Pu ose
The following instructions and standards aro intonded
for proporty owners and their contractors when
choosing to use a private contractor to completo the Point of Sale Sanitary Sewer Service Inflow and
Infiltration (I/[) Inspection. Private inspection contractors will need to complete the inspection using �
tl�e City of Orono's Inflow/Infiltration Inspection Form, available on the City website, Inspectors will
require access to the basement or lowest level in the home or building and access to all sewer
cleanouts, sump pump(s), and sump pump plumbing.
The televised portion of the I/I inspection is to
note defects in the sanitary sewer lateral, which result
in infiltration and ex -filtration. The purpose of
the private property inflow and infiltration (UI) inspection is to reduce the flow of clear water into the
sa�iitary sewer system via cross connections (inflow) from sump pumps, foundation drains, roof
leaders, cisterns, and other clean water sources connected to the sanitary sewer system. In addition,
the program aims to reduce indirect flow of clean water into the sanitary sewer system (infiltration)
throu i e and i e 'oint defects.
Video /Picture Standards
• The video report will be in a MPEG format
• Still photos will be in a JPEG format
• Video reports can be submitted on thumb drives or a USB hard drive.
• Reference the start and end of each video segment
as it begins.
• Footages along the sewer service line must be shown on the video report.
• The video camera shall be guided forward at a moderate to slow pace along the bottom of the pipe.
• The camera shall stop at any connection.
• The camera shall stop at any unusual instances that are viewed while in progress and provide a more
etailed and Ion er view of the s ecific instance i.e. —bad
'oint, dirt in lines, settlement in line, etc. .
Sewer Service Ins action Criteria And Process
• Inflow/Infiltration Compliance Inspection form
•All floor drains will need to be opened and
must be completely filled out for the inspection to
inspected (include photos of the drain, the
be complete.
surrounding area, and the nearest foundation
• The inspector is required to note all defects and
wall).
footage location in the sanitary sewer lateral on
•Any foundation drains found will need to be
the compliance inspection form and an audio
opened and the discharge point verified (include
description recorded on USB Thumb drive or hard
photos).
drive.
•All external drains will need to be opened and
• The sewer service inspection must the service
the discharge point verified
pipe from before it exits the building to the sewer
•Defects/items that require documentation
main.
include, but are not limited to:
• All connections must be verified by flowing
➢roots
water into drains, referencing the source, and
➢offset pipe joints
reporting them on the video
➢mineral deposits
• Any connection that cannot be verified is
➢ unlmown deposits
considered to be an unknown connection and
➢ sag/pipe deflection
must be exposed to verify source.
➢cracked pipes
• All cleanouts are required to be opened and
➢chipped pipes
inspected (include photos of the opened cleanout
➢Pipe size transitions
riser); cleanout inspection requires documented
� ➢length of service
footage location on the form and audio .
➢location of all cleanouts
description recorded on USB Thumb drive or hard
➢broken /damaged or missing pipe
drive.
foundation drain connections (including
photos).
Page 1 of 2
J
Private Property Inflow And Infiltration Inspection Procedures
For Contractors
Sewer Service rurther investigation Issues
III Mail liiiiiiiiiiiiii
Properties found in need of further investigation have one or more of the following:
• unable to access sewer lateral due to un-located cleanouts (behind walls, under flooring, etc)
• unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc
• unknown connections (unable to verify connection flowing water into sewer lateral)
Sump Pump/Roof Leader Inspection Criteria And Process
• Inflow/Infiltration Compliance Inspection form
must have the "Sump Pumps" and "Foundation
Drains" sections completely filled out for the
inspection to be complete.
Every sump pump on the property is required to
be inspected (including photos of the opened
basket, the surrounding area, and the discharge
pipe, both interior and exterior). Total number of
SUMP pumps must be noted.
• Sump pump discharge piping is required to be
rigid pipe. Flexible pipe, shut-offvalves,
lumbin tees, and es are not allowed.
Completed Inspection
• Property owner is to sign the. completed
Inflow/Infiltration Compliance Inspection form and
retain a copy for their records.
• A copy of the completed Inflow/Infiltration
Compliance Inspection form and video link is
required to be delivered to the City of Orono for
review.
• The City's Utilities Supervisor or his/her
designee will review the video and compare it with
the completed Inflow/Infiltration Compliance
Inspection form
Contractor's Signature
• Correctly plumbed sump pump discharges
outside of the building using rigid pipe. Pipe
discharge should be a minimum of 10-feet from
building.
• Sump pumps that do not discharge outside
are incorrectly plumbed and are considered
non -compliant.
• Roof leaders are required to discharge outside
of the building; any roof leaders and or cisterns
discharging into foundation drains are non-
compliant.
• The City will issue either a Certificate of
Compliance or a Correction Notice once the
review is complete. If a correction notice is
issued, the required repairs must be made and a
post -repair televised inspection must be
performed in order to receive Certificate of
Compliance.
• The completed forms will be mailed to the
address on the Inflow/Infiltration Compliance
Inspection form, unless a different address is
noted.
Contractor completing the Inflow and Infiltration Compliance Inspection has read and
understands the conditions of the Private Property Inflow and Infiltration Inspection Procedures
for Contractors.0000
&JA
uya„y "�!1° f� ,/► •/�1 �/► Inspector name
helms .S�►�J/ I C ���//
,0,^•I � 1
Copy of plumbers license "I
On file Z&4Z4=144)0(or) Attached
License number
I StaffUse Only
. Date Received Staff Name and Sieiature
Bond
Date
6�/fir-z.5