Loading...
HomeMy WebLinkAbout1987-04-15 Septic System Design Report■ ^ TT Koch's Soil Testing P.O. Box 81 Loretto, MN 55357 Tel: (612)479-2637 c w Ac > > 4 '‘ V Vt,<- ■4c^x1C^<»-' j Oac -t^ ^ S ^ t iv P. I -MVn.%. SlV ?-4- 53 '4''-/J _ (c/CQ I JL^>^ - (p - 'yw-v>.//LVK.^ - 7.. - *4^I *1 — Mc/virvt^ I A-v^ _^tll ,,5&v .h A -0U->^ -o-J* — eit ^ 4 . 41 'tL r At r. (Lcmo^JiAoXvfAa c9/i u IV Kcbw.<c/>w ^^\JL ^y\ ,^ury\«u\Aj •Ou.ii- ^YJ\X. ■'•( <^ ic>-w''j':i.Vi' .»1jlii.(&8.(()j^ S AjliUox;-r>\J^' ..^ . u> y -A., • L K ,.c jy X ^o^'vju wO 3\c*tcfic^ ^ /O'W ''Wf ^ e. • • \ 1 -CW J:Jki> f>-'o;-<'-• U^AJU. vtATv/ lAa. 3-''- < «'j^ (Q uct^v|xa9(9 t<v»v/ /VA- Jl/rvr^A-'O^ < V N ^v. ^\_c (ix- ^ L *\-l'' vv_ Robert Koch (ix- £ L *\-l'' vv_ ' J?.UM mA-zi'^/o . MPCAc«*« lo.i B 3. 0-^co^<^ t3;wu-v\|.ti^ycV i!)a.'>-ACy >v , ____SffJS f'2-aaci- -^Y p 'it j?Mar\lf ^ lo'' h4^ C.ft/*>j$tu ,^^-jf X /bo l\s^ S’ ! - ,(• ‘■'W' b-r n fi:%- .;>. It ‘IF’''- OSSIQII UkUk STAMDAUD INDIVIDUAL VitiiATMElfr SISTEH A Sewage How Rate Ct>ased on ininnesota Rules, Table 11 Part 70bO Type House ^ BK___*'_/ S O gpd B 4- Septic TanK Volume: Ol^ cfiil ^ri-i tctertrtics: 1 Depth to iienc.oKi zone of saturation level mottled soil level inches 2 Average percolation rate ^Qt ^ min/inch design range ^ *3 mix^/inch 3 Soil sizing factor <3*0 0 ' a om ft./gpd li Land slope _______To______% ■ ' - -'^4 ■: ■K D Treatment Area ^Drainfield) required 1 Soil sizing factor X daily flow rate n n ft%pd X ^So gpd ■ %o 'i'lcVt- ” /c^<''i>^l^oimam soil trea^m^t area 3 U Maximum Trench da Trench width Ti’ench length L^nt area 5^^ft. /o O_ _ _ _ft 'N. • 0 o i o4l ‘ o sq rt trench bottom area ex trench width ^■/cC lineal ft. of trench needed Number of trenches needed Trench Sp^^ng ^ft. on center Distribution Number of drop boxes Rock depth r A (any slope) ' /Z " under pipe / 5? * total distribution box qratem Rock Volume * (a cu yds. tons ’ - ' V . Ik ’ - w*. ^ - .-;-.|>5|'T,t.- A-*^"', '-ms:': ■ V * ^' Set&aciC3i 1 Tank0t tnm property line / Q>trom well from buildings /1) .j/j'. 7S“|yf > ■ ■■-■ ■ i-0& “Treatment Area: ilTom laices from streams____ _____ iwna loo from property lines ! O li from buildings 3q /A- from trees ?- r- ■ l» ■> ~ I'l • ri lii iti ri'i'Mti ■ vi ILI COL') al �LW Se 7 z �� 3 Ay 9 �A,Q - 14uk r Logs__of^^^Soi]^jorlng8 ^ Location or Project 2. Borings made by ^P. _ _ _ _ _ _ _ _ ______^ Date ^_ _ _ Claaaification System: AASHO_ _ _; USDA-SCS ^ ; Unified_ _ _; other Auger nsed (check two): Hand _2L* Power_ _; Flight • or Bucket ^_; other Depth, in feet 1 — 2 — :io^ 3 — 4 — 5 — 6 — 7 — 8 — Borinjs nunber Surface elevation ^ CJPom^J cJbAoc^ t /End of boring at ^_ _ _ feet. Standing water table: Present at_ _ _ _feet of depth. _ _ _ _ _ _ hours after boring. Hot present in boring hole_}(_ Hot tied soil: . Observed at ^ ^ feet of depth. Mot present in boring hole Obsurvations and comnents: Depth, in feet Borine nunber ^ Surface elevation ^ 0 1 —-VWftQ r''\ja.*{^Qu^\SL /•» — \vOT'^i^irv^ sS^o^ C-cAcv^ 4 — e __ 5c^\ca..^ (».— 7 — 8 — End of boring at feet. Standing water table: Present at_ _ _ _feet of depth. » •hou^e efter boring. Not present in l(orlag hole Mottled eoil: __ Observed at ^ feet of depth. Mot present in boring hole Observations and eommentei i' i =\\ r' Logs of Soil Borings Location or Project^ Q fy}^ C.^uJ^aa y , Borings made by A . A^*>g>0_ _ _ _ _ _ _ _ _ _ _ _ _ _ Date ‘V‘**/*^ - ^'1 B-31 \ : Cleaftiflcation System: AASHO USDA-SCS ^_; Unified ; other ‘ Aeger nsad (check two): Hand K , or Power_ _; Flight • •. or Bucket X ; other Depth, in feet K‘I I . •SkVik. .* . t 1 — a — 3 — 6 — 7 — 8 — Boring nusi>er Surface elevation C9eM k^otv'V^M . rv(LtvSoC) ^ (^vA«*AiCr(«4-, G-c-^ CS«:-u^ Vs^xvno/O Bad of boring at feet. Standing water table: Present at _ _ _ _ feet of depth. hours after boring. !lot present In boring hole K Hottled soil: Obaarved at ^_ _ _ _ feat of depth. Hot present in boring hole _ _ _ _ Observations and corawnts: Depth,Boring number ^ In* _ _Surface elevation ^3 ^ .teat n'^ 2 — k.0-^ 3 — •s. / ‘A ■ :j-i . ; 4 — 5 — 6 — ■ .•' .'<■ :■• ' ;• ■■ ■ •: • •'. • <'■ ■ .•:* ■ ”■ ■ . . / ' ^ ’■•• *■■ j 'V ■ •'• .'v‘‘i". '- ■ ’ * '■;'•<'• ..^C' 8 —:;V-] .'i End of boring at Jfeet. Standing water thblet Present at _ _ _feet ef .impth, iL_j2_ Not present Inrboring heln s 1 l.i’i KottiMi "Oii^q u . J Observed et fnet nfjlepth. Mot preaen - In boring h^n Observations and 'benpenlfgf - %■ '^4 •. :’ Mi r>. I. \ ■ . f r' ■ » • . ... 'iJvfi/ ■ IS I-ogs p< ‘>oll Borings I«oca,tion or Project l>^cA 3 B-31 Clasftlflcotlon System: AASHO _ _ _; USDA-SCS ^ ; Unified_ _ _; other iUiger used (check two) : Hand __. ojf Power___; Flight or Bucket ^: other Mpth, in' feet 1 — 2 — 4 — 5 — 6 — 7 — 8 — Boring nunher jr Surface elevation 9S--C S^- au' End of boring at 3 feet. Standing water table: Present at _ _ _ _ feet of depth. _ _ _ _ _ _ hours after boring. Not present in boring hole ^ Mottled soil: Observed at of depth. Mot present in boring hole Observations and coioBents: Depth, in feet /j2_" 2 — 3 — 4 — 5 — 6 — 7 — Boring nusfier k2> 7 Surface elevation ^2 ^ C. Si^\ (/Vic^vO 5^ '■■4, *■! End of boring at feet. Standing water tables Present at _ _ _ __ feet of depth* h<Mrs after boring. Not present in^boring hole ^ Mottled Observed at r cx feet of depth. Not present in boring hole Observations and eoemantes • . Logs of Soil Borings Location or Project ^ ^ cD Borings nade by ^ Date Classification System: AASHO USDA-SCS ; Unified ; other Auger used (check two): Hand ^ . or Power_ _; Flight ■ '. or Bucket ^ ; other Depth, in feet 1 — ;fo 2 — 3 — 4 — 5 — 6 — 7 — 8 — Borf.ng nuidier r Surface elevation /tfs. C. 5 Is. End of boring at iiM feet. Standing water table: Present at _ _ _ _ feet of depth. hours after boring. Not present In boring hole ^ Mottled soil: Observed at feet of depth. Not present In goring hole Observations an^ C9«aents: Depth, in feet 1 — IS". 2 — 4. -1- 3 ~ _4 — 5 —- 6 — 7 —. 8 — Boring nuabar Surface elevation <77- ca^ 0 T«\iuS 4. A._ _ _ _ ^ 1 ; I } • , « ■ i-a^ End of boring at a yStanding water tabler Present at _ _ _ _feet of depth, . . * 'hours after boring. Not present ii^ boring hole\ Kottlcd .oll:,A I, Observed at ^ !A *p f^t of depth. Not present in boring hole . Observations and couMita: 1^' B-39 PERCOLATION TEST DATA SHEET TMt holm locAtlon 3 ^PJJlL c? ntaiber ^ C lkit« t««t hols was oroporo d "V - / 3 — ^ 7 . Depth of hole botton, /? Inches. DioMtor of hole, ^ Inches. Soil 4Ate frott test hole: Depth* laches Soil texture o->cP (^Peu^J^ ‘^■OtL^TTvO f ^t^TCbLvvSL_______ V Method of eeretehinR eldewell Depth of pee-elsed gravel in bottom of hole, Dete sad hour bf initial water filling - V 7 Depth of initial water filling, _ _ _ _ inches above hole bottom. inches.. *9 A Method used to maintain at least 4 hours —7^QxJfevn<i,jfc^ 12 inches of water depth in hole for at least _ _ ___ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ Percolation test readings made by V—~ V *7 starting at _ _ USSa T“ ^ >P, Ar'c^ V Mudaui wat.r d.pth lAo.. hoi. bottoal>.m. during teat,inches. ^ — 3 c:^ 2- O -V 3*/ /c? -5 di // O Tima Interval, Minutes 3o • Measurement, inches :S 3^ •5” Drop in water level, inches Percolation rate, minutes per inch Remarks Percolation rate "minutes per inch. T‘V '•V ■ < V ■ 1* ♦ •' B-39 PERCOLATION TEST DATA SHEET T«at hole location 3 ftPR 3 Hole nunber 3> c*>u.i ^ _ _• Depth of hole bottom. ) inches.'^Date teat hole vaa prepated J '-i ' Diameter of hole, Co inches. Soil data from test bole: Depth*‘inches CD-- /V Soil texture _ _ Cju^ / Mttho4 of ocrotehliio aidowall Depth of pea-sised gravel in bottom of hole*inches.. inches above hole bottom. Date sad hour bf initial water filling 5 > V 7 Depth o' initial water filling, __ _ _ _ _ _ _ Method used to ms'} fn at least 12 inches of water depth in hole for at least 4 hours -.^rnn Percolation test readings made by _ y 7 starting at_ _ _ Hite5 ^ / during test,_ _ _ _ _6> inchss. L.m. -p.m.Maximum water depth above hole bottom Tims Time Interval, Minutes Measurement, inches Drop in water level, inches Percolation • rate, minutes per inch Remarks c/ o ^ f 3 3cj S' 93 'T (y>, , ycf 'o ff 3>cy . yoo 7 * • yy> 5 7 •Ttcy -V5T • yc ^9 U // 07 e , 0 • • • t Percolation rate •minutes per Inch. JlJ PBICOLATIOH TEST DATA SHEET B-39 iMt hoU location /^c. C*cJ^ gol^ nunber ^ ^ Onto tMC hole WM propared 3 -y / ^ , pep^^ of hole botton. /V Inchaa/ Diaattar of hole. Ip inches. Soil'iiaea froa test hols: Daptli* inchaa O " _ Soil tafttura _ Hithod of •cratehian sidavall aJ^ Depth of paa-aisad gravel in bottom of hole, inchest. Date and hour bf initial water filling P Depth of initial water filling./ ^ inches above hole bottom. Method used to maintain at least 12 inches of water depth in hole for at least 4 hours ^ PercoUtion test readings made by /C^q^A j_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — •tartlng at- - -2!_ _Mazlaum water depth above hole bottom Ci> (date) during test,inches. AiP <^ £ y/j yp //y^ Time Interval, Minutes Measiirement, incites \y> • Drop in water level, inches '^ief Percolation rate, minu^^ per inch KLCi 4 Percolation rate ■a U)ntnutes per inch.J PEHCOLATIOW TEST DATA SHEET B-39 nxmbmr VvuU*TMt hfilm locmtlooA<^ ^ Z VcvW^t^ Hole Dete test hole wee prepared 3>-^ 7 ' . pepth^ of hole bottow. ; C Inches. DlsMter of hole, ^ inches. Soil 4sts froa test hole: Depth/ inches /(o" Soil texture C-O-QcvQ Hethod of scra^hlas sidewall Vv)gl(? Depth of pes*slsed gravel in botton of hole, _ _ _ _inches.. Date and hour hf initial water filling ^ r^. Depth of Initial water filling.f X-inches above hole bottoa. Hethod used to naintain at least 12 inches of water depth in hole for at least 4 houra _ _ _ _ _ _ _ _ Percolation test readings nade by_ _ I^ '* tn V-/V^ V7 {data) during test. starting at -p^Haxina water depth above hole bottoe inches. Tine TIm Interval, Minutes Measurement, incites Drop in water level, inches Percolation • rate, minutes per inch Bamsrks c? 9 V c^3>0 lyy *^CJ /Lo , /' /•S’ ••• yo 3 Jf>r>H/ft.?r • Z//' ^'^//u?IhZ “ •• 1 1 J ♦ • # • • Percolation rate ■i minutes per inch. y FERCOLATIOW TEST DATA SHEET B-39 T*»t hola location flT\e „.^t SC Onto toot hole on. propnrm. .' n«,th of holo botton. / <b Inchon. OlAMtar of holo, Co Inchos. Soil 4oto froa toot holo: Dopth»*Inehoo O- H " l±V'~l(c.< Sgll tozturo ^vX>ttOry0 Hothod of ocroiehliiA oidonoll VO(XvJl Inchooo..Dopth of poo-olsod grovol in bottoo of holo, _ _ _ _ _ __ _ _ Doto 04 hour bf Inltiol voter filling j ^ XVYV^ Dopth of Initiol voter filling, 1 "U inchoo obovo hoU bottoo. Hothod used toooint^^ at looot 12 inchoo of voter dopth in holo for ot looot 4 honro Porcolotion toot roodingo node by — <i 7 otorting ot ^TSS^ during toot, _ _ _ _inchoo. o'.n^ ■ p.loT*Hoxinuo voter dopth obovo holo bottoo a TiM TiM Interval, Ninutoo Meoourenent, inclioa Drop in voter level, inchoo Porcolotion • rote, oinutoo per inch Boaorko 9y 2 Lr% " 2 ^ V •*5 "Oia Zo /"?•• y o 3 c.*/'T_• C,' yz -_ .\• ># . . • Percolation rate tpO minutes per inch. ij B-39 PBECOLATION TEST DATA SHEET T#it hoi# loc#tioii tV\c Hoi# nuabor (oL. Dot# t##t holt «a# pr#p#r#d SL 9 Depth of hole bottoa. \ Co inches. Di#Mt#r of hole, to Inches. Soil 4#t# froa t##t hole: Depth*‘inches O- / o" Soil texture90&X • i;«jreur« CQ P^eL/yx^^ «M - ~VaSS^MO rtwil • Hethod of ecretehln^ eldevell Depth of pee-elsed trcvel in bottom of hole, Cq inches.. Date end hour bf initial voter filling* 9ft h- Depth of Initiel voter filling, i inches obove hole bott< Hethod used to nointoin ot least 12 inches of voter depth in hole for ot leoet 4 houroL^ (/yy\ nAc. Percolation teat readings node by (a# storting ot ^ UStmi ~ during toot,_ _ __ _ _ _ _inches. p.n.Maximum voter depth obove hole bottom Time Tims Interval, Minutes Measurement, inches Drop in voter level, inches Percolation • rote, minutes per inch loamrks ‘7/ V . . . jL. . .Vo.Csrj C.. /o'/ii C^.*S *1-* /O Jf ^ u • • /c -/v 3C V/Zo • /O i'i/ // *2*/30 •7^/fa U9.,Y • % r • .# • • -• a- t ■ \ Percolation rate -minutes per inch. ddSSTRUCTION SPECIFICATIONS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. II. 12. 13. 14. All construction• unless otherwise noted, is to be performed in strict sccordsnce irith the provisions of MN Rules, Part 7080, Individual Sewage Treatment Systems Standards. Any deviation from this design shall be approved in %rriting by the owner or his representative. The drainfisld treatment area will be staked out by the owner or his representative before construction. Construction vehicle traffic within this area shall be limited to backhoe and/or small tracked vehicles before, during, and after construction. \ Trench construction shall not occur if soil moisture has reached or surpassed plastic limit. Trench bottoms and rock shall be installed level and parallel to surface contours as nearly as possible. Only clean, insoluble rock 3/4" to 2 1/2" mean diameter shalli be Installed in trenches. t Sewer pipe shall be 4" diameter, schedule 40 PVC or of greater strength. Distribution pipe shall be 4** diameter PVC with a minimum 1,000 lbs. crushing strength and one row of 1/2" diameter holes spaced no greater than 36" apart and installed at the 6 o'clock position. Pipes shall be installed level with a slope variance of no more than 2" in 50* down and away from drop boxes. Drop box inlets and outlets shall be as noted in the drawings. Drop boxes shall be installed on firm, natural soil as will sewer pipe connecting drop boxes. Trench rock shall be covered with 4" of straw and untreated building paper or a thin, permeable, synthetic fabric from trench wall to trench wall leaving no rock uncovered. Capped inspection pipes shall be Installed at the end of each trench as noted in the drawings. Pipes shall extend 4" above final grade. The septic tank shall be a vertical sidewall, watertight, corrosion-resist^t, one-piece, precast concrete tank with gasketed lid. The lid shall ha^ a miniinim 20" diameter manhole burled between 6" and 12" deep and 4" dapped inspection pipes extending 4^' above grade, centered over the inlet and outlet baffles as noted in the drawings. J Septic tank baffles shall be made of acid resistant plastic or fiberglass and attached with at least four corrosion-resistant connections per baffle. 4" *tary tees may be used in place of baffles. Final grauing upslope of the drainfield area shall provide for diversion of runoff away from the drainfield, as shall grading around the septic tank. 15. Turf establishment shall be the responsibility of the owner. -4-