Address: 258 Cygnet P1.
Permit M's: 5826, 2864 Dates: 11/26/79, 9/22/71 Contractors: Widmer Bros., Sullivan
(This is [ I an existing system ( I new construction).
SYSTEM COMPLIANCE (1-3): 3
1 Code System: Meets or exceeds current City standards in all respects relating to design,
construction, and location. Appears to be operating properly.
2 Compliant System: Does not meet all current City standards for new construction, but in
most respects appears to be designed, located, and constructed in accordance with previous
codes and is functioning properly.
Non -Compliant System: System may or may not meet current City standards for design,
construction, or location, but is failing to properly treat and dispose of the current
input; and any system with less than three feet of vertical separation between the bottcr,,
of the drainfield and the saturated soil level.
(The saturated soil level ( has or ( ) has not been identified at this time. If the
saturated soil level has not een identified, this classification is subject to revision.)
TANK CONDITION (5-9): 9
5 Pumpout not needed at this time.
6 Solids accumulation in tanks indicates they should be pumped out this year.
7 System is discharging to the surface. Tanks must be pumped out within 48 hours.
8 Inspection risers missing -tanks could not be inspected. If tanks have not been pumped out
within three years, they should be pumped out and risers installed now.
Inspection pipe is located over tank baffle -can not measure solids accumulation. If tanks
have not been pumped out within three years, they should be pumped out now.
(During the last septic tank Maintenance Pumpout the tanks [ ) were or (x) were not confirmed
to be watertight by the licensed pumping contractor. If the tanks were not confirmed to be
watertight, this classification is subject to revision.)
Ri�kINFIELD CONDITION (11-14): 11
1 Drainfield is dry, no surfacing evident.
2 Some evidence of surfacing, not critical yet. Repair is not required at this time.
13 Drainfield is saturated and visibly discharging untreated effluent to the surface.
Contact the City Inspector immediately. Repair must be completed within 90 days.
14 Drainfield extent and condition unknown.
POTENTIAL FOR SYSTEM FAILURE: (system age and condition, soils, etc.): medium
COMMENTS: In order to confirm that your septic system meets Minnesota standards, soil borings
were performed to verify a 3 foot separation between the drainfield and the seasonal water
table. The separation is 0 feet and the system is non -compliant. Connection to municipal
sewer is required by 3/24/98.
?:.-K
Date of Inspection Sept System finspector
Note: In the event that this inspection report is used to satisfy the requirements for a
transfer of property, this report does not guarantee that an existing system will continue to
function properly, but indicates the operation of the system under current conditions.