HomeMy WebLinkAbout1300 Vine Place - Sewer Televising Report (292)Private Property Inflow And Infiltration Inspection Procedures
For Contractors
Sewer .Service Further investigation Issues
Properties found in need of further investigation have one or more of the following:
• unable to access sewer lateral due to un-located cleanouts (behind walls, under flooring, etc)
• unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc
• unknown connections (unable to verify connection flowing water into sewer lateral)
Sump Pump/Roof Leader Inspection Criteria And Process
• Inflow/Infiltration Compliance Inspection form
• Correctly plumbed sump pump discharges
must have the "Sump Pumps" and "Foundation
outside of the building using rigid pipe. Pipe
Drains" sections completely filled out for the
discharge should be a minimum of 10-feet from
inspection to be complete.
building.
• Every,sump'pump on the property is required to
Sump pumps that do not discharge outside
be inspected (including photos of the opened
are incorrectly plumbed and are considered
basket, the surrounding area, and the discharge
non -compliant.
pipe, both interior and exterior). Total number of
Roof leaders are required to discharge outside
sump pumps must be noted.
of the building; any roof leaders and or cisterns
• Sump pump discharge piping is required to be
discharging into foundation drains are non-
rigid pipe. Flexible pipe, shut-off valves,
compliant.
plumbing tees, and wyes are not allowed.
Completed Inspection
• Property owner is to sign the completed
The City will issue either a Certificate of
Inflow/Infiltration Compliance Inspection form and
Compliance or a Correction Notice once the
retain a copy for their records.
review is complete. If a correction notice is
• A copy of the completed Inflow/Infiltration
issued, the required repairs must be made and a
Compliance Inspection form and video link is
post -repair televised inspection must be
required to be delivered to the City of Orono for
performed in order to receive Certificate of
review.
Compliance.
• The City's Utilities Supervisor or his/her
• The completed forms will be mailed to the
designee will review the video and compare it with
address on the Inflow/Infiltration Compliance
the completed Inflow/Infiltration Compliance
Inspection form, unless a different address is
Inspection form
noted.
Contractor's Signature
Contractor completing the Inflow and Infiltration Compliance Inspection has read and
understands the conditions of the Private Property Inflow and Infiltration Inspection Procedures
for Contractors.
Company name
Inspector name
C..
Copy of plumbers license'
On file N IA (or) Attached
License number
WIA
Bond
Date
Staff Use Only
Date Received
Staff Name and Signature
g/is�as
fit � Sol ��
J
a �C 4 9(oq y9
Page 2 of 2