Loading...
HomeMy WebLinkAbout1300 Vine Place - Sewer Televising Report (292)Private Property Inflow And Infiltration Inspection Procedures For Contractors Sewer .Service Further investigation Issues Properties found in need of further investigation have one or more of the following: • unable to access sewer lateral due to un-located cleanouts (behind walls, under flooring, etc) • unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc • unknown connections (unable to verify connection flowing water into sewer lateral) Sump Pump/Roof Leader Inspection Criteria And Process • Inflow/Infiltration Compliance Inspection form • Correctly plumbed sump pump discharges must have the "Sump Pumps" and "Foundation outside of the building using rigid pipe. Pipe Drains" sections completely filled out for the discharge should be a minimum of 10-feet from inspection to be complete. building. • Every,sump'pump on the property is required to Sump pumps that do not discharge outside be inspected (including photos of the opened are incorrectly plumbed and are considered basket, the surrounding area, and the discharge non -compliant. pipe, both interior and exterior). Total number of Roof leaders are required to discharge outside sump pumps must be noted. of the building; any roof leaders and or cisterns • Sump pump discharge piping is required to be discharging into foundation drains are non- rigid pipe. Flexible pipe, shut-off valves, compliant. plumbing tees, and wyes are not allowed. Completed Inspection • Property owner is to sign the completed The City will issue either a Certificate of Inflow/Infiltration Compliance Inspection form and Compliance or a Correction Notice once the retain a copy for their records. review is complete. If a correction notice is • A copy of the completed Inflow/Infiltration issued, the required repairs must be made and a Compliance Inspection form and video link is post -repair televised inspection must be required to be delivered to the City of Orono for performed in order to receive Certificate of review. Compliance. • The City's Utilities Supervisor or his/her • The completed forms will be mailed to the designee will review the video and compare it with address on the Inflow/Infiltration Compliance the completed Inflow/Infiltration Compliance Inspection form, unless a different address is Inspection form noted. Contractor's Signature Contractor completing the Inflow and Infiltration Compliance Inspection has read and understands the conditions of the Private Property Inflow and Infiltration Inspection Procedures for Contractors. Company name Inspector name C.. Copy of plumbers license' On file N IA (or) Attached License number WIA Bond Date Staff Use Only Date Received Staff Name and Signature g/is�as fit � Sol �� J a �C 4 9(oq y9 Page 2 of 2