Loading...
HomeMy WebLinkAbout2794 Casco Point Road - Sewer Televising Report (95)�•csl� #� `16a19 Date Called in �N�\1� Date Scheduled a 0 s �. , City Of Orono '�,+ �a��' Point of Sale Sanitary Sewer Service I&I CompIIance Inspection Form Property Address: Z. q C.ctiSc o (�� � � ,, zA�4 � s`g--�3 P1D: o�tall3-a3 aoo �g Owner Information Name: old ; •o.w c� Mailing Address: (if different from Pro e Phone: (ol - d • 6 61 y Email: n w%c, �w.p � .co,.� Ins ector Information Name: Company/ Organization lc cvcov� I i o bONO � f jVKVK .C, OVj p it W���j' (�F : � S C-F� License number: -Pc. �� mc0 G 3 Phone: 61 Z� 3 GG -72d)6 Email: � Il W�{� ,ta; �. ,� ,, , . u Ins ection S stem Standard Pass Fail Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary sewer but should discharge to the ground outside of a building. If the roof drains are connected to the sanitary sewer, disconnect them, plug any open connections to the sanitary sewer using anon -shrink permanent rnalerial, and redirect the roof drains onto the ound outside the buildin . Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump system includes drain tile, a sump pit, a sump pump, a float or switch, and a drain line. Sum um s should not be connected to the sanita sewer. Sewer Service Sanitary Sewer Inflow &Infiltration (I/I) Compliance Inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and s ecifications. Details qn back of this sheet Notes: �(�hoC Scale �,..��fl •w1' 'i ra..��!v�--7' cnS=- 1re„w. T�0.wS'ii-w...- `fv / r�r �{�e � ara�otc�c�., �� fa(-:!- T :,.� �v.{mod v�oko {ti.lM A�u c�'ays J7v�t�v►.s [.+�. atio{ �'KsP�c�Ia�, 1s � � w,trv� c l o � � e v Ins ectors Si afore: Date: Owners si afore: Date: Ci Review Com liant ❑ Corrective Action Re aired Certificate of Com liance Ex Tres: -;ap � p Corrective Actio Due b : Date: `�' � oZ 3 -aS Si afore: Name: � �� Service Line Inspection Details Weather Conditions: Approximate Depth of Service Type and Size of Service q I J— 6 Overall Condition of Service Pipe Please note all connections, fittings, points of concern on service line including infiltration, tree root, cracks, misaligned joints, etc. This report must include a digital copy of the televising. Feet Comment Example: 0 Start for 4" cleanout in NE corner of Basement 140 Misaligned joint —Infiltration Q-25 PVC, ^p SI C^ate;'" ,c-+� rya^., tM•�hc Se,.�C.0 1r�-N� —^irk,,.', ,� Gj � I G�I-.� Co h•wc.c. f � -.� Notes: 0*u�o Private Property Inflow And Infiltration Inspection Procedures For Contractors Purpose The following instructions and standards are intended for property owners and their contractors when choosing to use a private contractor to complete the Point of Sale Sanitary Sewer Service Inflow and Infiltration (I/I) Inspection. Private inspection contractors will need to complete the inspection using the City of Orono's Inflow/Infiltration Inspection Form, available on the City website. Inspectors will require access to the basement or lowest level in the home or building and access to all sewer cleanouts, sump pump(s), and sump pump plumbing. The televised portion of the 1/I inspection is to note defects in the sanitary sewer lateral, which result in infiltration and ex -filtration. The purpose of the private property inflow and infiltration (I/I) inspection is to reduce the flow of clear water into the sanitary sewer system via cross connections (inflow) from sump pumps, foundation drains, roof leaders, cisterns, and other clean water sources connected to the sanitary sewer system. In addition, the program aims to reduce indirect flow of clean water into the sanitary sewer system (infiltration) through pipe and pipe joint defects. Video / Picture Standards • The video report will be in a WEG format • Still photos will be in a JPEG format • Video reports can be submitted on thumb drives or a USB hard drive. • Reference the start and end of each video segment as it begins. • Footages along the sewer service line must be shown on the video report. • The video camera shall be guided forward at a moderate to slow pace along the bottom of the pipe. • The camera shall stop at any connection. ' • The camera shall stop at any unusual instances that are viewed while in progress and provide a more detailed and lon er view of the specific instance i.e. — bad joint, dirt in lines, settlement in line etc.). Sewer Service Inspection Criteria And Process • Inflow/Infiltration Compliance Inspection form • All floor drains will need to be opened and must be completely filled out for the inspection to inspected (include photos of the drain, the be complete. surrounding area, and the nearest foundation • The inspector is required to note all defects and wall). footage location in the sanitary sewer lateral on • Any foundation drains found will need to be the compliance inspection form and an audio opened and the discharge point verified (include description recorded on USB Thumb drive or hard photos). drive. • All external drains will need to be opened and • The sewer service inspection must the service the discharge point verified pipe from before it exits the building to the sewer • Defects/items that require documentation main, include, but are not limited to: • All connections must be verified by flowing ➢ roots water into drains, referencing the source, and ➢ offset pipe joints reporting them on the video ➢ mineral deposits • Any connection that cannot be verified is ➢ unknown deposits considered to be an unknown connection and ➢ saglpipe deflection must be exposed to verify source. ➢ cracked pipes • All cleanouts are required to be opened and ➢ chipped pipes inspected (include photos of the opened cleanout ➢ Pipe size transitions riser); cleanout inspection requires documented ➢ length of service footage location on the form and audio ➢ location of all cleanouts description recorded on USB Thumb drive or hard ➢ broken / damaged or missing pipe drive. foundation drain connections (including photos). Page 1 of 2 Private Property Inflow And Infiltration Inspection Procedures For Contractors Sewer Service Further Investigation Issues Properties found in need of further investigation have one or more of the following: • unable to access sewer lateral due to un-located cleanouts (behind walls, under flooring, etc) • unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc • unknown connections (unable to verify connection flowing water into sewer lateral) Sump Pump/Roof Leader Inspection Criteria And Process • Inflow/Infiltration Compliance Inspection form • Correctly plumbed sump pump discharges must have the "Sump Pumps" and "Foundation outside of thq building using rigid pipe. Pipe Drains" sections completely filled out for the discharge should be a minimum of 104eet from inspection to be complete. building. • Every sump pump on the property is required to • Sump pumps that do not discharge outside be inspected (including photos of the opened are incorrectly plumbed and are considered basket, the surrounding area, and the discharge non -compliant, pipe, both interior and exterior). Total number of • Roof leaders are required to discharge outside sump pumps must be noted. of the building, any roof leaders and or cisterns • Sump pump discharge piping is required to be discharging into foundation drains are non- rigid pipe. Flexible pipe, shut-off valves, compliant. plumbing tees, and wyes are not allowed. Completed Inspection • Property owner is to sign the completed • The City will issue either a Certificate of Inflow/Infiltration Compliance Inspection form and Compliance or a Correction Notice once the retain a copy for their records, review is complete. If a correction notice is • A copy of the completed Inflow/Infiltration issued, the required repairs must be made and a Compliance Inspection form and video link is post -repair televised inspection must be required to be delivered to the City of Orono for performed in order to receive Certificate of review. Compliance. • The City's Utilities Supervisor or his/her • The completed forms will be mailed to, the designee will review the video and compare it with address on the Inflow/Infiltration Compliance the completed Inflow/Infiltration Compliance Inspection form, unless a different address is Inspection form noted. Contractor's Signature Contractor completing the Inflow and Infiltration Compliance Inspection has read and understands the conditions of the Private Property Inflow and Infiltration Inspection Procedures for Contractors. Company name name TInspector All on: S Dro iq3 La c� L< c�e,�c�>v� � Copy of plumbers license On file (or) Attached License number Bond Date ?c �7 (Vo (0 -a5 Staff Use Only Date Received Staff Name and Signature G Page 2 of 2