Loading...
HomeMy WebLinkAbout1984-12-17 Letter, Septic Rehab to Wait Until SpringCITY of ORONO Post Office Box 66•Crystal Ba, %'innesota 55323•MunicipaI Offices On the North Shore of Lake Minnetonka December 17, 1984 Mr. Robert Provo 220 Cygnet Place Long Lake, MN 55356 Dear Mr. Provo: I met with Duane Ha l stad on your property on Monday, December 10, to discuss the mound sewage treatment system he will be installing to replace your currently failing sy-:tem. He and I concurred that the soil conditions were too wet to properly install the system, and it will have to wait until spring. Please be advised again that you will have to take whatever steps are necessary to keep the discharge to a minimum until the new system can be installed. Ple�.�e contact me if you have any questions. Sincerely, Mi, :,ael P. Gaffron Septic System Inspector ps pc: Duane Halstad Contracting, Inc. Maryann Hernandez, Hennepin County Thomas J. Jacobs, Building Official BUILDING A ZONING - 473.7337 • AlAIMSTRATION A I INANCIE -- 473 7358 • PUBLIC WORKS -• 47 3.7 359 ASSESSING