My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-12-16 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2820 Deer Run Trail - 04-117-23-24-0015
>
Septic
>
1993-12-16 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 3:42:16 PM
Creation date
8/14/2025 3:36:56 PM
Metadata
Fields
Template:
x Address Old
House Number
2820
Street Name
Deer Run
Street Type
Trail
Address
2820 Deer Run Trail
PIN
0411723240015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tit <br />/ <br />S.V !# <br />a SEPT»'’ <br />crry of orono <br />APPROVAL <br />CITY of C* <br />MMridpriOaai <br />PMtOHIntaifCnfMBvftMtaMUSr <br />LOCATION; <br />Brian and Nancy SiskaOWNER: <br />GENERAL CONTRACTOR: Peter Andrea SEPTIC CONTRACTOR:_______________ <br />SITE EVALUATOR: Testing ___REPORT DATE: December 16, 1993 <br />The City of Orono has Approved <br />(approved-disapproved) <br />with Che following comments:______________ <br />^ your on-sUe system design as of June 2. 1995 <br />(date) <br />THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br />be issued to a licensed septic contractor prior to installation. A list of currently licensed s^c contractors is <br />enclosed. <br />NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br />Inspector (473-73S7). Call for inspections 24 houra in advance. <br />ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must reiuain <br />in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br />has verified that primary and alternate sites are adequately protected. <br />NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowv i within 20* <br />of tested drainfield sites either before or after system cofL:truction. Compaction of these areas could render them <br />unusable prohibiting the timely completion and or limiting the long term use of the property. <br />A site copy will be available at the City Offices for the septic contractor. <br />CITY OF ORONO <br />Steph^WdbmianI. On-site Systems Manager <br />TEUEniONE-47}.7)S7 • mX-41MSie <br />■
The URL can be used to link to this page
Your browser does not support the video tag.