HomeMy WebLinkAbout1981-04-18 Septic System Design ReportI SITR EVALUATION RSPOBT JENSEN BOMSB Lot 6, Block 2 MoCULLEY FARM 4-18-81 On April 15, 1981 six percolation holes were dug 6 inches in diameter and 3 feet in depth. These holes were tested on April 17 at which time the soil borings were dug 6 inches in difaeter'to the 4 foot depth and 3 inches in diameter to the 8 foot depth, The per- colation holes were dug with both a power auger and a bucket type hand auger while the soil borings were dug with the hand augers, The primary site is located west of the proposed house at the toe of a steeper slope where quite a bit of bleak loam had been deposited over the Tars. Because the better soil exists near the surface a shallow trench system should be installed with the tren- ches being no deeper than one foot in the natural soil. Also, since the drainfield area is located at the toe of the slope an intercep- tor drain should be installed above the drainfield to divert any runoff water from entering the treatment area. This trench should be a couple of feet lower than the drainfield trenches with drain - tile being placed in the bottom and rook placed over the top. A few inches of black dirt can then be placed at the surface to es- tablish a grass cover. Additional design information follows. If any other informa- tion is needed, please contact me. Sincerely. PSRCORt INC. Mark 13, Gronberg. P.R. JEI32N HOMES Percolation Results Hole a No, Eat eria_l r-1 Black Loam P-2 Black Loan r-3 Black Loam r-4 Black Loam r-> Brown Sandy Loan P-6 Brown Loam re-rcolation state 10.9 hin./inch 10.9 10.4 9.2 3.5 10.0 'ilia avert. -ad percol ration rat- ! tho prig~:ary sitell-µ) is 10.4 N-P-I, he average pnrcointlon rate for the alternate site is 6.8 I.P.I. Soil Bor i nas Day th(r^T. i IIf 1 o.o-3.5 Bl�- jam 3.5-5.o Black Clay Loam 5.0->.5 Dk..Brn. Clay Loam 5.5-r.0 Yellow Brn. Clay Loam 7.0-8.0 Brown Sandy Clay(wet) No water table after 24 hours and mottled soil at 'i feet. J.B 2evthlf� Material 000- 0 0 Black Loam 4.0-6.5 Lt, Brown Clay Loam 6.5-8.0 Brown Sandy Clay 7.0-8.0 Brown Clay Loam No water table after 24 hours and mottled soil at 'I feet, :;.B. -4 Devth(PT. 0,0-2.0 2.U-5.> -1.0 7,0-0.0 Matte Black Loam Bran Loam Dk. Brown Clay Loam Lt. Brown Clay Loam Water table at 4.5 ft. after 24 hours and mottled soil at 4.5 feet. J:MC, 0 HOMS Svstem 14sign le percolation Rate, Type of System 10.4 minutes p-tr inch. Shallow trench system. 2. Prono -.ad ' 1 ow Rato ajt 3 be -:r.ls U 150 G.P.D. : 450 G.P.D. 41 ISJe = 600 5 JJ 3. moil Treatment Area Required Use factor of 1.61 times- 750 or-q50 sq, ft, of area. r � � 00 /000 -size and Pumbe of Trenches. Use trenches 100 feet long and 2.5 feet wide for the required aroa. Tronoheo should be spaced at least 7 feet center to center. 14 . Rook 3e uui re d For 6 inches of rook below the pipe and 2 inches over the 4 inch pipe '38cubic yards of rook would be required. 6. :optic Tanks Required Two tanks should be used and be of at least 1000 gallon capacity. "In addition, the second tank should have a pumping compartment to allow for installation of a liquids pump to distribute the efflu- ant to the higher drainfield area. n� _M �M D D� zm Z cz _D— c Z DG) Z f: r Z rrn I m x LO cRz 4 s fT1 Q r z :r 0 D 1 = m M F m WI f N m I s-a a