Loading...
HomeMy WebLinkAbout1105 Brown Road South - Sewer Televising Report (294)oo Date Called in Date Scheduled City Of Orono Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form Property Address: 1105 Brown Road South PID: 11011723240004 Owner Information Name: Nicole Middendorf Mailing Address: (if different from Property) Phone: 612m3604355 I Email: INicole@prosperwell.com Ins ector Information Name: Hunter Gille Company/ Organization City of Orono License number: Phone: 952-2494686 Email: Ins ection System Standard Pass Fail Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary sewer but should discharge to the ground outside of a building. If the roof drains are connected to the sanitary sewer, disconnect them, plug any open connections to the sanitary sewer using a non -shrink permanent material, and redirect the roof drains onto the ground outside the building. Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump system includes drain tile, a sump pit, a sump pump, a float or switch, and a drain line. Sump pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (1/I) Compliance Inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and s ecifications. Details on back of this sheet) Notes: Reviewed repair video from Marvel Sewer and Drain for: two 2' patch repairs to be installed through outside clean out for mineral deposits at 113' and 125'. Passed inspection and in compliance through 7-2&2035 - Hunter Gille Toilet Removed o Yes o No For Inspection: City Ins ectors Signature: Date: Owners Signature: Date: Review Com liant ❑ Corrective Action Re uired Certificate of Compliance Expires: 7-28-2035 Corrective Action Due by: Date: 7-29-2025 Signature: Name: Heather Smieja