provided for a future drainfield site indicates mottling at a 3.5' depth. This indicates that the replacement system, should it ever be necessary, would probably have to be a mound. Percolation rates averaged 56 mpi. It would alto be advisable to locate the existing system to ensure it is within the new lot boundaries. B. Discussion of Mound Systems Since the proposed Ringer subdivision appears to need mound systems throughout, it might be worthwhile to review the conditions which favor use of mound systems over conventional trench systems. As you are aware, a biomat forms at the rock -soil interface in a standard trench system. This biomat acts as a "valve" to slow the downward percolation of septic tank effluent to a rate where the flow is unsaturated, i.e. air in the soil pores is in contact with the percolating effluent. Under these essential conditions, adequate sewage treatment will occur. However, in many soils, either a seasonal saturated condition or extremely fine, impermeable soil texture (or both) tends to eliminate the air/effluent contact and also severely limits the soils capacity to absorb large amounts of effluent. To ensure that a standard trench system is not _ #615 Ringer Subdivision Page 5 Lot 6, Block 1 Peres PB61 thru PB66. Borings BB61 thru BB63. Average perc rates at both sites are acceptable. Slopes range from 2 to 4%. Mottling started at a depth of approximately 2.4 feet, with actual water level at 2.5 to 4.41. A standard mound system should be used at both sites. Lot 7, Block 1 Peres PB71 thru PB76. Borings BB71 thru BB73. Slopes average 2-3%. Pere rates were fairly slow, with the secondary site being somewhat slower than the limit (however, the justification for Lot 5, Block 1 also applies here). Actual water level ranged from 1.7 to 3.5' with mottling generally below 2.5'. A standard mound is recommended for both sites. Lot 1, Block 2 Peres PAll thru PA18. Borings BAll thru BA13. Slopes are very flat. Mottling was indicated below 2.2 ' with actual water encountered below 2.0'. Two secondary sites were tested. All sites are acceptable for a standard mound system. Lot 2, Block 2 Peres PA21 thru PA26. Borings BA21 thru BA23. Very flat slopes. Mottling occurs at 2.0 to 2.4' with actual water encountered below 2.4'. Perc rates on both sites are acceptable. A mound system is recommended for both sites. Lot 3, Block 2 Peres PA31 thru PA36. Borings BA31 thru BA33. Slopes averaged 2 to 5%. Mottling starts at a depth of 2.0-3.5'. Actual water level was below 2.5'. Perc rates are*acceptable. Mound systems are recommended for both sites. Lot 4, Block 2 Peres PA41 thru PA46. Borings BA41 thru BA43. Slopes are very flat. Mottling generally was found below 2.0', with actual water level at about 4.0'. Perc rate for primary site is acceptable; perc rate for secondary site is slightly slow but acceptable for a mound based on the justification referred to for Lot 5, Block 1. I recommend a mound system for both sites. Lot 5, Block 2 F7A/*L `Or y JeLO� Z Peres PA51 thru PA56. Borings BA51 thru BA53. Slopes are very flat. Mottling occurred below 1.2 feet with actual water below 4.0 feet. Perc rates are acceptable for the primary site and slightly slow at the secondary site. (Refer to Lot 5, Block 1) This lot has the overall worst set of percolation rates of the division. 'However, only two of the peres were taken in the topsoil, the others, two of which were very slow, were at depth. I recommend that a mound system be used on this site. If peres were re -taken in the topsoil, it is likely they would pass as did nearly all others done in this manner. #615 Ringer Subdivision Page 4 Lot 2, Block 1 Peres PB21 thru PB26. Borings BB21 thru BB23. Average perc rates for bDth primary and alternate sites are acceptable. Slopes are nearly level at the tested sites, ranging from 0 to 3%. Mottling indicated below 2', with actual wa-_er table at 3.2 to 4.21. A standard mound system should be used due to the presence of shallow saturation zones. Lot 3, Block 1 Peres PB31 thru PB26. Borings BB31 thru BB33. Slopes in the primary site are approximately 6-8%, on a slight flattening Of the 10-12% slopes surrounding it. Borings in the primary site indicate 1 to 2 ' of loamy topsoil over a 6" layer of organic clay topsoil over a plastic sandy clay. Actual water table at the primary site was below 5'. However, the high plasticity indicates a heavy clay that is probably saturated. The secondary site was mottled below 1.5 feet with an actual saturated zone at 1' depth. Coupled with a slope of 10% the secondary site is marginal for a mound system and would require at least 2' of sand base as part of the design. I suggest that a standardpressure mound system be required for both sites with added sand depth for the secondary system. Please note that this lot is the most tenuous in the subdivision in terms of slope and soils consideration for using a mound system. Should a proposed house location encroach on either of the tested sites, careful review and possible additional testing will be needed to ensure that a mound can still be used. The site does not appear capable of supporting any kind of a trench system. Lot 4, Block 1 Peres PB41 thru PB46. Borings '13B41 thru BB43. Slopes average 5% - 7% overall. Borings indicate actual'water table at 4' with mottling at a depth of 3-4' for the primary and 21 at the secondary site. Perc rates were fairly uniform throughout these tested sites. A depression/drainageway to the immediate south of the tested sites must be avoided during construction of the systems. I would recommend a standard pressure mound for both sites. Lot 5, Block 1 Peres PB51 thru PB56. Borings BB51 ,:hru BB53. Slopes are 38 to 6% overall. Mottling at the primar}- site started at 2.7 to 3.5' with actual water table at 3.7 to 5.0'. This site is acceptable for a standard mound system. The alternate site has a perc rate considered too slow for any system by code. However, close scrutiny shows that the Peres were taken at depth in the sandy clay subsoil, not in the topsoil. In general, throughout the entire subdivision the testing done at a depth of 12", in the topsoil, indicates acceptable percolation rates, with testing at 24" or more indicating slower, marginal perc rates. In my opinion, this site is no different than most of the others, and would have an acceptable perc rate if tested at the 12" depth in the sandy loam topsoil. No further'testing should be required; a mound system is recommended. NN, b b m b rt rt rt �rt rt rt rt a m (D N N In A 4l 0 O O 0 • n rtaaaawa (D w H• to �' La bo w to W bo GD ct fD Ea m 0 0 F l< rt 0 0 0 0 ro• N PV x a rt rt rt onmmtr ft a ft 3 (D 0 W W N A N N N w m 0 O N H t-+ O oO 0 m 0 ma N n' M O m 'C M o N7No r• a n H. Cn n En n �D " Ea po ct p. t' FArt m (DPIn m ►rot ( 0 na �iaNb' C rt C n o n o n r 00 o rt rt to C m Al n n 0 a :1 a :3 a o a .. E m• m w m- m Lnm m m (D a a a n In, n n n r• a :' a a n a n a►C n a►C n o m w M (a, rt (D �C �C �C ►C rt o wrt0 mm o w own' aIV ma0 • G' •:� a s Ln N W 10 N O 01 m m= w a rn ► +� o .I co ko ►.• o n n o� a(a rt ratW rt a 1-"2t 1 Ri V to 'o V to m m 0 d m O o O p, L< w w w w w w r• w w w m w N �t a wam~ H ►� rt a rt m m m m "C O (a a rt o �P P to to1 w f+ �P N W IW !••' rA G .'T' O m M m E 0 rat m p' ua'o1 �' (A ON00 00 00 N y M a :Y'' r• 1 1 1 1 1 1 1 1 1 to C 0 (a 0 OD OD to NJ N N N N IQU1 �• 0 a m a o rt O ft O W Ln N NJH NJ hi N W m a rt rt•o rt v+ rt rt M M M M M M M M ht1 M P. cA H+ ( rt rt rt rt rt rt rt rt rt rt o rt rt m n .*Q O rA O \ H m L< O Pi :31 a O a rt w a r a N O O o o m rt n as as as a.a m • m a o G O O ►� :5E "E \* \ a a a * * m rt rt a n n m m n n m m fA En E abed• uotsTnipgng zabuig ST9# rr 5 5 r 5 5 rr rr O * * N F-+ �J O► lJl -P W u r o <o a: c� air m 0 w w tsJ bd to r w r cti r m r to r n �s co rt n a r o r 0 r o r O O 0 O o O H �s-ca w fDw n n n n n n n n n • �f � � '� N N r r � r ►� r � O �C x n 0 �. 0 K N0 �ran aox a ro to tnwro In to cnto Enro cnro M.y toro En rtrrovrt mqK mcon Off aM con con co►r�,+ sn mK lD Cm m �• O O O� O� O� O� 0 3 O� O� H 0 O F �p' V:3 as pa os 0s as pa os 0 a u, a;s aaK a an an an a►, an an PI 0 a o• al< IN a►t IVa►< a►c s►c slc aL< 0) a a m K n K N K ti K n n n rti M lC L< LG �C "G 'LC 'C f(CD oo D m r• s to rf I (D (D �Q a �' O O► � Ir v � w CD N UJ �P t-� IQ1-+ co N F-+ r F-' OD to w %D to N W n ;.J� w fD o mwrtoa no' n W � W U1 -I 0 %D OD of oNCD a lab bbro too lava lab rob bro lab rob rtn C •P a r• w w w w w w r- w w r r w w r w w m n rt n 0 , aaa� w rt N c r A N r W N LA)Fl W N �P N •P N W N W N oh F M m tr rt O rt(DO r 00 000 N N nJ LA ON CD-P 00 00 b Ir g (D (D O rt (D 1 1 N N I I I N N N 1 N W I N -P I W ON I I lJ O I I r ON 1 1 N W I I W W as r (D O M(A o'a w W (D 0OWrt7 a 5x d a w a £ tQ w N N N N N N N N N N N N N N N N rt b O W N �! Zn In In �P O �J O OJ V1 Z O N �J r rt C (D (D fi O• "• O m M Pt M M M M M M M M M M M M M M I-h P- aft a rt rtrt rtrt rtrt rtrt rtrt rtrt . rtrt . . rtrt . . rtrr . . rt . . . . . . . . . . . L< d' m r n r (�D m O 7D vJn a rar���� r (D C C C C C C C C C C C C C C C C C C C (n l r C! O V :1 : :j : :1 :3 :3 : :% :1 " :3 rt as aaa as as as as n.a as as cD cD \ * s m a z abed Slg# uOTSTnTpgnS za6u1-d EXh1t31T �N TO: Jeanne A. Mabusth, Zoning Administrator FROM: Michael P. Gaffron, Septic System Inspector DATE: January 5, 1982 SUBJECT: Ringer Subdivision, North Willow Drive #615 Summary: All proposed lots were found to have high water tables, necessitating the use of mound systems. Percolation rates in the upper soil profile generally were suitable for mound systems, with slower rates found in deeper test holes. Slopes on thn entire site are fairly level and suited for mound systems. This report will consist of: a) a short review'of each lot of the proposed division and b) a discussion of mound systems,including how and why they work and their current and future use as part of Orono's land use management plan. The Ringer subdivision is perhaps the most extensive development in Orono to date that will require all mound systems. A. Ringer Subdivision A preliminary review of the Hennepin County Soil Survey indicated extensive areas of Cordova silty clay loam and Shorewood silty clay loam as well as Leseur loam would be found at this site. These soils 1-11 would be expected to have a seasonal water table or saturation zone between 1 and 3 feet below the surface. During the course of the soils investigation, I met with the site evaluator, Carl Borg, and realtor.Graydon McCulley on the site. We made a boring which definitely indicated these high water table soils were present. I later confirmed with Dr. James L. Anderson of the Unijersity of Minnesota Soils Extension Department that mound systems would be. appropriate for these soil types. These are much the same soils as found in the Medina- I4orningside area, which experience conventional trench septic system failures due to the soil conditions. In general, the loamy topsoil characteristics for the Ringer property are suitable for proper functioning of standard pressure -mound septic systems as per Orono's Code and Design Manual. For clarity's sake I have labeled the northern most tier cf seven lots as Block 1, the western group of six lots as Block 2, and the two lots to the southeast as Block 3. Lot 1, Block 1 Peres PBll thru PB16. Borings BB11 thru BB13. Average perc rates for both primary and alternate sites are acceptable. Slopes are quite level. Saturation indications (mottling) started at 1.7 to 2.5 feet. Actual water table at 5-7' depth. A mound system should be used due to the presence of shallow saturation zones.