Loading...
HomeMy WebLinkAboutSeptic System LayoutFORM A S’ VILLAGE OF ORONO CRYSTAL BAY, MINNESOTA Contractor’s Nam«> ^C. C/k J /u S "PERMIT NO^ RECEIPT NO.- ''S Contractor’s Address__>£^C f_________________ Owner’s Name________________________________ Vg> ^2)/ h!Owner’s Address. DRAWING Nai It. iX' ^e foUowing information shall be furnished in the above drawings as referred to in Section 20, paragraph 45 of the Village of Orono Building Ordinance. 1. All distances, in feet, shall be plaLily marked on Drawing No. 1. 2. Measturements shall be taken from the two farthest comers of the building where a straight line can be obtained to the cleanouts of the first and second septic tanks and to the distribution box. Mark these distances, in feet, on Drawing No. 2. 8. Indicate approximate well location with the letter “W” on Drawing No. 2. 4. Check direction of sewage or waste disposal system as shown on Drawing No. 2.