Loading...
HomeMy WebLinkAbout1977-08-31 Septic System Design ReportAn Expansion o/ Soil Engineering Scrciecs, Inc 1WN1A"Ld/ST.►"LN&. Coo" M. Is. to, 1"ISIM.mph..Mo. H/is/411-M1"a ONTNIN OWNINTA Ttt/ I.111r A"m.11 MIf,, IM. SS1M I t18-163.00 August 31, 1977 George Jackson $ Associates Suite 1760 Shelard Tower Minneapolis, MN 55426 Attn: Mr. Bob Tyler Mr. Tyler: BMUR' ENCINEERNO TESTMG 1 f M�yr1 I. Aw�w M NN mo VKI Aw QAWW_ C • 9Mo" I I . Yu Aa /7.0W.V Re: 77-423 PRELIMINARY SOIL BORING PERCOLATION TESTS Proposed Subdivision S.L. Corner of Watertown Road & Willow Orono, Minnesota As requested, we have recently conducted a preliminary soils investigation consisting of 8 power auger borings and 16 percolation tests. These borings were taken to determine general soil and water conditions over the above referenced subdivision. The percolation tests were conducted to pro- vide preliminary information relative to the soil absorptivity rates. The borings and percolation tests were taken at the locations as shown on the attached sketch. Field locations were determined by you and our crew chief as determined by topographical features as shown on the topographical survey provided by you. Surface elevations were interpolated from the contour elevations shown on this same survey. INVESTIGATION METHODS: Power auger borings were completed using a CME-4S truck - mounted power auger unit. The soil classifications and depths as shown on the attached logs were inferred from the soils brought to the surface by the continuous flight feature of the auger and are thus somewhat approximate. Mineral soils encountered in the borings were classified in accordance with the Unified Soils Classification System. A copy of that chart is attached. Representative sampples of the soils brought to the surface by the auger will be retained in this office for a period of 60 days to be available for your examination. CONSULTING INGIN91AS/S0ILS AND MAURIA1S .... A...,.,. • i ...rr ...1 nn (.., t...,�.. r, 1 �., f n. � ,,.:�... • L,yt,.. hon nl i .,.yb u. t.. o. • Mat. •I TI•irny �.t � i. .._.• �, .. q.,,.. 1.. � .. t,. .yrdf 77-423 George Jackson $ Associates -2- August 31, 1977 Percolation tests were run in 6-inch diameter holes, drilled to a depth of 36 inches, in accordance with procedures normally used on lots that will be developed residentially. In accordance with standard procedures, the holes were permitted to soak overnight before conducting the tests. Each of the borings were probed immediately after completion to check for the presence of groundwater. RESULTS: The log of soils encountered in the borings and the water level observations are shown on the attached Log of Boring sheets. Boring B-1 encountered a sandy clay glacial till from the surface to the 11-foot depth, underlain by coarse alluvium sands and silty sands to the 20-foot termination depth in this boring. Boring B-2 encountered a silty clayey sand glacial till from the surface to the 4-foot depth, which was immediately underlain by a clayey silt lacustrine deposit fruw the 4 to the 13-foot depth. Sandy clay glacial till was then encoun- tered to the 20-foot termination depth in this boring. The balance of the borings, B-3 through B-8, all encountered glacial tills consisting of silty clayey sands in the upper portions of the borings to sandy clays at depth. In probing the borings immediately after completion, it was noted that cave-ins had occurred in all of the borings between the 13 and 18�-foot depths, the exception being boring B-1, where groundwater was encountered at the 16-foot depth. Approximately 24 hours later, a recheck of each of the bore hole borin s B- - Water 7 eet in orin B-5, eet in boring B-1, 15 feet in boring in o ings B-3 and B-4, and at the 17-foot depth in boring B-6. Water level readings vary considerably, ranging from elevation 936, as indicated by boring B-6, taken in the far southeastern corner of the site in what appears to be the lowest area on the site, to elevation 988, indicated by boring b-1 and taken in the upland area in the southwestern portion of the site. These water level variations can be attributed to several factors. 1) The undulating topographic features of the site indicate that water levels are following the contours and subsequent drainage patterns d^veloped in this area. 2) Because of the cohesive nature of the soils encountered, considerable time is required in order for the groundwater to stabilize in the borings. It does not appear BRAun* ENGINEERING TESTING is 77-423 George Jackson 6 Assoc. .3- August 31, 1977 that groundwater levels were completely stabilized at the tikes the water level checks were made. 3) There is a possibility that some of these areas contained "perched" water levels. Water levels should be expected to show normal seasonal and annual fluctuations. At the current time, groundwater levels are at or slightly below the normal. Percolation tests indicated soil absorptivities, in minutes per inch (mpi) as follows: Surface Soil At Rate Test t Elevation Test Depth m i P-1 1002.0± Silty Clayey Sand (SM-SC) 13 P-2 1003± Silty Clayey Sand (SM-SC) 15 P-3 1007.5± Silty Clayey Sand (SM-SC) lb P-4 1007.0± Silty Clayey Sand (SM-SC) 3 P-5 y95± Silty Clayey Sand (SM-SC) 15 P-6 994.5± Silty Clayey Sand (SM-SC) 17 P-7 995± Silty Clayey Sand (SM-SC) 1l P-8 994.5± Silty Clayey Sand (SM-SC) 12 P-9 967± Silty Clayey Sand (SM-SC) 7.5 P=10 967.5± Silty Clayey Sand (SM-SC) 20 P-12 949± Silty Sand (SM) 15 P-13 974.5± Silty Clayey Sand (SM-SC) 15 P-14 970.5 Silty Clayey Sand (SM-SC) 12 P-15 983± Silty Clayey Sand (SM-SC) .10 P-16 984± Silty Clayey Sand (SM-SC) 30 PRELIMINARY RECOMMENDATIONS: You have indicated that current plans call for developing this site as a single family, residential area. The total size of the site is 23 acres; however, individual lot size is not known at this time. You did, however, indicate that it is desirable for each dwelling to have an individual sanitary disposal system. Borings were taken at random across the site and provide preliminary information relative to the general soil types encountered in this area. The borings did not encounter any highly organic soils such as peat or muck; however, some black mineral soils were encountered over the majority of the tract, ranging in depth from 6 niches to 3 feet. Also, a clayey silt lacustrine deposit was also encountered in boring B between the 4 and 13-foot depth. Soils of this sr�un ENGfNEERING TESTING 77-423 George Jackson 6 Assoc. -4- Aii.;ust 31 , 1977 type can be questionable when wet and should be more thoroughly investigated at a later time. Although power auger borings do not provide information relative to the strength parameters of the various soil types encountered, mineral soils of the types brought to the surface by the auger generally are of sufficient strength to support single family dwellings without detrimental settlement. The black mineral soils encountered in the majority of the borings near the surface are likely quite soft and would not provide an adequate foundation. 'These soils will likely have to be removed in their entirety from the building areas prior to construction. The acceptable rate for percolation tests is 60 mpi; there- fore, all of the tests conducted indicate rates of a magnitude which would be considered acceptable. At the time of lot development arid when drain.field locations are established, it is suggested that a more thorough check of soil absorptivity rates be conducted. Uf necessity, the area of the power auger borings and perco lation tests in relation to the area of the subdivision and the depth of the borings are limited. Suggestions and/or recommendations of this report are opinions based on the data obtained from the borings and percolation tests performed. If we can be of further assistance in evaluating these data, or in taking additional borings or percolation tests as the development of the site progresses, kindly contact us at your convenience. Very truly yours, ` BMUN ENGINEERI TESTING, INC. Dennis M. Rietschel Engineering 4 ant C. G. Kruse, P.1:. %'ice President - Engincerir!o I)MII/CGK: skf "- . u .1�1n p1 im• 1 IA., 1 ..1,j. ,1.-'0 n.,.*na .r r, , n. 'N• 11V\I .ul ..,1r..wNlWw. 4�... rn1 ....r . 1 • �.nu w • �n1 . H•.r•1� .1p 1p.,h.n%4+111 y �n1 .W .• y.t.1yN 1.4*10.••a .W 111-.Mn1 BRAUn ENGINEERING TESTING ,�A LOG OF BORINGS PROJECT: 77-423 Preliminary Soil Borings b Percolation Teats, Proposed Subdivision 6 Willow BORING: B-5 LOCATION: BORING: B-6 U E : See Attached Sketch. SURF. 967.0+ -- 953.0+ Depth Desc'r3Qi6n`"oi Materials I) SILTY CLAYEY SAND, fine to medium -grained, with ISH-SC ° fine to medium Gravu 1, ° dark brown to brown, 0 moist to wet. �h (Glacial Till) �� u Sc �110,� 1 V m 0 12 / S SANDY CLAY, brown, moist 1 to wet. CL > (Glacial Till) 15 I 0 w 'A Water level not encountered to v cave-in depth of 13' immediatel a after withdrawal of auger. ° Water level down 7' 24 hours b after completion of boring. G u N v G t0 w 0 a d a v — - --_ --. DATE: 8/24/77 —, SCALE: LOCATION: See Attached Sketch. tH Descrldt''on"01'Wteriols SILTY SAND, fine to medium -grained, brown, moist. (Coarse Alluvium) 5 --_ SAND, fine to medium - grained, with fine to medium Gravel, brown, moist. (Glacial Outwash) 10 SILTY CLAYEY SAND, fine to medium -grained, with fine to medium Gravel, brown, moist. (Glacial Till) 17 S,MY CLAY, brown, moist to wet. (Glacial Till) SN I SP Sri-Sc CL W LI Water level net encountered to cave-in depth of 18'-,' immediately after withdrawal of auger. Water level down 17' 24 hours after completion of boring. -. S-P TESTING, INC. 951 KATYDID LANE �C�CC.. �Co�\c,1 ST. MICHAEL, MN 55376 4074M tot 8 k%\C. (NuaSft sTEVESHIRMERIs ' Il:,s s•��t�r.',S d.C.S,��\�ccl bfJ.coQ,x..o.�ne. ac M.�.�eSotci��to1 CL Qc&S 1,wc: `lc) ar\cl tocak oC&C�x\O maces. n k ` e- S&IS k\�,S (XcCC".- "t 0. Ck So..\cl CA 1.a `-i-t,` �1u �A �k(�'�Oa1A��•� 1n.r1�. 4..%`C� `C\��f_ �� G.('�\ �� �d �Q �� \�•� l,►: LlS �, C.•`l (�a �, +�C �. � �` t \�C�, \.��..\''t � r\ �` �t ��1,. t���.o `J�t�.\il..:c� .,�'�r',•.�!' �'��Y� J ) J (A- )0" ��, , „ .�,� a;;.tci k.o �l��.e�u�•��tC1.` (eat `..�..,�.� ' ..,:;�t cc'--,suc, cd. a�.U��•-.�l S•,,Lc�•. W,�l ►��c to C. Mc Sr,l co, (.. dkc.Ou. (A 11 ko kb lwoL C� ��rc(_o�c�.�.•a•1 C 11�� Lwccu�a. �. Cl .ra.r\�r\c�• R,�t Ace. Gt.-;wxA-c. N oC �(�o► .��q �:�`��,: -'fir �..�i ► :� ,-N(cc� to 'a.:C ti.\`��.t.knK -.tt c •Et to AS%c `\c- S'.►`i;`� `,i\f► 1'\����� ' L, :i�. �JC\C� L�C•t\�, �C'.►`'L +.L. t� i 1 �.�, h`,. `� ,_,`��l•,�., :\mil 4.� ;.\.►.�-•� ;:.c �ocC.:�'A- \•;,,,:•'Oer 64\& C.'� C.L �V.a•.a.� c►.�.al e. \\ill t� t \UCtc,(\1(. . �.l\�`��C' (."%\ Soil and Percolation Teen Septic System Design ..a �. ,t LG • 74 .O c n�c e- -kN.ac-S .1oc3c �AM"k&�_`,coQoSed.'�CICo. MCNk 0.cE0.. _ - -: - . � Kew c�.\� 1nea� ��.,�.�c.�-�•. c�F o� �.�.� �c��r�d� �cc�rrne+�t o,Cecw; p eE oCe 0. CC tc,u.c..k•ocr . o.S rJ& Q,x d.. N10 AC), AL _._ . s4•o�d. eve. �`:pcob\eM',c��Cceo.�:c��.>���,c eF�.�._�sn� . _. _ _ .. ec - ... ceCoa,mtf-s(Ked• Ati�k- --kN\e. S2`��•� tsAr�Cs bft ��.�eGL r I I I I_ g} I I� I I I F I u i I 3 � as �— .2a 103 i•- - - £ j��1' Y N J W w PROTECT DRAIN LD AREA b )'ICN'ATED DRAINFIELD SI SISHALL BE STA- [,�_O 0 F PRIOR TO CONSTRU ON PR EX AYA- WN IN THE AREA. THE DRAT I L0 RA S LL REMAIN LrgDiSTRUBED UNTI RA FI W N'- STRUCTION IS COMMENCE I NO V 111 iC Tt3A"FIC OR STOCKPILING 0 FIL H .L ALLOWED V,11THIN DESIGNATERrk t _L EITH[H BEFORE C1 AFTER D ,; iNF L 1 T {: TI I 04 c L E a o m c-g J v u o � Y.c g +ng E n N t Y - v o Il� t O TL F 0 Y w I I •�. N Cl N [Ty C% 3'n o ^oNo _I c N N Y Y � o r Lu Q1 E Z N L F ` w p O � Y F E E 000 NI15 N Y. u c n o I - u a 1. m C 1 E ICI N T N O 2 a o � a 1 L Y W N ` - `s o O to a l � ={ 4 J J J f J 1 Ow Oti U1 LiI W w w >FQ CDs F f m\ LT=i Z JS ui u a O F v Q O >< Y o 'I N P A I V) U _CL Lw 0 v v C L CL _4'� - E O N _� Y — P c o \ Gov G Yp E o 5 t •I: N o N E;-� 'I- t t � • E g -- n e o co 9 F $ o c E c o c O \ N Y o FL f r o - $ c z � o$ = n 2u, 1 v EY tr. J to 0. u o 0 9 2 a i V W 3 s w Z } ui a o g $ E _o N a N r. U Ua Z a o o O a ' }tr y�. ..' ♦ .. `'.�;i ,: Logo of Soil -lori` 'r sal- 1. �tii.. :; -- `,h •� \ yr c ��.f v�.,. d ,. '�• s •�;• Loee of P!O'!Ct �C� 0. �z ' ioria4lt• wiad br +t '�! • ��4 �_ 1. a .. f $•. � .... -t r � � . r. r, i .. �..,.. _ �r, .. • +a•� � i 7-T Y .� y .� ai:w�Vti•• . :`"-'ci�asiltiteaioa 3yit t' AASNO sVI% ;.`,USUA�,�c=`.�� : ; Unifty�o&'�. ���•�. t. _ I,.. • 1 .t, ..•i t( 0••�^ice �.T4r r ♦y` 7i•$'• c' • ' ~ {yam, : • ui44 (chielt trdli Hap r 'Y� .Moir ,;. Plight i *j �.� �r. • }"+.. n.l •1f � .. - - �l 4.,f.[ N t t; �' i � N� ; ♦a . i i•!� • t' t �`x.�a ` L iCtJt, p ac��•'i- �'�' •r • ,.,l i�• � , �j y .. Yi �`. .. .+Y,, �'t �. .- •... :ZIY ^-. r{ Y ,..-r+-,..r • ('• ^- � ti�f1i t yt in .'�,r t•P i, '.j.la ,r'. ,�-� .. •�,• 'r. `ram �.�' •r+-T rr+' y• aWt1!�,�r.xr;,?� -.� rya M,�,, Stirface, eleiition to } fiet Snriare'eltvation 'foot. ,:: r, �r•. �� y i bit!►. Oo. . - y, %poz-4 N �0� Clou3 ���,• „• l-t .. �'w•_ MOtt\:� r . �. 'f: � rc ;�, i' w�,^,�'�.,.��� .I'6`'� •.. � BSc i�f•.r%i�*e j` .i 1.70�Ck V� �0��`.S41�+�,OOtN1 R i1 �,'iaP.: y� isi. "•i� ' t `s '4^4A �.i�.r..' +• 'j�iM J t'• +'ti- .+ t /+,_' 1:y rc. f44• •.ML•�!c f♦}'�\ }�'�* �i} r �l•; y ••�� 7' _; j`'rti �' ,, ,•~'` ,.Fy �. �.a('ry ` O�'.c1�: '�^�j �\ ,t, I •s ,`;r. ! f..F; 'N , .'ti.' 'r 1~J�iCirN. +! .. +.�: �.' :• .: '.Y �•.Ij'` I .w ``. •, ' � . �. � �.� t a\ V C. CSC � • ��C+• 1 O 6.wt v ;i.. — ���• _�'� r' ri L t ' ' t: • Ott Vt �� ' � tir 's � O1iv.Cs � �JC.OuJt\ \�Qr�1,�i•�rt t �♦�;. '• gar .� '•- ••"� to — 4` . End of boring at %\�� feet. Standing water tablet Present at l'A,r feet of deptb, ►�'�L hours after boring. not present in boring hole Mottled soil: Observed at fly» feet of depth. Not present 1n boring hole �_.,• . to !ad of boring 'at L!/A 'fast. Standing water. table: Present at __ feet of depth. t ..hours after boring - Not present•ln boring hole .Mottled @all:<y, Observed at -�.4' feet of depth. ' Not present in boring mole . _ •) ,�,,. s..'.i .. -T • _�.. •�a��f+• to �' `•".rA,?e.7Vi1.•���Y�i�a ���.~� �..ii• •..,..1.• otYVM•-.-.... r•..�.� T- ! `�.{j +Y n _ t 7>•.� 'I• tom.. 1'�i' ..•. !�T!-Jf• � r ; I. 1 'r .l 'sY.A �. •y�y ••i� A:.,`. , 'i VM'�•' r ' fir"; �1.eta��. •,Pr Tto��et ��,.�. � o�A`� .., 1..�_ . '�., .. ,,-� ...'+' ��..._ � ,: wadit by -P • trA yr�ctt�ri �3.Sc:c.n.0 is ' 4 - �3- 6`i ? s^•'`:' Y *iAm eitoe :rite` usDiA=C=`.: �:: ; vAitlil�`'k ` _ o 1 � � � � ��'• t � °� �L'tle 'I.R rtvd� �' • ,� �T • a �; - ' e�"1. ti :;�;.;� �t ' i •�M' _:1.0 � EIIC `;�':,rl� r: a c+i"-'...�`�`�wr,++l •y L ., i .l}�'. [{��• ; .#f}�,1.� r f. �.�, �.� ��.•1 } ;.AY'>tii'T 7�'�,; � ' f'• r �-'�+�.. p.' • � N �I.�� �, � �!''r •[. �. � � t - -•r�;l.i,�ilY_.N-i►r 4 1• �f /5;. .+•r1 �. 1,,. '►'. :> �'+i 'f i. 1 7�. �'. .�;•• b,i.it�'' 1 ray ,�. �{�,�..... '. ir, 4� �^.. ,�,,'�•�•� ����,�•..,, r�:;�1 1 toriaR tiif�� [ . a.h,' [ . a <� �pth� � •fit,[,. ' al 4 � � ' �`'r.' r tbri�/G�`�uebe�\ •►. Lt:.�.a � {v s; is.r Sri J •• '. i� : •�1•a,iG ` 1•' s •i.4 F,• .. r.. ... ,•: : �� .?� •. mkistaea eli�ation % fiot , gustipe'elevatfon /o '!` �{: K 10 �!:. ..';4.° opSo:1tiotk Qo�w> • . ;ti t o p3ol ', `Ke. ; ,14 'i.. ck.\'°°*! "ram.: TcvocS.vC �C' yl\•R' pR' _ .{ �s.CVC Ci�'aN� , o. ,�nM.� ;? , y �'•' '' be y'"� �1�7� / '1 ` A• .� .. 1�r�� eT •�,�>� ,'. !• • It I.I7• ��,]�rj.���f. •A'• } SL { -,�'�;U! �.��� [ •' ,, +a .i wet Grp. tt,. / y .l-� '.*4f "a. 4.'1'' %lWf�.'r�'•.!S.71. i 41 s i �' J ti'. T..; • u . ' 1/`� �P • ' , . �t e '[;RS{i [t i e (' ;Tel �� ri. :� i� VS,O!A� "� a e s J �• OI.�C Cx \Qen,� !1• __.. _tea•__ .a , ,� ~x"R. i � '�' i.' Vie' •� �. .; . •1 , , �:, l _`r: , r /f�� �-�� rti; ��� � ,�.� . .• ..: y,) I .a�•s , 'pet ! ��M • ' N_ 11 �� d''' 0N�I •Vt� •.�o Q�,t. �,+ /� L,•' a y� 3�0 ,.: ' , - ' oft; . ..•,f ` :• i. ,. . r• 4 —.. ; �` , I�,• i. � •: S3�lirar � �- Laj Ye�M- �. r ,•e•wF �; :l,, -� y .+ ' ,' � ��aVe. v�o�!%f1 )0�^0.fh �r.� ��t�j;�. �'•; r _' r ,Y},�,�; ` ,• " t :. c Y � ��� , 4' . Cr ` =- ' mil; t_' C3�.ow•� A J 7 -- 1 10 10 Lod of boring at feet. Standing water tablet Present at �_ feet of depths .- „►l1L hours after boring. Not present in boring hole . '`:•� `mottled soil: � �"• Observed at _1 4• 'feet of depth. } Not present In boring hole End of boring it (PYJ test. 7777 Standing water, tables Present at _ la- feet of depth. • ' 1l . ;fio�r• after bosinit. , Not •prase�t is borinme hole mottled Sett::" `r Observed', at 't•y' feet of depth. Rot present in boring hole ,• . "K� •^Yr , ',i ....: ` Loaf of soil Boriftits : .;,.',.,., -- ,.:; ,v' •;, Loeatlon or Project.ce -•RSA J{u; r .y:• `., r' '•t ,+ •t f'!' r_•_ ., a, r•� f ..._ 1orliiD�_ tad.: by �i .S�t.�an 8.;�wtCS ,�co -a _'-•' j r .., .. : . Clae�i�ication Srst :> AAS�= USDA-`,�_ Unitiad *r AnRsr asad (check mb) e. 'Hand ; Y or Pow*lr' f MAUt '`,', or Euckit t ;r of «. «a'i.f ?�,.. ".i"' � ••.r,: `„ fn • ; i,�. �. ..�-��'. Z ,� : rr� i' • . s-' `••+�ii� - . , ark wY , -•�t� :� �„-4 `k ^ yDepthi 3ortan nuabiTri � LR •��'� • is ''' � .a . , ., .�•�.• • ,`• :f" feet ' Surface elevation f�tE Surface• elevation Ib1. o . , + . '0 n' 1LcPSo�� �lod� bowl opso.\ ►c�c. , loo;n� ►:;,+ - oock 6cowm too so t, " Its. Vtt�j►"^ " 6;a►'y fro: Loofa��.J�sow Choy ;c •G., ' Z Ok Ot. 8cowc s� .to Ioo,M t� `' �� , y •. . '�;..,,_'-:_ IYz aay, X; ~iY'n., A .�. �� � �. �„�• '.rite, ��: JIr-j.�{/�f , f 1.• ;�� A -�r'.. !!'i� ' y �jT�..� --� , •.+ �.• 1�i},`' .. • -•'.• ��'R.i AY.'�-y)�♦ d' ?1, �1►uL. iOtwln' I OGh,' r' '� ! �' ' L1� . '� l I l faCGS CS So."C% +'- f . s — W �C0.CC F� Q' ��' •V• � 7 — 10 — End of boring at ,Sel�� feet. Standing water table:. Present at Xki feet of depth. l?'l hours after boring. Not present in boring -hole tot t led soil: Observed at VX feet of depth. !Sot present In boring hole — '' End of boring tt (.'f1 feet. Standing water table: Present at feet of depth. -4 11Y.x hours aftat borinst. Not present.in boring hole Mottled soil! Observed at* � �_ feet of depth.' Not present .in bortnit bole L-14 PERCOLATION TEST DATA SHEET ON Test hole location gcu.Ler k.Qycc l Hole number 1- Date test hole was prepared LA-aj-Depth of hole bottom, inches. Diameter of hole, _�_ inches. Soil data from test hole: Depth, inches O _g.. Soil texture Method of scratching sidevall Ae.r1,�e- Depth of pea -sized gravel in bottom of hole, _�_ inches. Date and hour of initial water filling 6''- 3O o.nN. Depth of initial water filling, inches above hole bottom. Method used to maintain at least 12 inches of water depth in hole for at least' 4 hours CxAovcCWt- Percolation test readings made by y -1y-$'4 starting at 9•• « L� (date) p'm' during test, (c, inches. � 115. Xi"_`i . on . Maximum water depth above hole Time Time Interval, Minutes Measurement, inches Drop in water level, inches Percolation rate, ainutes per inch Remarks LA c.••i1 ) 10. 10 Sc i Percolation rate - 11;)..�)' minutes per inch. • L-14 PERCOLATION TEST DATA SHEET Test hole location ?,Case- koKo-k Hole number oZ Date test hole was prepared p p y-a3-8y .Depth of hole bottom,_ inches. Diameter of hole, �_ inches. Soil data from test hole: Depth, inches Soil texture L1- lO" Method of scratching sidewall Depth of pea -sized gravel in bottom of hole, d inches. Date and hour of initial water filling y . a3 • gy 3 . �So Depth of initial water filling, a inches above hole bottom. r Method used to maintain at least 12 inches of water depth in hole for at least' 4 hours UC17La .-%i;k, Percolation test readings made by - 4: Lam.. — on ail-S4 starting at 4�V.la. a.mMaximum water depth above hole (date) during test, (o inches. i Time Time Interval, Minutes Measurement, inches Drop in water level, inches Percolation rate, minutes per Inch Remarks L c)* 4 lo:l Percolation rate - C),(-, minutes per inch. L-14 - PERCOLATION TEST DATA SHEET Test hole location &L.ce. V'OV.a`l Hole number ?; Date test hole vas prepared Depth of hole bottom, 1a inches. Diameter of hole, (o inches. Soil data from test hole: Depth, inches O-8` Soil texture Method of scratching sidewall K&S t Depth of pea -sized gravel in bottom of hole, 4: inches. Date and hour of initial water filling y-a!A-841 :\:30?.CyN. Depth of initial water filling, 1a inches above hole bottom. Method used to maintain at least 12 inches of voter depth in hole for at least' 4 hours i" �. ;►�►t_Sx_� _—._ _ • Percolation test readings made by - 51�.. �• 11- on �J-,4.{• $� starting at :1 a.m. Maximum water depth above hole (date) during testinches. Time Time Interval, Minutes Measurement, inches Drop in water level, inches Percolation rate, minutes per inch Remarks �a� O•.S to. Percolation rate - C:'I L--- minutes per tech. .. L-li PERCOLATION TEST DATA SHEET Teit hole location ?�O( 1.1LL `:0i410i\ Hole number V Date test hole was prepared Depth of hole botto■, \�,_ inches. Diam ter of hole, (2_ inches. Soil data from test hole: Depth, inches Soil texture �• �a" g�0-C:� C�ou� lOoyV1 Method of scratching sidewall— K,,Pe— Depth of pea -sized gravel in bottom of hole, linches. Date and hour of initial water filling lbewta, Depth of initial water filling, inches above hole bottom. r Method used to maintain at least 12 inches of water depth in hole for at least' r. 6 hours cL,, ,.% \ to• C Percolation test readings wade by �- ' . l -_�. on ,- --A - A starting at R:\�_�.w. Maximum water depth above hole (date) during text, (o inches. Time Time Interval, Minutes Measurement, inches Drop in water level, inches Percolation rate, minutes per inch Remarks Q :- � \ 01.d \O :C Percolation rate - 10,E minutes per inch. L-14 PERCOLATION TEST DATA SHEET Test hole location �v.r 'L ICoko�� Hole number cj Date test hole was prepared 4-a3-8y , Depth of hole bottom,_ inches. Diameter of hole, _ (, inches. Soil data from test hole: Depth, inches Soil texture �-R' _ Method of scratchinit sidewall I�Xe_ Depth of pea -sized gravel in bottom of hole, �_ inches. Date and hour of initial water filling Depth of initial water filling, ka inches above hole bottom. Method used to maintain at least 12 inches of water depth in hole for at least' 4 hours Percolation test readings made by l ,ir_, ,_._ on starting at _.m. Maximum water depth above ho (date) during test, (o inches. Time Time Interval, Minutes Measurement, inrhen Drop in water level, IncheH Percolation rate, minutes per Inch Remarks IN Percolation rate - 1- 1.3 minutes per inch. L-14 PERCOLATION TEST DATA SHEET Test hole location ?X%Xce- 10144A Hole number (o Date test hole was prepared y-.13-eq , Depth of hole bottom,1Q. inches. Diameter of hole, �_ inches. Soil data from test hole: Depth, inches Soil texture _UeC v. �"V (oCcI-A Method of scratcninN sidewall Depth of pea -sized gravel in bottom of hole, inches. Date and hour of initial water filling y '1•, 10 �•,'\ Depth of initial water filling, kQ. inches above hole bottom. Method used to maintain at least 12 inches of water depth in hole for at least' 4 hours _ CLL&U ANLIt4.c. C7)-.11N'aJ_\ Percolation test readings made by ' f" 4 on 4-��`1 starting at m. Maximum water depth above hole (date) during test, (., inches. Time Time Interval, Minutes Measurement. inches Drop in water level, inches Percolation rate, minutes per inch Remarks cl..` ,-16 -y q• 4,91b O'. o Li 'T rZ Percolation rate - (o,Lj minutes per inch. IV ilie F. Y F y A I K I F-4 4 INCHES STRAW OR MARSH HAY AND • LAYER OF RED ROSIN PAPER GRASS COVER SAND FILL---, MAXIMUM SLOPE --� !} TO I SANDY LOAM SOIL PERFORATED LATERAL 6 INCHES TOPSOIL 7': P _ �"- TOPSOIL __ ►� % SLOPE SUBSOIL PLOWED OR CLEAN ROCK DISKED SURFACE 3/4 TO 21/2 INCHES CROSS SECTION A - A — PIPE FROM PUMPING CHAMBER \ �\ 1'1!�' IIlk Y '' i o • ' I PERFORATED • LATERALS I ; BED AREA ; I z A I' W i W' I - 20 p p 20 09 INCHES INCHES EET DIKE IO MAX,X. L DIKE TOTAL WIDTH PLAN VIEW mom n or. O N 0 Jz cr Q� W 0 H 2 J z Wz a. 0 a� W co H� H Q� Op W W a. D OW �a O J U. O O s Mo O a U W�WQ•�, m a cr- W a. o a vai a zaw zu - o w °gym � w a Oa � Gaza,_ 0 U. owl=� , U ffi W•_- o N W a a aoino 03 z W Ic W 5 Ir W m Oa ULu Wo a? as ►Y a 0 TEE TO TEE LATERAL —MANIFOLD CONSTRUCTION Grass Cover Topsoi I Loamy Sand Backfi I I H r ay o Straw Covered by Layer of Red Rosin Paper (or nylon fabric) Perforation in Cap Near Lateral Crown of Pipe Tee Reducer Perforations at Lateral Manifold Invert . --Rock.-Layer - I nch Layer of Clean Sand I � pA ,fitISF^�'.�. P� 3 SCfOA�r 3 o o �! ^°+ I ram• Iti 8 I 7 %& a { ~1Z••O a a�a O dig i I- OD( 0 N I �Na' a� a PP. Om «, W Z CL w JO I i� z � O � W �O N I O n O O W I r� z I N J ~ i- F• — N N N l< W � ~ m pp o °W Wo �t LL�m !in N Of IA I� 0 z W ZaQ N �� >UOln i3J W Ql OW Z N I _ NO QZ �j C1 I � I in a N 2 0 ti G ' Q W o m o a in on ce ID I !i Z J:O ti H a a �y v t_n V W O V Z W QII O 40 MWI O V J Yv N O UJ I N W a. O N H Q Z a O Z bl �O W 4 Q IL W Wa Z1LZ� lny O Za Za1! IrU) OZ� i V u_a WW �-- w►LLI '-moi?> t�WfAZ Y waltz}(n �jOj O ul IA In �2N 8g�i9�00d3ra-�Wv►'3; 0 vWi W aga00uY mm2v}av 0_NNvOyN QF-W46 .NO ZZ1WZ;U�UaWZO RZWa~aQ 2 ~ W W WQ U ZZ > R 00 J. Z + �s W a I � i N W Oig Z W~Z 4L QZ0 am s;u ku WI MN X 0 m Wj U a in W ZO- I W O jjnrppLL.m OZiWOO XZl- x O Zy� Wf'OD }a0-ay� Wt Q>ma 9lip O§WOcW J _ Z QOxzx WOtI a90a0aN_ (L Lu 1 0 Oai Ju Q O N I D OW Z J 71 WCL QoW Oa Y4F- u N HQ OVOOO �n J J ZQic}oZ4x Or W►-mP`►.4 a Zig 0WOW J OwuW ll�� Hi W j O�F>-O v0: I u u O W�-w W F 001,-a. is It I l+a 0000000 Z% N OO J Y Z Q F- lL 0} yItjW � 0 O 0 0 0 0 0 0000000 W� N !11 rl Q d1 1D QZ 0 Z 82 d_ 2 0 N J 1 F.. •WVWI Z 4n f- Ig t Z 30 CFO Y ►a- Z yZW,� IWiI Q;d a' JtA�N0, rZO 0 V W } WOCL w J•LL8� a 1. W N - H 10aal;nW W LLI >' a J � 1- CL Z W V oQQoo O V u „- 0 I M o` 4t Ll 3k, C-13 LOG OF BORINGS c 0 w v c w PROJECT: 77-423 Preliminary Soil Borings 5 Percolation DATE: 8/24/77 Tests, Proposed Suhd'ivision SCALE: 1"w4' b Willow BORING: B-S LOCATION: Attached Sketch. BORING: B-6 LOCATION: See Attached Sketch. SURF.See S U R 967.0+ 953.G+ D th Ducr ion o Materials AM W Depth Descht LP o ter io is A W L SILTY CLAYEY SAND, fine SILTY SAND, fine to to mediva-grained, with ISM -SC medium -grained, brown, SM fine to medium Gravel, moist. dark brown to brown, (Coarse Alluvium) moist to wet. o (Glacial Till) •? 5 Siri� �L� j 6 SAND, fine to medium- f�I 0� grained, with fine to SP ,(.f of � medium Gravel, brown, moist. f (Glacial Outwash) 10 ---- -- _ 1 SILTY CLAYEY SAND, fine SM-SC \/ to medium -grained, with 12 __ ____ fine to medium Gravel, SANDY CLAY, brown, moist brown, moist. to wet. CL (Glacial Till) (Glacial Till) 15 Water level not encountered to 1 cave-in depth of 13' immediatel.3 SANDY CLAY, brown, moist after withdrawal of auger. to wet. CL (Glacial Till) Water level down 7' 24 hours 2Q -- after completion of boring. Water level not encountered to cave-in depth of 18'' immediately after withdrawal of auger. Water level down 17' 24 hours after completion of boring. . 77-413 George Jackson & Assoc. -4- Au,;ust 31, 1977 type can be questionable when wet and :should be more thoroughly investigated at a later time. Although bower auger borings do not provide information relative to the strength parameters of the various soil types encountered, mineral soils of the types brought to the surface by the auger generally are of sufficient strength to support single family dwellings without detrimental settlement. The black mineral soils encountered in the majority of the borings near the surface are likely quite soft and would not provide an adequate foundation. These soils will likely have to be removed in their entirety from the building areas prior to ■ construction. The acceptable rate for percolation tests is 60 mpi; there- fore, all of the tests conducted indicate rates of a magnitude which would be considered acceptable. At the time of lot development. and when drainfield locations are established, it is suggested that a more thorough check of soil absorptivity rates be conducted. Of necessity, the area of the power auger borings and perco- lation tests in relation to the areaof the sub' ,,'ision and the depth of the borings are limited. Suggest.a-i:. and/or recommendations of this report are opinions base.` on the data obtained from the borings and percolation tr':;ts performed. If we can be of further assistance in evaluating these data, or in taking additional borings or percolation tests as the development of the site progresses, kindly contact us at your convenience. Very truly yours, R UN ENGINEERI G TESTING, INC. qv/ Dennis M. Rictschel Engineering Ass'stant C. G. Kruse, P.E. Tice President - Engincerinri 01 DMII/CGK: skf 3�rrn�.r',•1 n' In: ,' lN..1 WO %. vj...It,nq A... uminta 1•. r,_ r rt,. !• •u..:. .: a..�l ...n M• .r• .arl• :n In.. .1' .. .. r • t..: t !r• ..r :r wry t r y • •nl.rin.n Ilb Isau rnr r1O rh.IrUnMh.�.lt 1• .I rr. .r • •r.•.,.Ir ll�.. t WI n rr•'.Irnl 1 TV' BRAU11' ENGINEERING TESTING • 77-423 George Jackson 6 Assoc. -3- August 31, 1977 that groundwater levels were completely stabilized at the times the water level checks were made. 3) There is a possibility that some of these areas contained "perched" water levels. Water levels should be expected to show normal seasonal and annual fluctuations. At the current time, groundwater levels are at or slightly below the normal. Percolation tests indicated soil absorptivities, in minutes per inch (mpi) as follows: Surface Soil At Rate Test I Elevation Test Depth m i P-1 1002.0± Silty Clayey Sand (SM-SC) 13 P-2 1003± Silty Clayey Sand (SM-SC) 15 P-3 1007.5± Silty Clayey Sand (SM-SC) 1S P-4 1007.0± Silty Clayey Sand (SM-SC) 8 P-5 995± Silty Clayey Sand (SM-SC) 15 P-6 994.5± Silty Clayey Sand (SM-SC) 17 P-7 995± Silty Clayey Sand (SM-SC) 12 P-8 994.5± Silty Clayey Sand (SM-SC) 12 P-9 967± Silty Clayey Sand (SM-SC) 7.5 P=10 967.5± Silty Clayey Sand (SM-SC) 20 P-11 949± Silty Sand (SM) 15 P-13 974.5± Silty Clayey Sand (SM-SC) 15 P-14 970.5 Silty Clayey Sand (SM-SC) 12 P-15 983± Silty Clayey Sand (SM-SC) 20 P-16 984± Silty Clayey Sand (SM-SC) 30 PRELIMINARY RECOMENDATIONS: You have indicated that current plans call for developing this site as a single family, residential area. The total size of the site is 23 acres; however, individual lot size is not known at this time. You did, however, indicate that it is desirable for each dwelling to have an individual sanitary disposal system. Borings were taken at random across the site and provide preliminary information relative to the general soil types encountered in this area. The borings did not encounter any highly organic soils such as peat or muck; however, some black mineral soils were encowtvrcd over the majority of the tract, ranging in depth from 6 inches to 3 feet. Also, a clayey silt lacustrine deposit was also encountered in boring B-2 between the 4 and 13-foot depth. Soils of this BRAUR* ENGINEERING TESTING • 77-423 George Jackson & Associates -2- August 31, 1977 Percolation tests were run in 6-inch diameter holes, drilled to a depth of 36 inches, in accordance with procedures normally used on lots that will be developed residet;o.ially. In accordance with standard procedures, the holes were permitted to soak overnight before conducting the tests. Each of the borings were probed immediately after completion to check for the presence of groundwater. RESULTS: The log of soils encountered in the borings and the water level observations are shown on the attached Log of Boring sheets. Boring B-1 encountered a sandy clay glacial till from the surface to the 11-foot depth, underlain by coarse alluvium sands and silty sands to the 20-foot termination depth in this boring. Boring B-2 encountered a silty clayey sand glacial till from the surface to the 4-foot depth, which was immediately underlain by a clayey silt lacustrine deposit from the 4 to the 13-foot depth. Sandy clay glacial till was then encoun- tered to the 20-foot termination depth in this boring. The balance of the borings, B-3 through B-8, all encountered glacial tills consisting of silty clayey sands in the upper portions of the borings to sandy clays at depth. In probing the borings immediately after completion, it was noted that cave-ins had occurred in all of the borings between the 13 and 18�-foot depths, the exception being boring B-1, where groundwater was encountered at the 16-foot depth. Approximately 24 hours later, a recheck of each of the bore hole borin s B- - Water 7 eet in Grin B-5, eet in boring B-1, 15 feet in boring - , 16 in oorings 8-3 and B-4, and at the 17-foot depth in boring B-6. Water level readings vary considerably, ranging from elevation 936, as indicated by boring B-6, taken in the far southeastern corner of the site in what appears to be the lowest area on the site, to elevation 988, indicated by boring B-1 ar,' taken in the upland area in the southwestern portion of the site. These water level variations can be attributed to several factors. 1) The undulating topographic features of the site indicate that water levels are following the contours -and subsequent drainage patterns developed in this area. 2) Because of the cohesive nature of the soils encountered, considerable time is required in order for the groundwater to stabilize in the borings. It does not appear BRAun' ENGINEERING TESTING An Expansion of Soil Engineering Services, Inc. Bmun" ENGINEERING TESTING IINNIAPOLIS/ST. ►AUL MS. Cow" IM. N. ► 0. Mt 3SIN, Mrb.. Mo. SSgS / 112.141 SM J s $RAU* r I. wear r ONTHI M MIMNISOTA 32191.1MAAvenue. NINa1. Ms. SS2N 1211.2q•NN e 6 ARumpNDI 1. vKew. 1.0"WQmwr C i r�VfE11, vaeAra t.r.�•,ry August 31, 1977 George Jackson $ Asscciates Suite 1760 Shelard Tower Minneapolis, MN 55426 Attn: Mr. Bob Tyler Re: 77-423 PRELIMINARY SOIL BORING PERCOLATION TESTS Proposed Subdivision S.E. Corner of Watertown Road $ Willow Orono, Minnesota Mr. Tyler: As requested, we have recently conducted a preliminary soils investigation consisting of 8 power auger borings and 16 percolation tests. These borings were taken to determine general soil and water conditions over the above referenced subdivision. The percolation tests were conducted to pro- vide preliminary information relative to the soil absorptivity rates. The borings and percolation tests were taken at the locations as shown on the attached sketch. Field locations were determined by you and our crew chief as determined by topographical features as shown on the topographical survey provided by you. Surface elevations were interpolated from the contour elevations shown on this same survey. 1NVESTIGATION METHODS: Power auger borings were completed using a CME-45 truck - mounted power auger unit. The soil classifications and depths as shown on the attached logs were inferred from the soils brought to the surface by the continuous flight feature of the auger and are thus somewhat approximate. Mineral soils encountered in the borings were classified in accordance with the Unified Soils Classification System. A copy of that chart is attached. Representative sampples of the soils brought to the surface by the auger will be retained in this office for a period of 60 days to be available for your examination. CONSULTING ENGINUAVSOILS AND MATERIALS nr-end •I.O� f • In an✓� In)n ul ! �nUw. I....• • M.•I, .I Tett"