My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-04-29 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
735 Dickey Lake Drive - 34-118-23-22-0007
>
Septic
>
1986-04-29 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2025 10:49:32 AM
Creation date
9/17/2025 10:44:40 AM
Metadata
Fields
Template:
x Address Old
House Number
735
Street Name
Dickey Lake
Street Type
Drive
Address
735 Dickey Lake Drive
PIN
3411823220007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM DESIGN <br />FOR PAUL SKOOG <br />OF LOT 3, BLOCK 2, RINGERSWOOD <br />ORONO, MINNESOTA <br />4-29-86 <br />1. Percolation Rate, Type of System. <br />73.8 minutes per inch on the primary site and 78.3 on the alternate site. <br />Pressure mound system on the primary, and on the alternate if ever needed <br />there. <br />2. Proposed Flow Rate. <br />3 bedrooms & 150 G.P.D. = 450 G.P.D. <br />3. Soil Treatment Area Needed. <br />0.83 factor when using 12" of clean sand under the rock bed x 450 G.P.D. = 375 <br />sq. ft. This is a rock bed 10 feet wide by 37.5 feet long. <br />4. Dike Width Needed. <br />The basal width factor for this soil is 5.00 so the r,:quired basal width is <br />5.00 x 10 feet = 50 feet. Subtracting 10 feet for the rock bed and because <br />of the flat ground, the dike will need to spread out at least 20 feet on <br />each side of the bed. This is more than a 4:1 slope so it is adequate. <br />The ends should slope at 4:1 or 12 feet out from the 3 foot high mound. <br />5. Distribution. <br />Distribution is to be by pressure to 3 perforated laterals located in <br />the 10 foot wide rock bed. <br />6. Septic -anks. <br />Two sep is tanks, the first of at least 1000 gallons and the second of at <br />least 74 gallons are needed. In addition, a third pumping tank is needed <br />to house the pump and meet the requirements for reserve capacity and dose <br />size. Ai alarm device wil! also be needed to warn of pump failure. <br />414 A e <br />7. All coo,;Tructionymust be kept off both the primary and alternate drainfield <br />sites. .All materii.ls and construction must adhere to the provisions of <br />Individual Sewage Treatment Systems Standards (WPC-40) and the City of Orono. <br />If any add'.tional information is needed, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />Mark S. Gronberg <br />PCA certified <br />
The URL can be used to link to this page
Your browser does not support the video tag.