HomeMy WebLinkAbout1993-12-13 Septic System Design ReportS-P TESTING, INC. Steen S. Schirmers — MPCA Cert. No. 627
951 Katydid Lane NE * St. Michael, MN 65376 • (612) 497-3566
December 13, 1993
Coffin site
Lot 8, Block 1
Orono, Henn. Co., MN
This On -Site Sewage Treatment System is Designed for a Type 1, five
bedroom home in accordance with the Minnesota Pollution Control
Agency Chapter 7080 and local ordinances.
The soils on this -A-*-_* are SCS soils :napped - KkB - Kilkenny loam
& LrB - Lester loaff. A seasonally high water table was located
at 24" to 30", (mottled soil). Due to the seasonally high water
table, a Pressurized Mound System will need to be installed.
The bottom of the rock bed must be located at least 3' above the
seasonally high water table.
The soils at a depth of 12" have a percolation rate averaging
5.9 min/inch.
A pumping chamber will need to be installed to lift the effluent
to the treatment area.
The manifold and supply line pipe must have back drainage to the pumping
chamber. The distributir.)n pipes shall have their ends capped. Be sure
the rock and sand fill material are clean. The sod layer below the
entire mounded area must be turned over, just break up the sod, be sure
not to over work.
The power supply and switches must be located outside the manhole and
pumping chamber in a weather proof enclosure. A warning device must
be installed with a light and sound device, this is in case of a pump
failure. Mercury floats are a good method.
All neighboring wells are located greater than 100' away from the
proposed treatment area.
CONT'D
Coffin site
Lot 8, Block 1
Orono, Henn. Co., MN
(2)
Keep all heavy equipment off of the proposed treatment area before and
after construction. The treatment area should be marked off before
construction. This Design is not valid & the System will need to
be relocated if failure to protect the areas proposed for On -Site
Sewage Treatment occurs.
With proper installation and maintenance, this system should have no
problem in treating septic effluent effectively.
Nothing other than gray water, (laundry, showers, etc.) human
waste & toilet tissue should be disposed of into the septic tanks.
Garbage disposals are not recommended. Smaller amounts of laundry
soaps, dish soaps, cleaning agents, etc. are better for the system.
Antibacterial soaps & chlorine agents may kill the bacteria needed
to treat septic effluent properly Additives are not recommended,
they may cause harmful damage to your system. Recommend to pump
& clean your tanks by a certified pumper every year if you have
1 tank & every 2 years if you have 2 tanks to insure proper
maintenance.
Steven R. Schirmers,
SBS/ds
c.:
t
y.
CITY am ORO a
RVILDIN0 L eN1"I•
ofspecyon
OATS � rERMr���„
APPRV'. D AS sur�,rtrrFn
APPROVED w1)H CC1fr:Z:CrIONSD
_ NO I* APPROVED — C,.:h_Cr &ITYIAwe
comments are IOr your !rr'O!rn[bonAiitlpr»con4 tlanco with Ml 'Jo v.: CL•, lu ti4ii(1 �e 1�{
G*fmtwlts tre ufmµ Itern5 not s - e y nnfed m thm •eN�.
XFFP THIS PL -lu S1fL Al ALL TsWk
�mF
C''
p LL
t 1
-_
G
y A p
b
Y
t
A
0 IP
f�
Ir o
If m
y
N
n
1
1
• �
W
N
l7
D n
a F^I� ..
a l
3
�1 133 r
ors-° o
N N N
^ 3 3 3 3 3
N
i
D
O
0
i
I
n
1,
Le
1
A
N
�
`
�
lO
I
-1
11
N
V
Q
o
n
�lr S T S 22 pn cu
00
{
y I • r .,Q
G
o
G
o m =4 rn rn rn I In Z
'I •I 1 '1
(.
'
n
tj
A
i..
y
0
Ij
a.
1�
�
� f
� ,� � A V
4
� -►
O
L
fd-InLn
'�+
••
�z
f
kid
rlo
Sri
MOUND DESIGN WORKSHEET
(For Flows up to 1200 gpd)
A. FLOW
Estimated 0S0 gpd (seepages D-7 or I-3, 4, 5)
or measured - gpd x 1.5 =
B. SEPTIC TANK LIQUID VOLUMES
gallons (seepages C-3 or C- 5)
C. SOILS (refer to site evaluation)
1. Depth to restricting layer = -Aq" le 30il inches
2. Depth of percolation tests = 1 a" inches
3. Percolation rate 6. CY mpi
4. Land slope S %
D. ROCK LAYER DIMENSIONS
1. Multiply flow rate by 0.83 to obtain required area of rock
layer: Daily Flow x 0.83 =
,)�v gpd x 0.83 sq. ft. / gpd =ya sq. f t. -i ► o'%,
2. Select width of rock layer (10 feet or less) _ �.. 0 ft.
3. Length of rock layer - Area + Width =
LK4 sq. ft. + /_ ft. = G V ft.
Eaiwwd Uwase Flom is COMB Fa Jay
care►
a1
T$ as I
Ty" II
Typr III
ry
t2S
too
'00
214
tw
2%
.too
294
I
332
Tr L
370
L
4
.r+.
t w �..
770
1123
• r •
IOO
1lIIO
•�4
1C
wo
7.e.+
n»
xco
t, Sd1.l
E. ROCK VOLUME
1. Multiply rock area by rock depth to get cubic feet of rock;
(I sq. ft. x L. - ft. _ ?1 �d cu. ft.
2. Divide cu. ft. by 27 cu. ft./cu. yd. to get cubic yards;
aL� cu. ft. + 27 = cu. yd.
3. Multiply cubic yards by 1.4 to get weight of rock in tons;
-J,-1 cu. yd. x 1.4 ton/cu. yd. = 2_V tons.
F. ADSORPTION WIDTH 4-`�44 A"i
1. Percolation rate in top 12 inches of soil is mpi
2. Select allo.irable soil loading rate from table on page E-;
, 4 gpd/ft'
3. Calculate adsorption width ratio by dividing rock layer
loading rate of 1.20 gpd/ft2 by allowable soil loading rate,
1.20 gpd/ft2+ .. W� gpd/tt' = 3
Check this value on page E-I6.
4. Multiply adsorption width ratio by rock layer width to get
required adsorption width;
2.G,) x 9 ft = 1 ft
Pock Bed
3 sFidth 11011.
,r•r�r��r:r� � _}r �: r ri
1-- lenalh
Ab9"iM WWlh SWf T ble
PwoNwa.11n
Soil T.uwa
Ce1ew
:f;ha
iteeio of
AMuple aYMM,Omp
wiM
F~ dre 0.1
Comm Sews
& I IDS
Sad
1.20
to
0.1195 S ••
roue Saw ••
a60
2.110
610IS
S.efylaw
0.1,11
132
161030
Loew
0.N
2A0
311045
Sib law
2.e0
N n f0-
a* 120
Cloy Lore
tl+y
74
ZA7
5.10
Sloe duw
Clay
--
---
I30••
Li. UUWNSLUNE DIKE W1U*11-1
I. If landslope is 3% or more, subtract rock layer width from
adsorption width to obtain minimum downslope dik 'oe for
absorption:
'AL..,) ft - /0 ft feet
rA
—
Calculate minimum mound size based on geometery:
a. Determine depth of clean sand fill at upslope edge of rock
layer: Separation 1.0 feet
b. ltiply rock layer width by landslope to determine drop
in elevation; Slope Difference �� \
10 x C% + 100 = ." feet �--�-
c. Add depth of clean sand depth of clean sand for ��-
separation at upslope edge (2a) to depth of rock layer to
rock depth and the depth of cover to find the total mound
height at upslope edge of rock layer;
/. o ft + 1 ft + 1 ft = 3.0 feet
d. Enter table on page bottom with landslope and upslope
dike ratio. Select dike multiplier of 3.33
e. Multiply dike multiplier by upslope mound height
to get upslope dike width: 3.o x 3.-3'3 = /o feet
f. Add the depth of slope difference (2b) to the upslope
height to get the downslope height
3. y + S =_3 .,'feet
g. Enter table on page bottom w-.1i landslope and
downslope dike ratio.
Select dike multiplier of S.y
h. Multiply dike multiplier by downslope mound hei ht
to get downslope dike width: ri x S.o = feet
i. Compare the values of sici ';.1 and Step G.2.h. Select the
greater of the two values as the downsiope dike width;
I'e_ feet ;.::.:.::':::: : :• :::::.........:..:::....:.:.
�
Total mound width is the sum of upslope dike Roc i u wi"
:t : r Y Y Y V Y Y Y V Y Y Yr�: ••' ••'
width plus rock layer width plus downslope
dike width;
1_ ft + / 0 f t + —4i f t = 73 feet r::.:;.+r.:{.L•.t:. r.•:.::. 'i:'•:�•'':
OQW WWI i—J-e�-
k. Total mound length is the sum of upslope
g f:;':•'s: twrwi;a
dike width plus rock layer length plus ::• :,
upslo-- dike width;
ft + _._("d ft + 1-0 f! = fS� feet
4.1
S l
ll
7:1
1 1
• UoFr
0
30
40
So
60
70
It.
10
SO
LO
70
I
S00
417
$2L
LN
733
3Li
176
S"
6S1
741
J
71�
13S
SSL
LIi
1i1
'V
)-
ISI
5%
.14
L10
)
131
1S1
SN
77J
IIV
'"i
3.7
13.
Sry
L79
11S
/
111
476
LJS
ei
-:
••+
3.G
11-
:�
;L.
1(t6
S
is)
5(a
60
SS7
3U
1
:•:
S7I
711
Y)3
1J117
93
511
7
3W
SSL
`N
IU.31
1173
711
)IJ
37U
IJ
17U
S13
1
31S
So
13
1151
1191
712
)W
3S7
IItS
1/3
1M
Y
111
L1S
♦W
I)IN
I147
J\6
231
34;
)+I
1310
1LS
t0
129
1V
100
1;(10
21))
7)1
JN,
))1
)7,
117
111
11
111
714
it it
17 hi
11'13
2N.
77•
313
).;
395
414
•1
163
7/.0
1'><I
�1 i)
.17i
41J
l,
C
A. mmine pump capadh'.
' Gravity Distribution
1. Minimum suggested is 600 gallons per hour (10 gpm) to stay ahead of
water use rate.
2. Maximum suggested for delivery to a drop box of a home system is 2,700
gallons per hour (45 gpm) to prevent build-up of pressure in drop box.
Fmiure Distribution
3. a. Select number of perforated laterals 3
b. Select perforation spacing a n. ft.
c. cubt 2 ft. from the rock layer length.
-2it. =j�,ft.
d. Determine the num} Df spaces between perforations.
Length perf. spsch ft. + ft. _ =Z spaces
e. spaces + 1 =_2L_ perforations/lateral
f. Multiply perforations per lateral by number o(' rats to
I
total number of perforations.
x a= _ Lc perforations. 1 13a a .
g• 10 X-,C*, gpm
SELECTED PUMP CAPACITY
e. Determine head requirements:
1. Elevation difference Wiveen pump and point of discharge.
- ('_ feet
2. If pumping to a pressure distribution system, add five feet for pressure
required at manifold
feet
3. Friction loss
a. Enter friction loss table with gpm and pipe diameter.
Read friction loss in feet per 100 feet from table.
F.L - 'aj,ja_ ft. ;,, )ft of pipe
b. Determine total pipe length from pump to discharge
point. Add 25 percent to pipe length for fitting
loss, or use a fitting loss chart. Equivalent pipe
length -1.25 times pipe length =
_ 1 x 1.25 - )S O feet
c. Calculate total friction loss by multiplying
friction loss in ft/100 ft by equivalent pipe length.
Total friction loss = ) • G x ) J +100 = _ V feet
4. Total head required is the stim of elevation di fervir.C,
special head requirements, and total friction loss.
(1) (2) (3c)
TOTAL , If ',I` feet
C. Pump sel:ction
1. A mimp must be selected to deliver at least gpm F. PI)
with at least _ ) S feet of total head (Step B).
DO PE VMTtttt/ OF A rEWOPATEa LATEPUiL
M fawr
d 40mook PAN go owl
ra..
" tiusWW ^• Mw r . M.aN
r=r a..r
�• im N � t� (iaN
a . , IV�rw� tMu/ N
Cam
a.e LAW N �«d
TABU OF PERFORATION DISCHARGES IN CPW
Head PerfantimdVnt-wo OrKhea)
./M
,/,
149
036
0.74
13
Ob9
0.90
2.01;
0.90
I D4
23
069
1.17
3.0
a."
128
4.0
1.13
1.47
sA
126
IAS
ache 1.0 foot of head for residential syst"M
bole 2A 6m of had be odrr eafabiishnenb
Pipe Length
I t
Point of DischF.......... j/010 �p
Elevation Diffemtce
Pump 0^ 4 tJ
F-18b
1.5 inch 2.0 inch 3.0 inch
9PM rVk%kMi.rr. i00n.tr%a
10
.., 69
0.20
12
0.96
0.28
14
1.28
0.38
16
1.63
0.48
18
2.03
0.60
20
2.47
0.73
0.11
23
3'3
'.11
0.16
30
5.A
1.55
0.23
35
7.90
1.06
0.3P
40
1107
2.64
0.39
45
14.73
3.2r
0.43
so
? 99
0.`_8
55
4 76
0.70
60
60
0.82
Location or Project Lot 8, Block 1, Coffin site, Orono
Borings made by S-p sestina, Inc. Steve Schirme-s Date 10-26-93' ..
Classifiction System: AASHO USDA-SCS X Unified Other
Auger used (check two): Hand_X or Power , Flight , or Bucket X
Depth, Boring number, 1 Depth, Boring number 2
in in
feet Surface elevation 998.7 feet Surface elevation 1000.0
0 - F—, . __ —. 0 - - - -
Topsoil dark brown loam
n - in"
1 -
Brown clay loam
2 - 10" - 2'-MOTTLED 2'
Rusty olive brown
clay loam
3 - 2' 3,
I Rusty olive brown
4 _ loam
5 - 1 3' 5'
6 -
'7 -
End of boring at fir!_ ,c.t,
Standir.,3 uar r i �t,:.•:
present at f _ _ ;,.' :;-:?pth
hours after borinn.
Not tires-nt in Hole
Mottled soil:
Observed at 2'
Not present in hole _
Comments:
Topsoil dark brown
0 - 10" loam
1 - Gray 10" - 1-2" brown loam
Gray brown loam
2 -
1'2" - 2'4"-MOTTL
Rusty olive brown
3 - clay loam
2'4" - 3'4"
4 - I Rusty olive brown
loam
5
3'4" - 5'
-
6 -
7 -
8 -
End of �r inq at 5I feet.
St anc?i ::lrrrr table:
presen` %t feet of death,
hours after boring.
Not. pr•?..-nt in hole y
Mottle: .: •i 1
c;bsec v:.: at 21 4" feet of depth.
Not pre-_ --•nt in hole
Comments:
2'4
Location or Project Lot 8, Block 1, Cof.fin site, Orono
Borings made by $-P ?.estina, Inc. Steve Schirmers Date 10-26-93
Classifiction System: AASFIO USDA-SCS X Unified Other
Auger used (check two): Iland X or Power , Flight , or Bucket X
Depth, Boring number 3 Depth, Boring number 4
in in
feet Surface elevation 998.8 feet Surface elevation 997.8
J- - --- — — 0 - -- - - -
Topsoil dark brown loam
0 - 10"
1
1 _
Topsoil dark brown
Brown clay loam
loam
2 _
10" - 21-MOTTLED 2'
2 -
0 - 2'-MOTTLED 2'
Rusty olive brown clay loam
brown2' - 2'4" clay loam
Gray
2' - 2'8"
3 -
3 -
Rusty gray brown
clay loam
Rusty olive brown
loam
4 -
4 -
264" - 414"
Rusty gray clay loam
2'8" 5'
404" 5'
5 _
5 -
6 -
7 -
E'nd of horinq at 5� het.
! ttindinq) rater tal.'-':
present at fee'_ ,,f A-?Pth,
hours after torinq.
Not present in hole X
Mottled soil:
Observed at dep".h.
Not present in hol_
Comments:
6 -
7 -
8 -
En:'. of boring at 5' feet.
:nd ln1 Water ta!--lo:
present at feet of depth,
hours after boring.
;toy f)L,_— ant in hole X
!.*:(-)'---led soil:
Observed at 21 feet of depth.
Not present in hole
Comments:
Location or Project Lot 8, Block 1, Cof
Borinys made by S-p Testing, Inc. Steve Schirmers Date10-26-93
Classifiction System: AAS110 USDA-SCS X Unified ; Other
Auger used (check two): [land X , or Power , Flight , or Bucket X
Depth, Boring number 5 Depth, Boring number 6
in in
feet Surface elevation 998.7 feet Surface elevation 998.0
0 - - -- -- 0
Topsoil dark brown loam Topsoil dark brown
0 - 10" loam
0 - 1'
Brown clay loam
2 Brown clay loam - 10" - 2'-MOTTLED 2' 2 -
Rusty olive brown 1' - 2-1/2'-MOTTLED
silty loam JVAS n 2-1/2' - 2'10" 2-1/2
3 - 3 -
2' - 3'4"
Rusty olive brown
_ Rusty olive brown sandy loam
4 loam 4
5 - 3'4" 5' 5 _ 2110" - 5'
6 - ( 6 -
7 -
8 -
End of !goring at �_ _ feet.
present at f.2ot of depth,
hours after boring.
Not present in hole X
Mott lod soi 1 :
Observed at 2' feet of depth.
Not present in hole
Comments:
7 -
8 -
End of boring at feet.
StInc:t-r ~able:
present at feet of depth,
hours after boring.
Not present in hole__X
.4ottled soil:
05serv^d at 7_1/2' feet of depth.
'lot present in hole
Corments :
Location or Project__Cpf1n sj_Le� Block 1, Borings 7 &8, Orono
Borings made by S-P vesting, Inc. Steve Schirmers _ Date 10-25-91
Classifiction System: AASHO USDA-SCS X U,iified Other
Auger used (check two): Hand X or Power Flight or Bucket X
Enzl of boring at 5 act.
hrnt at 1.,_= of •_!epth,
hours after boring.
present in
MoLt:led soil:
Observed at 2-1/2'fL-et of (lep`.h.
Not present in hale
Comments:
End of boring at 5' font.
Standing water table:
present at fret of depth,
hours after boring.
Not ,)resent in hole
Mottled soil:
Observed at 2oln" feet of depth.
Hot present in hole
Corunents:
• '• U b "J
Location or Project Coffin site, lot 8, Block 1, Borings 9 & 10, Orono
Borings made by S-p %esting, Inc. Steve Schirmers Date 10-25-13
Classifiction System: AASFIU USDA-SCS X Unified Other
Auger used (check two): (land X or Power Flight , or Bucket X
Depth, Boring number Depth, Boring number_ in
in in
feet Surface elevation feet Surface elevation tnng_a
0 - 0
--- — — b - - -
Topsoil dark brown loam Topsoib _ 6" gfj I�$in
0 - 10"
Brown clay loam
F4
10" - 2'4"
Brown loam
3
2'4" - 2'10"-MOTTLED
-
Rusty olive brown clay loa
2110" - 3'8"
4
Rusty 3'8" - 4' illy; nix
-
Rusty brown loamy sand
4' - 4'8"
5
Rusty 4'8" - 5- olInmbrow
-
6 -
7 -
8 -
land of Loring at 5' f����t.
r*'1'i•':111) water ta!J1••:
present at fey_ )f-!_�pth,
hours after 5orinq.
Not present in hole X
Mottlod soil:
Observed at 2'10"
feet Uf sl�pth.
Not present in hole
Comments:
Brown clay loam
2 -
2 10" 1 b 6" - 2'10"-WEAK
3 Rusty oC I' 10"- 3' 4"
Rusty olive brown
4 - loam
4'2"-STRONG MOTTLING
5 - 314" - 5'
6 -
7 -
8 -
End of boring at 5' feet.
Sf ::rldi:l;., water table:
present at feet of depth,
hours after boring.
Not present in hole X
Not t led soil:
Observes? at 2'10" feet of depth.
Not r:)resent in hole
Comments:
Cr*.ka ir00627
PERCOLATION TEST DATA SHEET
Percolation test readings made by S-P Testing, Inc ,,,, 10-27-93 a.m.•
Jaw
Carting at 10: 22 Vim.
Test 1wic location Lot 8 , B 1 k .1 ,Coffin site, Hole number 1 Date hole was prepa1 10— 26-9 3
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test bole:
Depth. inches Soil texture
0 - 10"
10" - 12"
Topsoil dark brown loam
Brown clay loam
Alethod of scratching side,all Knife
Ih pth of gravel in bottom of hole 2 inches
Date and hour of initial water fillip 10-26-933 ll1;t 13 afn 12
F DcpTh of tm is water fillip= inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least J hour. Automatic siphon
. Maximum water depth ahrse hole hottom during test 6 irtche>
Time Percolation
Fink interval. :Measurement. Drop inwatcr rate. Remark%
minute, inches level. inches I minutes per
---- _ inch
!0:10 prefill 6
-10:22 10:37 3-1/8 15 min
10:48 11:03
11:04 11:19
� I
— - --- _- — - — — — —-- - - -- — — sees -- ---— --
-- I
Pei:ol,uion rate = 4 - 8 minute, per inch.
CERT. 800627
PERCOLATION TEST DATA SHEET - . -
Percolation test readings nude b S—p 'rest; na _ Tar- on 1n-77—Q1 a m
g y ��.. starting a+ 1 � -
(Awl
Test hole location Lot 8 , B 1 k .1, Co f fin site. Hole number 2 , Date hole was prepared 10 — 2 6 —9 3
Depth of hole bottoms+ 12 inches. Diameter of hole 6 Anches
Soil data from test hole:
Depth, inches
0 — 10"
10" — 12"
-Soil texture
Topsoil dark brown loam
Gray brown loam
Method of scratching side% all Knife
Depth of gravel in bottom of hole 2 inches
Date and hour of initial water filling 10-26-9 3 Dt�l1 taAf)%l eater filling 12 inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours___ Automatic siphon
. Maximum Natcr depth above hole bottom during test 6 inches
ime
Time
interval.
minutes
Measurenient.
inches
Drop in water
I level. inches
Percolation
rate.
minutes lxr
inch
Remarks
10:10
pre f111
6
10:23
10:38
3-9/16
4.2
15 min
10:47
11:02
3-7/16
4.4
"
11:05
11:20
_
3-3/8
4.5
"
11crcolation rate = 4 • 4—nnnwe� per inch.
CLkI . -vu627
PERCOLATION TEST DATA SHEET
S-P Testing, Inc. 10-27-93 10:24 a.m.,
Percolation tea readings made by �„+ starting at �'1W-
Test hole Imaiion Lot8,B1k.1,Coffin site �11olenumbLr 3 .DateWlewaF -)repared 10-26-93
Depth of hole txl(ton 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth. inches
Soil texture
0 - 10" Topsoil dark brown loam
10" - 12" Brown clay loam
IWcthal of scratching sidcw all K n i f e
Depth of gravel in tx)ttom of hole 2 inches
Date and hour of initial %%ater filling 10-26-9 &AIIdfMIN-ater filling 12 inches aKi%c hole txittom
P1c1h-ol u�rd to maintain at least 12 inche of %%ater depth in hole for at least a hours Automatic siphon
N-laxinwm %%titer depth atv\ c hole txtttom during test 6 inches
intr
Time
interval. Nlea%urcment.
minute inches
Percolation
Drop in \%ater rate.
le%cl.inches minutes per
inch
Remarks
10:10
prefill 6
10:24
10:54
3-7/8 7.8
30 min
10:55 t 11:25
11:32 i 12:02
»
i
t
t
I
I
Percolation rate = 7.8 minute p:r inch.
CERT.N00627
PERCOLATION TEST DATA SHEET '
trt.
Percolation test readings made by G—P TPc:t i nq , T nr- _ 1 0— 2,-91 starting at 10 : 26#Awn,
Test hole location Lot 8 , B 1 k .1, Co f f i n s i to Nole number 4 , Date hole was prepared 10— 2 6 — 9 3
Depth of hole bottom 12 inches, Diameter of hole 6 inches
Soil data from test hole:
Depth, inches
Soil texture
0 — 12" Topsoil dark brown loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
10-26-93 11:30am 12
Date and hour of initial %%ater filling , Depth of initial eater filling inches above hole bottom
Meth(A used to maintain at Ieast 12 inches of water depth in hole for at least 4 hours Automatic siphon
. Maximum water depth above hole bottom during test 6 aches
intc
Time
interval.
minute%
Measurement.
inches
Drop in water
level. inches
Percolation
rate,
minutes per
inch
Remarks
10:10
pre f111
6
10:26
10:41
3-3/16
4.7
15 min
10:45
11:00
"
11:06
11:21
PercAmoti rate = — 4 • 7 mmutes per inch.
CLM . RUU627
PERCOLATION TEST DATA SHEET
Percolation test rcadings made by S—P Testing, Inc. on 10-27-93 10: 27
startingat p.m.
Test hole Iodation Lot8,B1k.1,Coffin site ,Mole number 5 wI .Dateholewasprepared10-26-93
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches
Sail texture
0 - 10" Topsoil dark brown loam
10" - 12" Brown clay loam
Method of scratching sidcwall Knife
2
Depth of gravel in bottom of hole inches
10-26-9& 11: 30m 12
Date and hour of initial water filling pth of initial water filling inches atv%e Nile txittam
Method used to maintain at least 12 inches of u titer depth in hole for at least 4 hour, AL Loma t i e siphon
Maximum water depth ahow hole txxamt durin;_ tc•l 6 inches
Time Percolation
.'imc interval. Measurement. Drop in water rate. t Remarks
minutes ` inches level. incite, minutes par �
_ j _ inch
10 :10 pre f i l l iM 6 - - --
10:27 10:57 1 3-1/2 J-8.6 30 mii
10:58 11:28 3-3/16 9.4 "--
_11: 29 —11: 59 --- � -'--- "--- 3-3/ 16 9.4
I
Percolation rate = 9.1 nnnutcs per inch.
CERTA00627
PERCOLATION TEST DATA SHEET
S—P Testing, Inc „„ 10-27-93 10:28
Percolation test readings made by starting at p.m.
Teslholclocation Lot8,Blk.1, Coffin site 6 10-26-93
�liole number_ ,Date hole was prepare tt
Depth of hole bottom 12 inches, Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 — 12" Topsoil dark brown loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
10-26-93D11.3Pam 12
Datc and hour of initial water filling pt6 o tntttal w wer filling inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
6
Maximum «ater depth above hole bottom during test inches
iliw
Time
inters al.
minutes
Measurement.
inches
Drop in water
level. inches
Percolation
rate.
minutes per
inch
Remarks
_
10:10
pref111
I 6
_
10:28
10:43
3-1/4
4.6
1 15 min
10:44
10:59
3-1/4
4.6
"
11:07
11:22
3-1/16
4.7
"
Percolation rate = 4.6 minutes per inch.
CEi.? .,-rU0627
PERCOLATION TEST DATA SHEET
Percolation test readings made by S—P Testing, Inc. on 10-26-93 starting at 8:20 a.m.
Tcst hole lucat ion_ Lot 8 , B 1 k . 1 ,Coffin site Hole number 7 Date hole %% as prepared 10 — 2 5-9 3
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth. inches Soil texture
0 — 12" Topsoil dark brown loam
Method of .matching sidcN all Knife
Depth of gray el in bottom of hole 2 inches
10-25-93 2:30pm '2
Date and hour of initial water filling . Depth of initial dater filling inches above hole bottom
Method u%ed to maintain at least 12 inches of Hater depth in hole for at least J hours Automatic siphon
. Maximum water dr.,-'• +bo%c tole bottom during test 6 inches
Time
ime inter%al. Mcawrenent. Drop in eater
minute+ I inches le%el. inches
8:09
prefill
6
8:35
"
_8:20
8:45 9:00
"
i
Percolation
rate. Remark%
minutes per
inch
4-5116 3.5 15 min
4-3/16 3.6- " —
4-1/8 3.6 "
Percolau4m rate _ 3 . 6 --minutes Ixr inch
cERT-#00627
PERCOLATION TEST DATA SHEET i
a.m.
Percolation test readings made by R—P Testing ', T Nn - en 1 n-26-9 3starting at 8 : 1 ".m.
1&Wj
Test hoe location Lot ,C of f in site. Hole number 8 ,Date hole was prepared L O_ 3
Depth of hole bottom 12 inches, Diameter of hole 6 inches
Soil data from lest hole:
Depth, inches Soil texture
0 — 12" Topsoil dark brown loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
Date and hour of initial water filling- 10-25-9 14ll MUNI water filling 12 inches above hole bottom
Method u-.cd to maintain at leapt 12 inches of water depth in hole for at least 4 hours_ Automatic siphon
Maximum water depth above hole bottom during test 6 inches
.'ime
Time
interval.
minutes
Measurement.
inches
Drop in water
level, inches
Percolation
rate,
minutes per
irwh
Remarks
----
0:09
-----
pre fi11
—
6
8:21
8:36
4-1/2
3.3
15 min
8:44
8:59
"
4-1/4
3.5
"
9:02
9:17
4-3/16
3.6
"
Pcrc��l.�ti�m raft -- 3 . 5 mmute� her inch
CLRT. #00627
s
PERCOLATION TEST DATA SHEET
Percolation test readings made by S-P Testing, Inc. on_ 10-26-93 starting at 8 : 22 ni.
,Mw.
Test hole location Lot 8 , B 1 k .1, Cof fin site Hole number_ 9 . Date hole was prepared 10— 2 5-9 3
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth. inches
0 - 10"
lU" — 11"
Soil texture
Topsoil dart: brown loam
Brown clay loam
Methyl of scratchine sidew all Knife
2
Depth ul' gravel in ho[lom of hole inches
Date and hour of initial water filling 10-25-9 3 Ih2pth3o n� ial water tilling 12 inches above hole bottom
McthtKl used to n►aimain at least 12 inches of eater depth in hole fur at least 4 hours_.. Automatic siphon
6
Maximum water depth above hole bonom during lest inches
.-imc
Time
interval.
nunutcs
Measurement.
inches
I
Drop in water
Icsel.inches
Percolation
rate.
minutes per
inch
Remarks
8:09
prefill
6
8:22
j 8:37
I
3-3/8
4.5
15 min
8:43
8:58
;
3-1/4 !
4.6
"
9:03
9:18
-
3-1/4
4.6
"
i
Percolaw." .ate = 4.6 ininutes lser inch.
CLRT. #00627
s
PERCOLATION TEST DATA SHEET
Percolation test readings made by S-P Testing, Inc. on_ 10-26-93 starting at 8 : 22 ni.
,Mw.
Test hole location Lot 8 , B 1 k .1, Cof fin site Hole number_ 9 . Date hole was prepared 10— 2 5-9 3
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth. inches
0 - 10"
lU" — 11"
Soil texture
Topsoil dart: brown loam
Brown clay loam
Methyl of scratchine sidew all Knife
2
Depth ul' gravel in ho[lom of hole inches
Date and hour of initial water filling 10-25-9 3 Ih2pth3o n� ial water tilling 12 inches above hole bottom
McthtKl used to n►aimain at least 12 inches of eater depth in hole fur at least 4 hours_.. Automatic siphon
6
Maximum water depth above hole bonom during lest inches
.-imc
Time
interval.
nunutcs
Measurement.
inches
I
Drop in water
Icsel.inches
Percolation
rate.
minutes per
inch
Remarks
8:09
prefill
6
8:22
j 8:37
I
3-3/8
4.5
15 min
8:43
8:58
;
3-1/4 !
4.6
"
9:03
9:18
-
3-1/4
4.6
"
i
Percolaw." .ate = 4.6 ininutes lser inch.
CERT.#00627
PERCOLATION TEST DATA SHEET
Percolation test readings made by S—p Tpc4- i ny , i nr_ _ on_ 1 0-26-9 3 starting at 8 : 23 �:nr!
,.",i
Test hole location Lot 8 , B 1 k . 1, Co f f i n site Holenumber 10 , Date hole was prepared 10 — 2 5 — 9 3
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches
0 - 6"
6" - 12"
Soil texture
Topsoil dark brown clay loam
Brown clay loam
Method of scratching sidewall Knife
Depth of gra%cl in bottom of hole 2 inches
10-25-93 2:30pm 12
Date and hour of initial water filling , Depth of initial water filling inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
, Maximum water depth above hole bottom during test 6 inches
,'im.
Time
interval.
minutes
Measurement.
inches
Drop in water
level. inches
Percolation
rate.
I minutes per
inch
Remarks
8:09
pre f111
6
8:23 —
8:53
3-3/16
9.4
30 min
8:54`
9:24
2-15/16
10.2
«
9:25
9:55
2-13/16 10.7
P.rcolanon rate = 10.1 minutes per inch.
CLil'f . t:00627
PERCOLATION TEST DATA SHEET
S-P Testing, Inc. 10-26-93 8:24
Percolation test readings made by on starting at
Lot8,B1k.1,Coffin site it 10-25-93
Test hole location . Hole number . Date hole N as prepared
Depth of hole bottom 12 inches. Diameter of hole 6 inches
Soil data from test hole:
1"h.inches
0 - 10"
10" - 12"
WOW of scratching sideN all Knife
Soil tcxtilre
Topsoil dark brown loam
Brown clay loam
Depth of Lra%el in bottom al hole 2 inches
10-25-93 2:30pm 12
Date and lxlur of initial %cater fillinc . Depth of initial slater filling inches Avve hole twitom
Method used to maintain at (cast 1' inches of %%ater depth in hole frr at leas? 4 thour%- Ait tninat i c n i phnn
Maximum %%ater ckpth atxrvc hole tvilont during test 6 inches
Time — Percolation
.in►e internal. Measurement, Dro NSA. > rate.
minwes ( inches levy minutes I+er
inch
•09 Prefill 6
--8:-4 Z
9.; -4_
Remarks
8 _57 _ _ 5-1/-8- 2.. 9 l _
�3.0
� I
l
Percolation raw = _2_. 9 minutes per inch.
CERT.#00627
• 1 r
PERCOLATION TEST DATA SHEET
Percolation test readings made by S— P Testing, Inc.
on 10 — 2 6 — 9 3 starting ar 8 : 25 tm,?
rwr
Test hole location Lot 8 , B 1 k .1, Cof f i n site. Hole number 12 , Date hole was prepared 10 — 2 5-9 3
Depth of hole bottorr+ 12 inches. Diameter of hole 6 inches
Soil data from test hole:
Depth, inches
0 — 81@
8" — 12"
Method of scratching sidewall Knife
Soil texture
Topsoil dark brown loam
Brown clay loam
Depth of gravel in bottom of hole_ 2 inches
10-25-93 2:30pm 12
Date and hour of initial cater filling Depth of initial water tilling inches above hole bottom
Medial u%ed to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
Maximum %%titer depth above hole bottom during test 6 inches
.'ime
Time
interval.
minutes
Measurement.
inches
Drop in water
level, inches
Percolation
rate.
minutes per
inch
Remarks
8:09
pre f111
6
8:25
8:40
10
3-5/16
3-1/16
4.5
4.9
15 min
8_41
I 8:56
9:05
9:20
3
5.0
"
I
I'crcj,lcuiun true 4-8 6 minutes per inch.
F-K
WATER TIGHT 9 LOCKABLE ELECTRIC BOX —
PLUGS OR ELECTRIC CONNECTIONS
2' PVC CONDUIT SCHEDULE BD 6'SPACE
MANHOLE COVER CHAINED 9 LOCKEO� _T_
SEALED MANHOLE RINGS
SEALED TANK COVER -
PLASTIC ROPE OR CHAIN
WI711 ANCHOR--�`
ALARM FLOAT ON SEPARATE
ELECTRICAL CIRCUIT —
START_ IELVEL 9 — i
3.1
SHUT-Off—LE,VEt—Q _ __
PUMP CONTROL FLOAT- -
�TFiEATEDP�OST 4CT4 ml,l
�I�jCkLWXRIC CONVECTIONS MADE
LOOP OF POWER CORD FOR
SETTLEMENT
, r AT LEAST 12� nl)�
r, BELOW GRADE
WIRE FROM POWER SUPPLY
IL"PIIPME IS LAID ON A UNIFORM SLOPE FROM
p
FOR PPRggTATIOPER ON RUP TOACSK IL TREATMENT AnEA
IF PIPE AT TANK MUST 9E LOWER THAN
UNION. TO GET ELEVATION FOR DRAINBACK,
A 1/4 INCH WEEP HOLE MUST OE USED
— WEEP HOLE
NOTES: ELECTRICAL WIRE FROM POWER SUPPLY
MUST BE LAIID BESIDE OTHEN OVER ANY R TAN 91
AND MUST BE PLACED IN CONDUIT
ALONG POST
ELECTRICAL CORDS FROM PUMP AND
FLOATS MUST BE RIIN THROUGH
CONDUIT WIRF-S CANNOT HAVE GROUND
CONIACT.
METAL
COVER
I �
x r
CONCRETE � s�
MANHOLE
RING
METHODS OF SECURING MANHOLE COVER TO PREVENT
UNAUTHORIZED ENTRY
Figure C-14
rigurc F-g
SANDY LOAM SOIL--)
i
A0w.n OP A I ILE
MMIC
II/ OR 2'
PIPE FROM PUMP -� • `
1
CL?AN ROCK
6- TOPSOILS.
:t
SAj
LE
F'LL
cic rg"
T' i
BRDkEN YER
UP
i
ER
eAR I U� 4YE
LAYOUT OF PERFORATED PIPE LATERALS FOR
PRESSURE DISTRIBUTION IN MOUND
PERFOR•TEO PLASIIC PIPE
ACC'
PERFORATIONS SPACED 36 �rloN S/
ENO ON CENTER. RFORATION �MpR
VIEW SIZE WtAAY BE
z' MANIFOL D
�4¢ PIPF
PERFORATED
LATERALS
;..::,� �..?: •:; fir('°
DIVERSION FOR
SURr-ACE WATER
PERFORAl10N5 ON BOTIOM Or Y
PLASTIC ON
tWERNATE LOCATION
1 ,\ Of PIPE -ROM "pi
END CAP gyp.
��� FpAFtEp `�rERIL \ 2'PIPE FROM
of PLOWING CmAwKR
LAYER OF GEOTEIITILE
FABRIC
GRASS COVER
:LEAN SAND FILL—,,
IAAXIMUM SLOPE —�
3 TO I /'
TOPSOIL - L PLOWED OR 4,4
DISKED SURFACE —m
re"ORA/T�EDD1[L�ATow
ATOrsvll
CROSS SECTION A - A
tiw NG FROM
CmAmKft
W
PERFORATED
=_ LATERALS • �� �,
BED AREA J� ~
20
INCH I''R IA `
DIKE --_�_J°MAX. T ~�—OIILE—.a
�! TOTAL WIDTH
AN
END PERFORATION OF A PERFORATED LATE,461.
- Too"
I" SM/ t+rw N G«@■NN FrMk hr�•
_ w
r-C Kw
Imo, T I�r1rMNI1�
�. .t �
I ,h .. _ t • N MO ILA a S/M
-PwNraw Lowed r1
CNrw SW Larw Awrw N LawdiI
LI.y *w Sol p-opwir SawlIwr
NNr• PSUMS So" Ldyv
VERTICAL SIDEWALL SEPTIC TANK
-FINISHED GRADE
AT LEAST 6' TO 12' SOIL AT LEAST
I` 4' DIA. I COVER 4' DIA.
MIN AT LEAST 1" AT LEAST I"
' 1 T-'
-'� i I % 1 DIMENSIt N FOR TANKS W11N VERi1CAL=SIDES A 1NIOTN`W 24' MINIMUM
LENGTH,• ? TO 3 TIMES THE WIDTH
r- --
DIAME► R GO MINIMUM _
30 MINIMUM; 7e M_AXIMUM `_-
�A 0 2 D _ '
AT LEAST B 6' MINIMUMI 0.2 D MAXIMUM =
1' c ... o i o 6'
— - -AT LEAST 4 FEET --�
Murrs �
/ SNAINlrIIEsAIlfAi1A11/LI(SMIIIALIIfQ �►W/M7tCWf1AsIMlIRIOCAIlOMI111N11fMc1Is
f IIKIf SIWI N. Car. OntAV* 1 NOWS W ifAtl IF 11{ NaKall 0 VA"wo M 0=49W lit 11"Art
Ir1I1KtM/W/lf>rA111/L11P1rISIlU 11 AU INS 11Eot11RI1NAIIRQa/\OIOMOVEMIACCE111
wAlls S ;fI'AMIW ll4rerCt fr llMlMfMYfi gaffer Am
). AHOMICICUrdl Or Ar LEAs1 I01;1(SfMAW1901 WoMal POW Yrl$fflf OW&L W Atr1ES2 106MS DID*%
OnAYNMIaf UMA r4l0CAlE0fMn0011111* 14fT onwsOR n1NI1tN01111
NDf1111lElUEYf'Et 11E CUOEJiIK (t'IR rl11C1►ar • fGRlofXXIq CVLfffrMAI 1AM11S01KIM.MIIrAgl150
rv[ s sI Ml l m 11( AMC. As "It Ef MI l n l pw flr 11{ AIAIIM Opa" C M1 o flll
/MIUEA[MMOt dIvwIMII Ills A1//■I1rvicic"
1'01 501M W iCCAILO N Ire rM III lSl l AWI1111 f 1
rw rl rs
MET
:10,
CLEAN OUT TAM( WHEN:
X IS 3' OR LESS OR
'6' IS 12' OR LESS
DISHES SLUOGE
FROM LIOUID
b
MEASURE SCUM AND SLUDGE ACCUMULATIONS
IN THE SEPTIC T NIK.