My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-10-25 Application for Septic System Permit
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2820 Deer Run Trail - 04-117-23-24-0015
>
Septic
>
1995-10-25 Application for Septic System Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 3:42:16 PM
Creation date
8/14/2025 3:39:22 PM
Metadata
Fields
Template:
x Address Old
House Number
2820
Street Name
Deer Run
Street Type
Trail
Address
2820 Deer Run Trail
PIN
0411723240015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO <br />Bok 66 (27S0 KeUey Parkway) <br />Crystal Bay, MN 55323 <br />SEPTICSYSTEM PERMIT APPUCATION <br />JOB SITE ADDRESS: ^ ^ <br />Occupancy Type: Residential _)( <br />Permit Type: <br />Commercial Other <br />New or Replacement System, $100.00 <br />Repair ExiRing System, $ 50.00 <br />(Tanks or Drainfiehl) <br />Y <br />0.50 State surcharge added to aboee fees <br />*See fee schedule for non-residentlal permit fees <br />Owner’s Name: /^> <br />Mailing Address: <br />VffVBifPAOMtnuCUtr's Name:____ <br />Mailing Address: Cok <br />PhoneNianbcr: <br />City:. <br />FhoneNumb«_ <br />City: <br />2h2zJUJJIL <br />ZhK T:r?r7 <br />DO NOT MAIL PAYMENT WITH THIS APPUCATION <br />CTWRUAI. INSTRUCTIONS <br />1. Applications for septic system permits may be mailed or submitted in person at the City <br />Offices; however, permits will not be mailed out. The permit must be picked up in <br />person at the City Offices and work must not begin unless the permit card is on the job <br />site. <br />2. Permits will be issued only to contractors holding a City of Orono Septic System <br />Installers License. <br />3. All work must be done in accordance with the approved septic syst^‘’=* design. Design <br />reports are not considered approved unless accompanied by the ”C A Orono Septic <br />System Approval” cover sheet signed by the City Inspector <br />4. The following inspections will be required for all septic systems: <br />A. Pre-installation site inspection to include inspector, installer, and general contractor. <br />B. Tank installation prior to covering. <br />C. Drainfield trench installation prior to covering. For mounds, inspection is required <br />after rough-up but prior to sand placement (sand will be jar tested for silt content). <br />iOd again during pressure distribution piping installation in the rock bed. <br />D. Final inspection to verify proper final cover depths and to verify that all pump station <br />(where required) components are functional and comply with codes. <br />5. Individual holding MPCA Installer Certificate shall be presemduring inspections. Aid- <br />hour notice is required for all inspections.
The URL can be used to link to this page
Your browser does not support the video tag.