HomeMy WebLinkAbout2794 Casco Point Road - Sewer Televising Report (95)�•csl� #� `16a19
Date Called in
�N�\1� Date Scheduled a 0
s �. , City Of Orono
'�,+ �a��' Point of Sale Sanitary Sewer Service I&I CompIIance Inspection Form
Property Address: Z. q C.ctiSc o (�� � � ,, zA�4 � s`g--�3
P1D: o�tall3-a3 aoo �g
Owner Information
Name: old ; •o.w c�
Mailing Address:
(if different from
Pro e
Phone: (ol - d • 6 61 y Email: n
w%c, �w.p � .co,.�
Ins ector Information
Name:
Company/ Organization
lc cvcov� I i o bONO � f jVKVK .C, OVj
p it W���j' (�F : � S C-F� License number: -Pc. �� mc0 G 3
Phone:
61 Z� 3 GG -72d)6
Email:
� Il W�{� ,ta; �. ,� ,, , .
u
Ins ection
S stem
Standard
Pass
Fail
Roof Drains
Roof drains and leaders Roof drains should not be connected to the sanitary
sewer but should discharge to the ground outside of a building. If the roof
drains are connected to the sanitary sewer, disconnect them, plug any open
connections to the sanitary sewer using anon -shrink permanent rnalerial, and
redirect the roof drains onto the ound outside the buildin
.
Foundation
Foundation drains are underground pipes that collect storm water from
Drains
around the base of a building and into a sump basket, where it is then
pumped outside of the building. Foundation drains should not be connected
to the sanitary sewer.
Sump Pumps
Sump pumps are designed to capture surface or ground water that enters
basements or crawl spaces and pump it away from the house. The basic sump
system includes drain tile, a sump pit, a sump pump, a float or switch, and a
drain line. Sum um s should not be connected to the sanita sewer.
Sewer Service
Sanitary Sewer Inflow &Infiltration (I/I) Compliance Inspection Sanitary
Line
Sewer Lines. All sanitary sewer lines serving Property, from the house to the
main line, shall be in a safe and functional condition and shall be free from all
leaks, failures including but not limited to partially collapsed sections or tree
root intrusion. The sanitary sewer lines shall meet the City Code standards and
s ecifications. Details qn back of this sheet
Notes:
�(�hoC Scale �,..��fl •w1' 'i ra..��!v�--7' cnS=- 1re„w.
T�0.wS'ii-w...- `fv / r�r �{�e � ara�otc�c�., �� fa(-:!-
T :,.�
�v.{mod v�oko {ti.lM A�u c�'ays J7v�t�v►.s [.+�. atio{ �'KsP�c�Ia�,
1s � � w,trv� c l o � � e v
Ins ectors Si afore: Date:
Owners si afore: Date:
Ci Review
Com liant ❑ Corrective Action Re aired
Certificate of Com liance Ex Tres: -;ap � p Corrective Actio Due b :
Date:
`�' � oZ 3 -aS
Si afore:
Name: �
��
Service Line Inspection Details
Weather Conditions:
Approximate Depth of Service
Type and Size of Service
q I J— 6
Overall Condition of Service Pipe
Please note all connections, fittings, points of concern on service line including infiltration, tree root,
cracks, misaligned joints, etc.
This report must include a digital copy of the televising.
Feet Comment
Example:
0 Start for 4" cleanout in NE corner of Basement
140 Misaligned joint —Infiltration
Q-25 PVC,
^p SI C^ate;'" ,c-+� rya^., tM•�hc Se,.�C.0 1r�-N� —^irk,,.', ,�
Gj � I G�I-.� Co h•wc.c. f � -.�
Notes:
0*u�o
Private Property Inflow And Infiltration Inspection Procedures
For Contractors
Purpose
The following instructions and standards are intended for property owners and their contractors when
choosing to use a private contractor to complete the Point of Sale Sanitary Sewer Service Inflow and
Infiltration (I/I) Inspection. Private inspection contractors will need to complete the inspection using
the City of Orono's Inflow/Infiltration Inspection Form, available on the City website. Inspectors will
require access to the basement or lowest level in the home or building and access to all sewer
cleanouts, sump pump(s), and sump pump plumbing. The televised portion of the 1/I inspection is to
note defects in the sanitary sewer lateral, which result in infiltration and ex -filtration. The purpose of
the private property inflow and infiltration (I/I) inspection is to reduce the flow of clear water into the
sanitary sewer system via cross connections (inflow) from sump pumps, foundation drains, roof
leaders, cisterns, and other clean water sources connected to the sanitary sewer system. In addition,
the program aims to reduce indirect flow of clean water into the sanitary sewer system (infiltration)
through pipe and pipe joint defects.
Video / Picture Standards
• The video report will be in a WEG format
• Still photos will be in a JPEG format
• Video reports can be submitted on thumb drives or a USB hard drive.
• Reference the start and end of each video segment as it begins.
• Footages along the sewer service line must be shown on the video report.
• The video camera shall be guided forward at a moderate to slow pace along the bottom of the pipe.
• The camera shall stop at any connection. '
• The camera shall stop at any unusual instances that are viewed while in progress and provide a more
detailed and lon er view of the specific instance i.e. — bad joint, dirt in lines, settlement in line etc.).
Sewer Service Inspection Criteria And Process
• Inflow/Infiltration Compliance Inspection form • All floor drains will need to be opened and
must be completely filled out for the inspection to inspected (include photos of the drain, the
be complete. surrounding area, and the nearest foundation
• The inspector is required to note all defects and wall).
footage location in the sanitary sewer lateral on • Any foundation drains found will need to be
the compliance inspection form and an audio opened and the discharge point verified (include
description recorded on USB Thumb drive or hard photos).
drive. • All external drains will need to be opened and
• The sewer service inspection must the service the discharge point verified
pipe from before it exits the building to the sewer • Defects/items that require documentation
main, include, but are not limited to:
• All connections must be verified by flowing ➢ roots
water into drains, referencing the source, and ➢ offset pipe joints
reporting them on the video ➢ mineral deposits
• Any connection that cannot be verified is ➢ unknown deposits
considered to be an unknown connection and ➢ saglpipe deflection
must be exposed to verify source. ➢ cracked pipes
• All cleanouts are required to be opened and ➢ chipped pipes
inspected (include photos of the opened cleanout ➢ Pipe size transitions
riser); cleanout inspection requires documented ➢ length of service
footage location on the form and audio ➢ location of all cleanouts
description recorded on USB Thumb drive or hard ➢ broken / damaged or missing pipe
drive. foundation drain connections (including
photos).
Page 1 of 2
Private Property Inflow And Infiltration Inspection Procedures
For Contractors
Sewer Service Further Investigation Issues
Properties found in need of further investigation have one or more of the following:
• unable to access sewer lateral due to un-located cleanouts (behind walls, under flooring, etc)
• unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc
• unknown connections (unable to verify connection flowing water into sewer lateral)
Sump Pump/Roof Leader Inspection Criteria And Process
• Inflow/Infiltration Compliance Inspection form
• Correctly plumbed sump pump discharges
must have the "Sump Pumps" and "Foundation
outside of thq building using rigid pipe. Pipe
Drains" sections completely filled out for the
discharge should be a minimum of 104eet from
inspection to be complete.
building.
• Every sump pump on the property is required to
• Sump pumps that do not discharge outside
be inspected (including photos of the opened
are incorrectly plumbed and are considered
basket, the surrounding area, and the discharge
non -compliant,
pipe, both interior and exterior). Total number of
• Roof leaders are required to discharge outside
sump pumps must be noted.
of the building, any roof leaders and or cisterns
• Sump pump discharge piping is required to be
discharging into foundation drains are non-
rigid pipe. Flexible pipe, shut-off valves,
compliant.
plumbing tees, and wyes are not allowed.
Completed Inspection
• Property owner is to sign the completed
• The City will issue either a Certificate of
Inflow/Infiltration Compliance Inspection form and
Compliance or a Correction Notice once the
retain a copy for their records,
review is complete. If a correction notice is
• A copy of the completed Inflow/Infiltration
issued, the required repairs must be made and a
Compliance Inspection form and video link is
post -repair televised inspection must be
required to be delivered to the City of Orono for
performed in order to receive Certificate of
review.
Compliance.
• The City's Utilities Supervisor or his/her
• The completed forms will be mailed to, the
designee will review the video and compare it with
address on the Inflow/Infiltration Compliance
the completed Inflow/Infiltration Compliance
Inspection form, unless a different address is
Inspection form
noted.
Contractor's Signature
Contractor completing the Inflow and Infiltration Compliance Inspection has read and
understands the conditions of the Private Property Inflow and Infiltration Inspection Procedures
for Contractors.
Company name
name
TInspector
All on: S Dro iq3 La c�
L< c�e,�c�>v� �
Copy of plumbers license
On file (or) Attached
License number
Bond
Date
?c �7 (Vo (0
-a5
Staff Use Only
Date Received
Staff Name and Signature
G
Page 2 of 2