Loading...
HomeMy WebLinkAbout1995-09-02 On Site SewageTreatment Inspection ReportCITY OF ORONO Municipal Offices Post Office Box 66 Crystal Bay, MN 55323-0066 ON —SITE 'WAGE TPU ATIf1ENT INSP-I TION REPORT Owner: _ JC' 4�} V F rQ1^)Address: Permit Pa: Dates: Contractors: City ordinance numb •3: rrauires that each on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sewagp ri" system at the above address has been inspected and app-ars to fall into the category checked below. (This is ( I an existing system jD, new construction) XFORMITY (1-3): :F "CODE SYSTEM"-4 system which meets all the location, design, and construction standards of the current City Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input without discharging any pollutants into ground or surface waters. "CONFORMING SYSTEM" -A system which does not meet all the location, design, and construc�irxi standards of the curs•ent City Codes, but was installed according to the code in effect at the time of im..;�;:etion, and which is operating satisfactorily by treating and disposing ^i the entire current sewage input without discharging any pollutants intu ground or surface waters. "NOW -CONFORMING SYSTEM" -A prohibited system; a czy,tem i,,•,ted within a designated 100-year floodplain system which may or may not meet all the larai ri, des . % and construction standards of the current City Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand between the distribution device and the Limiting soil characteristics. (The HIII iting soil chars-!�ristic yq has or ( I has not been Identified at this time. If the limiting soil characteristic has not been identi ied, this classification maybe subject to revision.) TANK CONDITION (5-10): inspection indicates: 5 Puspout not needed at this time. Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems. 7 Solids accumulation in tanks is at a criticel level. Tanks should be pumped out as soon as possible. 8 System is discharging to thv surface. Tanks mi<_t be pumped out within 48 hours to eliminate surface discharge. 9 Inspection risers missing -tanks could not be inspected. Inspection risers (4" dia. pipe) must be installed in each tank at next ptwpout. If tanks have not been pooped out within " a lost three years, they should be pulped out now. 10 Inspection p�pe is located direct)over tank baffle (does not give act —'ate measurement of solids accumulation). If tanks have not been pumped Y out within the last three years, they should be pulped out now. D/eNfield inspection indicates: 11 Drainfield is dry, no surfacing ev .,it. Some evidence of surfacing, not cry„ cal yet. 13 Drainfield is saturated and visibly discharging untreated eff a surface. Contact the ity Inspector immediately. Repairs must be completed within 90 days. 14 Drainfield et. nt and condition unknown. LIMITING SITE FACTORS (slope.s•tbacks,etc.): 4 POTENTIAL FOR SYSTEM FAILURE (gepends on soils water table etc ): � COMMENTS: J Gate .f :,-,apection Septig System Inspe for Note: In the event thd. its inspection i , used to satisfy the requirements for a mortgage or other rr of property, be advised tl,,,- this report does not guarantee or certify that an existing system will continu ,ction properly+ but is merely an opinion of the adequacy of the system under current conditions based on o.: Jit abie information. This report must be kept on the premises with the system location and pumping records. WHITE COPY Inspectors V YELLOW COPY Homa, yr