Loading...
HomeMy WebLinkAbout3745 Togo Road - Sewer Televising Report (130)Private Property Inflow And Infiltration Inspection Procedures For Contractors Pu ose The following instructions and standards aro intonded for proporty owners and their contractors when choosing to use a private contractor to completo the Point of Sale Sanitary Sewer Service Inflow and Infiltration (I/[) Inspection. Private inspection contractors will need to complete the inspection using � tl�e City of Orono's Inflow/Infiltration Inspection Form, available on the City website, Inspectors will require access to the basement or lowest level in the home or building and access to all sewer cleanouts, sump pump(s), and sump pump plumbing. The televised portion of the I/I inspection is to note defects in the sanitary sewer lateral, which result in infiltration and ex -filtration. The purpose of the private property inflow and infiltration (UI) inspection is to reduce the flow of clear water into the sa�iitary sewer system via cross connections (inflow) from sump pumps, foundation drains, roof leaders, cisterns, and other clean water sources connected to the sanitary sewer system. In addition, the program aims to reduce indirect flow of clean water into the sanitary sewer system (infiltration) throu i e and i e 'oint defects. Video /Picture Standards • The video report will be in a MPEG format • Still photos will be in a JPEG format • Video reports can be submitted on thumb drives or a USB hard drive. • Reference the start and end of each video segment as it begins. • Footages along the sewer service line must be shown on the video report. • The video camera shall be guided forward at a moderate to slow pace along the bottom of the pipe. • The camera shall stop at any connection. • The camera shall stop at any unusual instances that are viewed while in progress and provide a more etailed and Ion er view of the s ecific instance i.e. —bad 'oint, dirt in lines, settlement in line, etc. . Sewer Service Ins action Criteria And Process • Inflow/Infiltration Compliance Inspection form •All floor drains will need to be opened and must be completely filled out for the inspection to inspected (include photos of the drain, the be complete. surrounding area, and the nearest foundation • The inspector is required to note all defects and wall). footage location in the sanitary sewer lateral on •Any foundation drains found will need to be the compliance inspection form and an audio opened and the discharge point verified (include description recorded on USB Thumb drive or hard photos). drive. •All external drains will need to be opened and • The sewer service inspection must the service the discharge point verified pipe from before it exits the building to the sewer •Defects/items that require documentation main. include, but are not limited to: • All connections must be verified by flowing ➢roots water into drains, referencing the source, and ➢offset pipe joints reporting them on the video ➢mineral deposits • Any connection that cannot be verified is ➢ unlmown deposits considered to be an unknown connection and ➢ sag/pipe deflection must be exposed to verify source. ➢cracked pipes • All cleanouts are required to be opened and ➢chipped pipes inspected (include photos of the opened cleanout ➢Pipe size transitions riser); cleanout inspection requires documented � ➢length of service footage location on the form and audio . ➢location of all cleanouts description recorded on USB Thumb drive or hard ➢broken /damaged or missing pipe drive. foundation drain connections (including photos). Page 1 of 2 J Private Property Inflow And Infiltration Inspection Procedures For Contractors Sewer Service rurther investigation Issues III Mail liiiiiiiiiiiiii Properties found in need of further investigation have one or more of the following: • unable to access sewer lateral due to un-located cleanouts (behind walls, under flooring, etc) • unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc • unknown connections (unable to verify connection flowing water into sewer lateral) Sump Pump/Roof Leader Inspection Criteria And Process • Inflow/Infiltration Compliance Inspection form must have the "Sump Pumps" and "Foundation Drains" sections completely filled out for the inspection to be complete. Every sump pump on the property is required to be inspected (including photos of the opened basket, the surrounding area, and the discharge pipe, both interior and exterior). Total number of SUMP pumps must be noted. • Sump pump discharge piping is required to be rigid pipe. Flexible pipe, shut-offvalves, lumbin tees, and es are not allowed. Completed Inspection • Property owner is to sign the. completed Inflow/Infiltration Compliance Inspection form and retain a copy for their records. • A copy of the completed Inflow/Infiltration Compliance Inspection form and video link is required to be delivered to the City of Orono for review. • The City's Utilities Supervisor or his/her designee will review the video and compare it with the completed Inflow/Infiltration Compliance Inspection form Contractor's Signature • Correctly plumbed sump pump discharges outside of the building using rigid pipe. Pipe discharge should be a minimum of 10-feet from building. • Sump pumps that do not discharge outside are incorrectly plumbed and are considered non -compliant. • Roof leaders are required to discharge outside of the building; any roof leaders and or cisterns discharging into foundation drains are non- compliant. • The City will issue either a Certificate of Compliance or a Correction Notice once the review is complete. If a correction notice is issued, the required repairs must be made and a post -repair televised inspection must be performed in order to receive Certificate of Compliance. • The completed forms will be mailed to the address on the Inflow/Infiltration Compliance Inspection form, unless a different address is noted. Contractor completing the Inflow and Infiltration Compliance Inspection has read and understands the conditions of the Private Property Inflow and Infiltration Inspection Procedures for Contractors.0000 &JA uya„y "�!1° f� ,/► •/�1 �/► Inspector name helms .S�►�J/ I C ���// ,0,^•I � 1 Copy of plumbers license "I On file Z&4Z4=144)0(or) Attached License number I StaffUse Only . Date Received Staff Name and Sieiature Bond Date 6�/fir-z.5 Page 2 of 2